Filtros : "ENGENHARIA DE PRODUCAO" Removidos: "EEFE-EFB" "Brasil" "er" Limpar

Filtros



Refine with date range


  • Source: Machine Learning with Applications. Unidade: EESC

    Subjects: PESQUISA CIENTÍFICA, REVISÃO SISTEMÁTICA

    Versão PublicadaAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MARTARELLI, Nádia Junqueira e NAGANO, Marcelo Seido. How have high-impact scientific studies designing their experiments on mixed data clustering? A systematic map to guide better choices. Machine Learning with Applications, v. 5, p. Se 2021, 2021Tradução . . Disponível em: https://doi.org/10.1016/j.mlwa.2021.100056. Acesso em: 20 jun. 2024.
    • APA

      Martarelli, N. J., & Nagano, M. S. (2021). How have high-impact scientific studies designing their experiments on mixed data clustering? A systematic map to guide better choices. Machine Learning with Applications, 5, Se 2021. doi:10.1016/j.mlwa.2021.100056
    • NLM

      Martarelli NJ, Nagano MS. How have high-impact scientific studies designing their experiments on mixed data clustering? A systematic map to guide better choices [Internet]. Machine Learning with Applications. 2021 ; 5 Se 2021.[citado 2024 jun. 20 ] Available from: https://doi.org/10.1016/j.mlwa.2021.100056
    • Vancouver

      Martarelli NJ, Nagano MS. How have high-impact scientific studies designing their experiments on mixed data clustering? A systematic map to guide better choices [Internet]. Machine Learning with Applications. 2021 ; 5 Se 2021.[citado 2024 jun. 20 ] Available from: https://doi.org/10.1016/j.mlwa.2021.100056
  • Source: Computers & Industrial Engineering. Unidade: EESC

    Subjects: SCHEDULING, ALGORITMOS GENÉTICOS, HEURÍSTICA

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ROSSI, Fernando Luis e NAGANO, Marcelo Seido. Heuristics and iterated greedy algorithms for the distributed mixed no-idle flowshop with sequence-dependent setup times. Computers & Industrial Engineering, v. 157, 2021Tradução . . Disponível em: https://doi.org/10.1016/j.cie.2021.107337. Acesso em: 20 jun. 2024.
    • APA

      Rossi, F. L., & Nagano, M. S. (2021). Heuristics and iterated greedy algorithms for the distributed mixed no-idle flowshop with sequence-dependent setup times. Computers & Industrial Engineering, 157. doi:10.1016/j.cie.2021.107337
    • NLM

      Rossi FL, Nagano MS. Heuristics and iterated greedy algorithms for the distributed mixed no-idle flowshop with sequence-dependent setup times [Internet]. Computers & Industrial Engineering. 2021 ; 157[citado 2024 jun. 20 ] Available from: https://doi.org/10.1016/j.cie.2021.107337
    • Vancouver

      Rossi FL, Nagano MS. Heuristics and iterated greedy algorithms for the distributed mixed no-idle flowshop with sequence-dependent setup times [Internet]. Computers & Industrial Engineering. 2021 ; 157[citado 2024 jun. 20 ] Available from: https://doi.org/10.1016/j.cie.2021.107337
  • Source: International Journal of Industrial Engineering Computations. Unidade: EESC

    Subjects: SISTEMAS DE PRODUÇÃO, PROGRAMAÇÃO DA PRODUÇÃO, MANUTENÇÃO PREVENTIVA, HEURÍSTICA

    Versão PublicadaAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      YAMADA, Tuane Tonani e NAGANO, Marcelo Seido e MIYATA, Hugo Hissashi. Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance. International Journal of Industrial Engineering Computations, v. 12, p. 415-426, 2021Tradução . . Disponível em: https://doi.org/10.5267/j.ijiec.2021.5.002. Acesso em: 20 jun. 2024.
    • APA

      Yamada, T. T., Nagano, M. S., & Miyata, H. H. (2021). Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance. International Journal of Industrial Engineering Computations, 12, 415-426. doi:10.5267/j.ijiec.2021.5.002
    • NLM

      Yamada TT, Nagano MS, Miyata HH. Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance [Internet]. International Journal of Industrial Engineering Computations. 2021 ; 12 415-426.[citado 2024 jun. 20 ] Available from: https://doi.org/10.5267/j.ijiec.2021.5.002
    • Vancouver

      Yamada TT, Nagano MS, Miyata HH. Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance [Internet]. International Journal of Industrial Engineering Computations. 2021 ; 12 415-426.[citado 2024 jun. 20 ] Available from: https://doi.org/10.5267/j.ijiec.2021.5.002
  • Source: Journal of Cleaner Production. Unidade: EESC

    Subjects: MODELO DE NEGÓCIO, ECONOMIA CIRCULAR, SISTEMA PRODUTO-SERVIÇO (PSS), VALOR (ECONOMIA)

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      FERNANDES, Sânia da Costa et al. Towards product-service system oriented to circular economy: a systematic review of value proposition design approaches. Journal of Cleaner Production, v. 257, n. ju 2020, 2020Tradução . . Disponível em: https://doi.org/10.1016/j.jclepro.2020.120507. Acesso em: 20 jun. 2024.
    • APA

      Fernandes, S. da C., Pigosso, D. C. A., McAloone, T. C., & Rozenfeld, H. (2020). Towards product-service system oriented to circular economy: a systematic review of value proposition design approaches. Journal of Cleaner Production, 257( ju 2020). doi:10.1016/j.jclepro.2020.120507
    • NLM

      Fernandes S da C, Pigosso DCA, McAloone TC, Rozenfeld H. Towards product-service system oriented to circular economy: a systematic review of value proposition design approaches [Internet]. Journal of Cleaner Production. 2020 ; 257( ju 2020):[citado 2024 jun. 20 ] Available from: https://doi.org/10.1016/j.jclepro.2020.120507
    • Vancouver

      Fernandes S da C, Pigosso DCA, McAloone TC, Rozenfeld H. Towards product-service system oriented to circular economy: a systematic review of value proposition design approaches [Internet]. Journal of Cleaner Production. 2020 ; 257( ju 2020):[citado 2024 jun. 20 ] Available from: https://doi.org/10.1016/j.jclepro.2020.120507
  • Source: Procedia Manufacturing. Unidade: EESC

    Subjects: LIDERANÇA, INDÚSTRIA 4.0

    Versão PublicadaAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      GUZMAN, Valeria Emma Callejas et al. Characteristics and skills of leadership in the context of industry 4.0. Procedia Manufacturing, v. 43, p. 543-550, 2020Tradução . . Disponível em: https://doi.org/10.1016/j.promfg.2020.02.167. Acesso em: 20 jun. 2024.
    • APA

      Guzman, V. E. C., Muschard, B., Gerólamo, M. C., Kohl, H., & Rozenfeld, H. (2020). Characteristics and skills of leadership in the context of industry 4.0. Procedia Manufacturing, 43, 543-550. doi:10.1016/j.promfg.2020.02.167
    • NLM

      Guzman VEC, Muschard B, Gerólamo MC, Kohl H, Rozenfeld H. Characteristics and skills of leadership in the context of industry 4.0 [Internet]. Procedia Manufacturing. 2020 ; 43 543-550.[citado 2024 jun. 20 ] Available from: https://doi.org/10.1016/j.promfg.2020.02.167
    • Vancouver

      Guzman VEC, Muschard B, Gerólamo MC, Kohl H, Rozenfeld H. Characteristics and skills of leadership in the context of industry 4.0 [Internet]. Procedia Manufacturing. 2020 ; 43 543-550.[citado 2024 jun. 20 ] Available from: https://doi.org/10.1016/j.promfg.2020.02.167
  • Source: Journal of Organisational Studies and Innovation: management, finance, economics, marketing. Unidade: EESC

    Subjects: PROPRIETÁRIO, PEQUENAS E MÉDIAS EMPRESAS

    PrivadoHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ROSIM, Daniela e ESCRIVÃO FILHO, Edmundo e NAGANO, Marcelo Seido. Managerial role: comparing small and large firms in Brazil. Journal of Organisational Studies and Innovation: management, finance, economics, marketing, v. 7, n. 1, 2020Tradução . . Disponível em: https://repositorio.usp.br/directbitstream/155bb907-2380-4f9b-9d28-76fcf250eb40/PROD_24477_SYSNO_3042178.pdf. Acesso em: 20 jun. 2024.
    • APA

      Rosim, D., Escrivão Filho, E., & Nagano, M. S. (2020). Managerial role: comparing small and large firms in Brazil. Journal of Organisational Studies and Innovation: management, finance, economics, marketing, 7( 1). Recuperado de https://repositorio.usp.br/directbitstream/155bb907-2380-4f9b-9d28-76fcf250eb40/PROD_24477_SYSNO_3042178.pdf
    • NLM

      Rosim D, Escrivão Filho E, Nagano MS. Managerial role: comparing small and large firms in Brazil [Internet]. Journal of Organisational Studies and Innovation: management, finance, economics, marketing. 2020 ; 7( 1):[citado 2024 jun. 20 ] Available from: https://repositorio.usp.br/directbitstream/155bb907-2380-4f9b-9d28-76fcf250eb40/PROD_24477_SYSNO_3042178.pdf
    • Vancouver

      Rosim D, Escrivão Filho E, Nagano MS. Managerial role: comparing small and large firms in Brazil [Internet]. Journal of Organisational Studies and Innovation: management, finance, economics, marketing. 2020 ; 7( 1):[citado 2024 jun. 20 ] Available from: https://repositorio.usp.br/directbitstream/155bb907-2380-4f9b-9d28-76fcf250eb40/PROD_24477_SYSNO_3042178.pdf
  • Source: Swarm and Evolutionary Computation. Unidade: EESC

    Subjects: ALGORITMOS GENÉTICOS, SIMULAÇÃO, TECNOLOGIA DA INFORMAÇÃO, MINERAÇÃO DE DADOS

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MARTARELLI, Nádia Junqueira e NAGANO, Marcelo Seido. Unsupervised feature selection based on bio-inspired approaches. Swarm and Evolutionary Computation, v. 52, 2020Tradução . . Disponível em: https://doi.org/10.1016/j.swevo.2019.100618. Acesso em: 20 jun. 2024.
    • APA

      Martarelli, N. J., & Nagano, M. S. (2020). Unsupervised feature selection based on bio-inspired approaches. Swarm and Evolutionary Computation, 52. doi:10.1016/j.swevo.2019.100618
    • NLM

      Martarelli NJ, Nagano MS. Unsupervised feature selection based on bio-inspired approaches [Internet]. Swarm and Evolutionary Computation. 2020 ; 52[citado 2024 jun. 20 ] Available from: https://doi.org/10.1016/j.swevo.2019.100618
    • Vancouver

      Martarelli NJ, Nagano MS. Unsupervised feature selection based on bio-inspired approaches [Internet]. Swarm and Evolutionary Computation. 2020 ; 52[citado 2024 jun. 20 ] Available from: https://doi.org/10.1016/j.swevo.2019.100618
  • Source: Computers & Industrial Engineering. Unidade: EESC

    Subjects: HEURÍSTICA, SCHEDULING, SEQUENCIAÇÃO DA PRODUÇÃO, MANUTENÇÃO PREVENTIVA

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MIYATA, Hugo Hissashi e NAGANO, Marcelo Seido e GUPTA, Jatinder N. D. Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization. Computers & Industrial Engineering, v. 135, p. Se 2019, 2019Tradução . . Disponível em: https://doi.org/10.1016/j.cie.2019.05.034. Acesso em: 20 jun. 2024.
    • APA

      Miyata, H. H., Nagano, M. S., & Gupta, J. N. D. (2019). Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization. Computers & Industrial Engineering, 135, Se 2019. doi:10.1016/j.cie.2019.05.034
    • NLM

      Miyata HH, Nagano MS, Gupta JND. Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization [Internet]. Computers & Industrial Engineering. 2019 ; 135 Se 2019.[citado 2024 jun. 20 ] Available from: https://doi.org/10.1016/j.cie.2019.05.034
    • Vancouver

      Miyata HH, Nagano MS, Gupta JND. Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization [Internet]. Computers & Industrial Engineering. 2019 ; 135 Se 2019.[citado 2024 jun. 20 ] Available from: https://doi.org/10.1016/j.cie.2019.05.034
  • Source: Expert Systems with Applications: an international journal. Unidade: EESC

    Subjects: PROGRAMAÇÃO DA PRODUÇÃO, HEURÍSTICA, TEMPO

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ROSSI, Fernando Luis e NAGANO, Marcelo Seido. Heuristics for the mixed no-idle flowshop with sequence-dependent setup times and total flowtime criterion. Expert Systems with Applications: an international journal, v. 125, p. 40-54, 2019Tradução . . Disponível em: https://doi.org/10.1016/j.eswa.2019.01.057. Acesso em: 20 jun. 2024.
    • APA

      Rossi, F. L., & Nagano, M. S. (2019). Heuristics for the mixed no-idle flowshop with sequence-dependent setup times and total flowtime criterion. Expert Systems with Applications: an international journal, 125, 40-54. doi:10.1016/j.eswa.2019.01.057
    • NLM

      Rossi FL, Nagano MS. Heuristics for the mixed no-idle flowshop with sequence-dependent setup times and total flowtime criterion [Internet]. Expert Systems with Applications: an international journal. 2019 ; 125 40-54.[citado 2024 jun. 20 ] Available from: https://doi.org/10.1016/j.eswa.2019.01.057
    • Vancouver

      Rossi FL, Nagano MS. Heuristics for the mixed no-idle flowshop with sequence-dependent setup times and total flowtime criterion [Internet]. Expert Systems with Applications: an international journal. 2019 ; 125 40-54.[citado 2024 jun. 20 ] Available from: https://doi.org/10.1016/j.eswa.2019.01.057
  • Source: Expert Systems with Applications: an international journal. Unidade: EESC

    Subjects: SCHEDULING, FLUXOGRAMA, LOJAS

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MIYATA, Hugo Hissashi e NAGANO, Marcelo Seido. The blocking flow shop scheduling problem: a comprehensive and conceptual review. Expert Systems with Applications: an international journal, v. 135, p. 130-156, 2019Tradução . . Disponível em: https://doi.org/10.1016/j.eswa.2019.06.069. Acesso em: 20 jun. 2024.
    • APA

      Miyata, H. H., & Nagano, M. S. (2019). The blocking flow shop scheduling problem: a comprehensive and conceptual review. Expert Systems with Applications: an international journal, 135, 130-156. doi:10.1016/j.eswa.2019.06.069
    • NLM

      Miyata HH, Nagano MS. The blocking flow shop scheduling problem: a comprehensive and conceptual review [Internet]. Expert Systems with Applications: an international journal. 2019 ; 135 130-156.[citado 2024 jun. 20 ] Available from: https://doi.org/10.1016/j.eswa.2019.06.069
    • Vancouver

      Miyata HH, Nagano MS. The blocking flow shop scheduling problem: a comprehensive and conceptual review [Internet]. Expert Systems with Applications: an international journal. 2019 ; 135 130-156.[citado 2024 jun. 20 ] Available from: https://doi.org/10.1016/j.eswa.2019.06.069
  • Source: Globalization and Development : Economic and Socio-Cultural Perspectives from Emerging Markets. Unidade: EESC

    Subjects: PAÍSES EM DESENVOLVIMENTO, GLOBALIZAÇÃO, DESENVOLVIMENTO ECONÔMICO

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      PHILIPPSEN JR, Luiz e NAGANO, Marcelo Seido e ESCRIVÃO FILHO, Edmundo. A Small- and Medium-sized Enterprise (SME) owner-manager’s job theoretic review under globalization. Globalization and Development : Economic and Socio-Cultural Perspectives from Emerging Markets. Tradução . Switzerland: Springer Nature, 2019. . Disponível em: https://doi.org/10.1007/978-3-030-14370-1_19. Acesso em: 20 jun. 2024.
    • APA

      Philippsen Jr, L., Nagano, M. S., & Escrivão Filho, E. (2019). A Small- and Medium-sized Enterprise (SME) owner-manager’s job theoretic review under globalization. In Globalization and Development : Economic and Socio-Cultural Perspectives from Emerging Markets. Switzerland: Springer Nature. doi:10.1007/978-3-030-14370-1_19
    • NLM

      Philippsen Jr L, Nagano MS, Escrivão Filho E. A Small- and Medium-sized Enterprise (SME) owner-manager’s job theoretic review under globalization [Internet]. In: Globalization and Development : Economic and Socio-Cultural Perspectives from Emerging Markets. Switzerland: Springer Nature; 2019. [citado 2024 jun. 20 ] Available from: https://doi.org/10.1007/978-3-030-14370-1_19
    • Vancouver

      Philippsen Jr L, Nagano MS, Escrivão Filho E. A Small- and Medium-sized Enterprise (SME) owner-manager’s job theoretic review under globalization [Internet]. In: Globalization and Development : Economic and Socio-Cultural Perspectives from Emerging Markets. Switzerland: Springer Nature; 2019. [citado 2024 jun. 20 ] Available from: https://doi.org/10.1007/978-3-030-14370-1_19
  • Source: Business Process Management Journal. Unidades: EESC, FEARP, FMRP

    Subjects: PLANEJAMENTO ESTRATÉGICO, GESTÃO DE NEGÓCIOS, ENSAIO CLÍNICO

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      RENTES, Victor Cattani et al. Implementation of a strategic planning process oriented towards promoting business process management (BPM) at a clinical research centre (CRC). Business Process Management Journal, v. 25, n. 4, p. 707-737, 2019Tradução . . Disponível em: https://doi.org/10.1108/BPMJ-08-2016-0169. Acesso em: 20 jun. 2024.
    • APA

      Rentes, V. C., Pádua, S. I. D. de, Coelho, E. B., Cintra, M. A. de C. T., Ilana, G. G. F., & Rozenfeld, H. (2019). Implementation of a strategic planning process oriented towards promoting business process management (BPM) at a clinical research centre (CRC). Business Process Management Journal, 25( 4), 707-737. doi:10.1108/BPMJ-08-2016-0169
    • NLM

      Rentes VC, Pádua SID de, Coelho EB, Cintra MA de CT, Ilana GGF, Rozenfeld H. Implementation of a strategic planning process oriented towards promoting business process management (BPM) at a clinical research centre (CRC) [Internet]. Business Process Management Journal. 2019 ; 25( 4): 707-737.[citado 2024 jun. 20 ] Available from: https://doi.org/10.1108/BPMJ-08-2016-0169
    • Vancouver

      Rentes VC, Pádua SID de, Coelho EB, Cintra MA de CT, Ilana GGF, Rozenfeld H. Implementation of a strategic planning process oriented towards promoting business process management (BPM) at a clinical research centre (CRC) [Internet]. Business Process Management Journal. 2019 ; 25( 4): 707-737.[citado 2024 jun. 20 ] Available from: https://doi.org/10.1108/BPMJ-08-2016-0169
  • Source: Proceedings. Conference titles: Conferências IADIS Ibero-Americanas WWW/Internet e Computação Aplicada. Unidade: EESC

    Subjects: VENDAS, CADEIA DE SUPRIMENTOS, ENGENHARIA DE PRODUÇÃO

    PrivadoHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MARTARELLI, Nádia Junqueira e ESPOSTO, Kleber Francisco. Agrupamento de dados mistos baseados no algoritmo K-means: uma revisão sistemática da literatura. 2019, Anais.. Lisboa: IADIS, 2019. Disponível em: https://repositorio.usp.br/directbitstream/83c1fb67-39aa-496e-a8f9-cc7b4a49c270/PROD_23926_SYSNO_3039332.pdf. Acesso em: 20 jun. 2024.
    • APA

      Martarelli, N. J., & Esposto, K. F. (2019). Agrupamento de dados mistos baseados no algoritmo K-means: uma revisão sistemática da literatura. In Proceedings. Lisboa: IADIS. Recuperado de https://repositorio.usp.br/directbitstream/83c1fb67-39aa-496e-a8f9-cc7b4a49c270/PROD_23926_SYSNO_3039332.pdf
    • NLM

      Martarelli NJ, Esposto KF. Agrupamento de dados mistos baseados no algoritmo K-means: uma revisão sistemática da literatura [Internet]. Proceedings. 2019 ;[citado 2024 jun. 20 ] Available from: https://repositorio.usp.br/directbitstream/83c1fb67-39aa-496e-a8f9-cc7b4a49c270/PROD_23926_SYSNO_3039332.pdf
    • Vancouver

