The blocking flow shop scheduling problem: a comprehensive and conceptual review (2019)
- Authors:
- USP affiliated authors: NAGANO, MARCELO SEIDO - EESC ; MIYATA, HUGO HISSASHI - EESC
- Unidade: EESC
- Sigla do Departamento: SEP
- DOI: 10.1016/j.eswa.2019.06.069
- Subjects: SCHEDULING; FLUXOGRAMA; LOJAS
- Agências de fomento:
- Language: Inglês
- Imprenta:
- Publisher: Elsevier Ltd
- Publisher place: Oxford
- Date published: 2019
- Source:
- Título: Expert Systems with Applications: an international journal
- ISSN: 0957-4174
- Volume/Número/Paginação/Ano: v. 135, p. 130-156, Dec. 2019
- Este periódico é de assinatura
- Este artigo NÃO é de acesso aberto
- Cor do Acesso Aberto: closed
-
ABNT
MIYATA, Hugo Hissashi e NAGANO, Marcelo Seido. The blocking flow shop scheduling problem: a comprehensive and conceptual review. Expert Systems with Applications: an international journal, v. 135, p. 130-156, 2019Tradução . . Disponível em: https://doi.org/10.1016/j.eswa.2019.06.069. Acesso em: 01 jan. 2026. -
APA
Miyata, H. H., & Nagano, M. S. (2019). The blocking flow shop scheduling problem: a comprehensive and conceptual review. Expert Systems with Applications: an international journal, 135, 130-156. doi:10.1016/j.eswa.2019.06.069 -
NLM
Miyata HH, Nagano MS. The blocking flow shop scheduling problem: a comprehensive and conceptual review [Internet]. Expert Systems with Applications: an international journal. 2019 ; 135 130-156.[citado 2026 jan. 01 ] Available from: https://doi.org/10.1016/j.eswa.2019.06.069 -
Vancouver
Miyata HH, Nagano MS. The blocking flow shop scheduling problem: a comprehensive and conceptual review [Internet]. Expert Systems with Applications: an international journal. 2019 ; 135 130-156.[citado 2026 jan. 01 ] Available from: https://doi.org/10.1016/j.eswa.2019.06.069 - Optimizing distributed no-wait flow shop scheduling problem with setup times and maintenance operations via iterated greedy algorithm
- Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance
- Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times
- Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization
- Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study
- An iterated greedy algorithm for distributed blocking flow shop with setup times and maintenance operations to minimize makespan
- An evolutionary clustering search for the total tardiness blocking flow shop problem
- Solutions methods for m-machine blocking flow shop with setup times and preventive maintenance costs to minimise hierarchical objective-function
- Procedure structuring for programming aircraft maintenance activities
- An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time
Informações sobre o DOI: 10.1016/j.eswa.2019.06.069 (Fonte: oaDOI API)
Download do texto completo
| Tipo | Nome | Link | |
|---|---|---|---|
| PROD_23954_SYSNO_3041362.... |
How to cite
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
