Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study (2018)
- Authors:
- USP affiliated authors: NAGANO, MARCELO SEIDO - EESC ; MIYATA, HUGO HISSASHI - EESC
- Unidade: EESC
- Sigla do Departamento: SEP
- DOI: 10.1080/0305215X.2018.1485903
- Subjects: MANUTENÇÃO PREVENTIVA; HEURÍSTICA; SCHEDULING
- Agências de fomento:
- Language: Inglês
- Imprenta:
- Publisher: Taylor & Francis
- Publisher place: Abingdon
- Date published: 2018
- Source:
- Título do periódico: Engineering Optimization
- ISSN: 0305-215X
- Volume/Número/Paginação/Ano: v. 51, n. 4, 2018
- Este periódico é de assinatura
- Este artigo NÃO é de acesso aberto
- Cor do Acesso Aberto: closed
-
ABNT
MIYATA, Hugo Hissashi e NAGANO, Marcelo Seido e GUPTAB, Jatinder N. D. Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study. Engineering Optimization, v. 51, n. 4, 2018Tradução . . Disponível em: https://doi.org/10.1080/0305215X.2018.1485903. Acesso em: 18 abr. 2024. -
APA
Miyata, H. H., Nagano, M. S., & Guptab, J. N. D. (2018). Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study. Engineering Optimization, 51( 4). doi:10.1080/0305215X.2018.1485903 -
NLM
Miyata HH, Nagano MS, Guptab JND. Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study [Internet]. Engineering Optimization. 2018 ; 51( 4):[citado 2024 abr. 18 ] Available from: https://doi.org/10.1080/0305215X.2018.1485903 -
Vancouver
Miyata HH, Nagano MS, Guptab JND. Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study [Internet]. Engineering Optimization. 2018 ; 51( 4):[citado 2024 abr. 18 ] Available from: https://doi.org/10.1080/0305215X.2018.1485903 - Optimizing distributed no-wait flow shop scheduling problem with setup times and maintenance operations via iterated greedy algorithm
- Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times
- Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization
- Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance
- An iterated greedy algorithm for distributed blocking flow shop with setup times and maintenance operations to minimize makespan
- Solutions methods for m-machine blocking flow shop with setup times and preventive maintenance costs to minimise hierarchical objective-function
- An evolutionary clustering search for the total tardiness blocking flow shop problem
- The blocking flow shop scheduling problem: a comprehensive and conceptual review
- An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time
- Procedure structuring for programming aircraft maintenance activities
Informações sobre o DOI: 10.1080/0305215X.2018.1485903 (Fonte: oaDOI API)
Download do texto completo
Tipo | Nome | Link | |
---|---|---|---|
PROD_23935_SYSNO_3040118 ... |
How to cite
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas