Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times (2023)
- Authors:
- USP affiliated authors: NAGANO, MARCELO SEIDO - EESC ; MIYATA, HUGO HISSASHI - EESC
- Unidade: EESC
- DOI: 10.5267/j.jpm.2022.12.001
- Subjects: PROGRAMAÇÃO DA PRODUÇÃO; PROGRAMAÇÃO DINÂMICA; ENGENHARIA DE PRODUÇÃO
- Agências de fomento:
- Language: Inglês
- Imprenta:
- Source:
- Título: Journal of Project Management
- ISSN: 2371-8366
- Volume/Número/Paginação/Ano: v. 8, n. 2, p. 99-118, 2023
- Este periódico é de acesso aberto
- Este artigo é de acesso aberto
- URL de acesso aberto
- Cor do Acesso Aberto: gold
- Licença: cc-by
-
ABNT
SOUZA, Edson Antonio Gonçalves de et al. Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times. Journal of Project Management, v. 8, n. 2, p. 99-118, 2023Tradução . . Disponível em: https://dx.doi.org/10.5267/j.jpm.2022.12.001. Acesso em: 01 jan. 2026. -
APA
Souza, E. A. G. de, Nagano, M. S., Miyata, H. H., & Abreu, L. R. de. (2023). Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times. Journal of Project Management, 8( 2), 99-118. doi:10.5267/j.jpm.2022.12.001 -
NLM
Souza EAG de, Nagano MS, Miyata HH, Abreu LR de. Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times [Internet]. Journal of Project Management. 2023 ; 8( 2): 99-118.[citado 2026 jan. 01 ] Available from: https://dx.doi.org/10.5267/j.jpm.2022.12.001 -
Vancouver
Souza EAG de, Nagano MS, Miyata HH, Abreu LR de. Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times [Internet]. Journal of Project Management. 2023 ; 8( 2): 99-118.[citado 2026 jan. 01 ] Available from: https://dx.doi.org/10.5267/j.jpm.2022.12.001 - Optimizing distributed no-wait flow shop scheduling problem with setup times and maintenance operations via iterated greedy algorithm
- Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance
- Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization
- Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study
- The blocking flow shop scheduling problem: a comprehensive and conceptual review
- An iterated greedy algorithm for distributed blocking flow shop with setup times and maintenance operations to minimize makespan
- An evolutionary clustering search for the total tardiness blocking flow shop problem
- Solutions methods for m-machine blocking flow shop with setup times and preventive maintenance costs to minimise hierarchical objective-function
- Procedure structuring for programming aircraft maintenance activities
- An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time
Informações sobre o DOI: 10.5267/j.jpm.2022.12.001 (Fonte: oaDOI API)
Download do texto completo
| Tipo | Nome | Link | |
|---|---|---|---|
| jpm_2022_19.pdf | Direct link |
How to cite
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas