Solutions methods for m-machine blocking flow shop with setup times and preventive maintenance costs to minimise hierarchical objective-function (2022)
- Authors:
- USP affiliated authors: NAGANO, MARCELO SEIDO - EESC ; MIYATA, HUGO HISSASHI - EESC
- Unidade: EESC
- DOI: 10.1080/00207543.2022.2127959
- Subjects: SEQUENCIAÇÃO DA PRODUÇÃO; SCHEDULING; PROGRAMAÇÃO LINEAR; ENGENHARIA DE PRODUÇÃO
- Agências de fomento:
- Language: Inglês
- Imprenta:
- Publisher: Taylor & Francis
- Publisher place: Abingdon, UK
- Date published: 2022
- Source:
- Título: International Journal of Production Research
- ISSN: 0020-7543
- Volume/Número/Paginação/Ano: on-line, p. 1-29, 2022
- Este periódico é de assinatura
- Este artigo NÃO é de acesso aberto
- Cor do Acesso Aberto: closed
-
ABNT
MIYATA, Hugo Hissashi e NAGANO, Marcelo Seido e GUPTA, Jatinder N. D. Solutions methods for m-machine blocking flow shop with setup times and preventive maintenance costs to minimise hierarchical objective-function. International Journal of Production Research, p. 1-29, 2022Tradução . . Disponível em: https://doi.org/10.1080/00207543.2022.2127959. Acesso em: 03 jan. 2026. -
APA
Miyata, H. H., Nagano, M. S., & Gupta, J. N. D. (2022). Solutions methods for m-machine blocking flow shop with setup times and preventive maintenance costs to minimise hierarchical objective-function. International Journal of Production Research, 1-29. doi:10.1080/00207543.2022.2127959 -
NLM
Miyata HH, Nagano MS, Gupta JND. Solutions methods for m-machine blocking flow shop with setup times and preventive maintenance costs to minimise hierarchical objective-function [Internet]. International Journal of Production Research. 2022 ; 1-29.[citado 2026 jan. 03 ] Available from: https://doi.org/10.1080/00207543.2022.2127959 -
Vancouver
Miyata HH, Nagano MS, Gupta JND. Solutions methods for m-machine blocking flow shop with setup times and preventive maintenance costs to minimise hierarchical objective-function [Internet]. International Journal of Production Research. 2022 ; 1-29.[citado 2026 jan. 03 ] Available from: https://doi.org/10.1080/00207543.2022.2127959 - Optimizing distributed no-wait flow shop scheduling problem with setup times and maintenance operations via iterated greedy algorithm
- Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization
- Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times
- Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance
- Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study
- The blocking flow shop scheduling problem: a comprehensive and conceptual review
- An iterated greedy algorithm for distributed blocking flow shop with setup times and maintenance operations to minimize makespan
- An evolutionary clustering search for the total tardiness blocking flow shop problem
- Procedure structuring for programming aircraft maintenance activities
- An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time
Informações sobre o DOI: 10.1080/00207543.2022.2127959 (Fonte: oaDOI API)
Download do texto completo
| Tipo | Nome | Link | |
|---|---|---|---|
| Solutions methods for m m... |
How to cite
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas