Procedure structuring for programming aircraft maintenance activities (2018)
- Authors:
- USP affiliated authors: NAGANO, MARCELO SEIDO - EESC ; REIS, VIVIANE SOUZA VILÉLA JUNQUEIRA DOS - EESC ; MIYATA, HUGO HISSASHI - EESC
- Unidade: EESC
- Sigla do Departamento: SEP
- DOI: 10.1108/REGE-02-2018-0026
- Subjects: GESTÃO DE PROJETOS; AERONAVES
- Language: Inglês
- Imprenta:
- Source:
- Título: Revista de Gestão - REGE
- ISSN: 2177-8736
- Volume/Número/Paginação/Ano: v. 27, n. 1, p. 2-20, 2018
- Este periódico é de acesso aberto
- Este artigo é de acesso aberto
- URL de acesso aberto
- Cor do Acesso Aberto: gold
- Licença: cc-by
-
ABNT
JUNQUEIRA, Viviane Souza Vilela e NAGANO, Marcelo Seido e MIYATA, Hugo Hissashi. Procedure structuring for programming aircraft maintenance activities. Revista de Gestão - REGE, v. 27, n. 1, p. 2-20, 2018Tradução . . Disponível em: https://doi.org/10.1108/REGE-02-2018-0026. Acesso em: 09 nov. 2024. -
APA
Junqueira, V. S. V., Nagano, M. S., & Miyata, H. H. (2018). Procedure structuring for programming aircraft maintenance activities. Revista de Gestão - REGE, 27( 1), 2-20. doi:10.1108/REGE-02-2018-0026 -
NLM
Junqueira VSV, Nagano MS, Miyata HH. Procedure structuring for programming aircraft maintenance activities [Internet]. Revista de Gestão - REGE. 2018 ; 27( 1): 2-20.[citado 2024 nov. 09 ] Available from: https://doi.org/10.1108/REGE-02-2018-0026 -
Vancouver
Junqueira VSV, Nagano MS, Miyata HH. Procedure structuring for programming aircraft maintenance activities [Internet]. Revista de Gestão - REGE. 2018 ; 27( 1): 2-20.[citado 2024 nov. 09 ] Available from: https://doi.org/10.1108/REGE-02-2018-0026 - Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times
- Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization
- Optimizing distributed no-wait flow shop scheduling problem with setup times and maintenance operations via iterated greedy algorithm
- Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance
- An evolutionary clustering search for the total tardiness blocking flow shop problem
- Solutions methods for m-machine blocking flow shop with setup times and preventive maintenance costs to minimise hierarchical objective-function
- An iterated greedy algorithm for distributed blocking flow shop with setup times and maintenance operations to minimize makespan
- The blocking flow shop scheduling problem: a comprehensive and conceptual review
- Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study
- An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time
Informações sobre o DOI: 10.1108/REGE-02-2018-0026 (Fonte: oaDOI API)
Download do texto completo
Tipo | Nome | Link | |
---|---|---|---|
PROD_23933_SYSNO_3039914.... | Direct link |
How to cite
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas