Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance (2021)
- Authors:
- USP affiliated authors: NAGANO, MARCELO SEIDO - EESC ; MIYATA, HUGO HISSASHI - EESC
- Unidade: EESC
- Sigla do Departamento: SEP
- DOI: 10.5267/j.ijiec.2021.5.002
- Subjects: SISTEMAS DE PRODUÇÃO; PROGRAMAÇÃO DA PRODUÇÃO; MANUTENÇÃO PREVENTIVA; HEURÍSTICA
- Agências de fomento:
- Language: Inglês
- Imprenta:
- Publisher: Growing Science
- Publisher place: Vancouver
- Date published: 2021
- Source:
- Título: International Journal of Industrial Engineering Computations
- ISSN: 1923-2926
- Volume/Número/Paginação/Ano: v. 12, p. 415-426, 2021
- Status:
- Artigo publicado em periódico de acesso aberto (Gold Open Access)
- Versão do Documento:
- Versão publicada (Published version)
- Acessar versão aberta:
-
ABNT
YAMADA, Tuane Tonani e NAGANO, Marcelo Seido e MIYATA, Hugo Hissashi. Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance. International Journal of Industrial Engineering Computations, v. 12, p. 415-426, 2021Tradução . . Disponível em: https://doi.org/10.5267/j.ijiec.2021.5.002. Acesso em: 05 abr. 2026. -
APA
Yamada, T. T., Nagano, M. S., & Miyata, H. H. (2021). Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance. International Journal of Industrial Engineering Computations, 12, 415-426. doi:10.5267/j.ijiec.2021.5.002 -
NLM
Yamada TT, Nagano MS, Miyata HH. Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance [Internet]. International Journal of Industrial Engineering Computations. 2021 ; 12 415-426.[citado 2026 abr. 05 ] Available from: https://doi.org/10.5267/j.ijiec.2021.5.002 -
Vancouver
Yamada TT, Nagano MS, Miyata HH. Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance [Internet]. International Journal of Industrial Engineering Computations. 2021 ; 12 415-426.[citado 2026 abr. 05 ] Available from: https://doi.org/10.5267/j.ijiec.2021.5.002 - Solutions methods for m-machine blocking flow shop with setup times and preventive maintenance costs to minimise hierarchical objective-function
- Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times
- Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study
- The blocking flow shop scheduling problem: a comprehensive and conceptual review
- Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization
- Optimizing distributed no-wait flow shop scheduling problem with setup times and maintenance operations via iterated greedy algorithm
- An iterated greedy algorithm for distributed blocking flow shop with setup times and maintenance operations to minimize makespan
- An evolutionary clustering search for the total tardiness blocking flow shop problem
- Procedure structuring for programming aircraft maintenance activities
- An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time
Informações sobre a disponibilidade de versões do artigo em acesso aberto coletadas automaticamente via oaDOI API (Unpaywall).
Por se tratar de integração com serviço externo, podem existir diferentes versões do trabalho (como preprints ou postprints), que podem diferir da versão publicada.
Download do texto completo
| Tipo | Nome | Link | |
|---|---|---|---|
| IJIEC_2021_12.pdf | Direct link |
How to cite
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
