Optimizing distributed no-wait flow shop scheduling problem with setup times and maintenance operations via iterated greedy algorithm (2021)
- Authors:
- USP affiliated authors: NAGANO, MARCELO SEIDO - EESC ; MIYATA, HUGO HISSASHI - EESC
- Unidade: EESC
- DOI: 10.1016/j.jmsy.2021.10.005
- Subjects: PROGRAMAÇÃO DA PRODUÇÃO; QUALIDADE DA PRODUÇÃO; ENGENHARIA DE PRODUÇÃO
- Agências de fomento:
- Language: Inglês
- Imprenta:
- Publisher: Elsevier
- Publisher place: London, United Kingdom
- Date published: 2021
- Source:
- Título: Journal of Manufacturing Systems
- ISSN: 0278-6125
- Volume/Número/Paginação/Ano: v. 61, p. 592-612, 2021
- Status:
- Artigo possui versão em acesso aberto em repositório (Green Open Access)
- Versão do Documento:
- Versão submetida (Pré-print)
- Acessar versão aberta:
-
ABNT
MIYATA, Hugo Hissashi e NAGANO, Marcelo Seido. Optimizing distributed no-wait flow shop scheduling problem with setup times and maintenance operations via iterated greedy algorithm. Journal of Manufacturing Systems, v. 61, p. 592-612, 2021Tradução . . Disponível em: https://doi.org/10.1016/j.jmsy.2021.10.005. Acesso em: 07 abr. 2026. -
APA
Miyata, H. H., & Nagano, M. S. (2021). Optimizing distributed no-wait flow shop scheduling problem with setup times and maintenance operations via iterated greedy algorithm. Journal of Manufacturing Systems, 61, 592-612. doi:10.1016/j.jmsy.2021.10.005 -
NLM
Miyata HH, Nagano MS. Optimizing distributed no-wait flow shop scheduling problem with setup times and maintenance operations via iterated greedy algorithm [Internet]. Journal of Manufacturing Systems. 2021 ; 61 592-612.[citado 2026 abr. 07 ] Available from: https://doi.org/10.1016/j.jmsy.2021.10.005 -
Vancouver
Miyata HH, Nagano MS. Optimizing distributed no-wait flow shop scheduling problem with setup times and maintenance operations via iterated greedy algorithm [Internet]. Journal of Manufacturing Systems. 2021 ; 61 592-612.[citado 2026 abr. 07 ] Available from: https://doi.org/10.1016/j.jmsy.2021.10.005 - Solutions methods for m-machine blocking flow shop with setup times and preventive maintenance costs to minimise hierarchical objective-function
- Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times
- Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study
- The blocking flow shop scheduling problem: a comprehensive and conceptual review
- Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization
- An iterated greedy algorithm for distributed blocking flow shop with setup times and maintenance operations to minimize makespan
- Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance
- An evolutionary clustering search for the total tardiness blocking flow shop problem
- Procedure structuring for programming aircraft maintenance activities
- An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time
Informações sobre a disponibilidade de versões do artigo em acesso aberto coletadas automaticamente via oaDOI API (Unpaywall).
Por se tratar de integração com serviço externo, podem existir diferentes versões do trabalho (como preprints ou postprints), que podem diferir da versão publicada.
Download do texto completo
| Tipo | Nome | Link | |
|---|---|---|---|
| 1-s2.0-S0278612521002107-... |
How to cite
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