      Martarelli NJ, Esposto KF. Agrupamento de dados mistos baseados no algoritmo K-means: uma revisão sistemática da literatura [Internet]. Proceedings. 2019 ;[citado 2024 jun. 20 ] Available from: https://repositorio.usp.br/directbitstream/83c1fb67-39aa-496e-a8f9-cc7b4a49c270/PROD_23926_SYSNO_3039332.pdf
  • Source: Production Engineering: research and development. Unidade: EESC

    Subjects: ALGORITMOS GENÉTICOS, SEQUENCIAÇÃO DA PRODUÇÃO

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      PINTO, Anderson Rogério Faia e NAGANO, Marcelo Seido. An approach for the solution to order batching and sequencing in picking systems. Production Engineering: research and development, v. 13, p. 325-341, 2019Tradução . . Disponível em: https://doi.org/10.1007/s11740-019-00904-4. Acesso em: 20 jun. 2024.
    • APA

      Pinto, A. R. F., & Nagano, M. S. (2019). An approach for the solution to order batching and sequencing in picking systems. Production Engineering: research and development, 13, 325-341. doi:10.1007/s11740-019-00904-4
    • NLM

      Pinto ARF, Nagano MS. An approach for the solution to order batching and sequencing in picking systems [Internet]. Production Engineering: research and development. 2019 ; 13 325-341.[citado 2024 jun. 20 ] Available from: https://doi.org/10.1007/s11740-019-00904-4
    • Vancouver

      Pinto ARF, Nagano MS. An approach for the solution to order batching and sequencing in picking systems [Internet]. Production Engineering: research and development. 2019 ; 13 325-341.[citado 2024 jun. 20 ] Available from: https://doi.org/10.1007/s11740-019-00904-4
  • Source: Journal of Cleaner Production. Unidade: EESC

    Subjects: SUSTENTABILIDADE, GESTÃO AMBIENTAL

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      POLTRONIERI, Camila Fabricio e GANGA, Gilberto Miller Devós e GERÓLAMO, Mateus Cecílio. Maturity in management system integration and its relationship with sustainable performance. Journal of Cleaner Production, v. 207, p. 236-247, 2019Tradução . . Disponível em: https://doi.org/10.1016/j.jclepro.2018.09.250. Acesso em: 20 jun. 2024.
    • APA

      Poltronieri, C. F., Ganga, G. M. D., & Gerólamo, M. C. (2019). Maturity in management system integration and its relationship with sustainable performance. Journal of Cleaner Production, 207, 236-247. doi:10.1016/j.jclepro.2018.09.250
    • NLM

      Poltronieri CF, Ganga GMD, Gerólamo MC. Maturity in management system integration and its relationship with sustainable performance [Internet]. Journal of Cleaner Production. 2019 ; 207 236-247.[citado 2024 jun. 20 ] Available from: https://doi.org/10.1016/j.jclepro.2018.09.250
    • Vancouver

      Poltronieri CF, Ganga GMD, Gerólamo MC. Maturity in management system integration and its relationship with sustainable performance [Internet]. Journal of Cleaner Production. 2019 ; 207 236-247.[citado 2024 jun. 20 ] Available from: https://doi.org/10.1016/j.jclepro.2018.09.250
  • Source: Journal of Intelligent Manufacturing. Unidade: EESC

    Subjects: COMPRA E VENDA, GESTÃO DE NEGÓCIOS

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      NAGANO, Marcelo Seido e KOMESU, Adriano Seiko e MIYATA, Hugo Hissashi. An evolutionary clustering search for the total tardiness blocking flow shop problem. Journal of Intelligent Manufacturing, v. 30, p. 1843–1857, 2019Tradução . . Disponível em: https://doi.org/10.1007/s10845-017-1358-7. Acesso em: 20 jun. 2024.
    • APA

      Nagano, M. S., Komesu, A. S., & Miyata, H. H. (2019). An evolutionary clustering search for the total tardiness blocking flow shop problem. Journal of Intelligent Manufacturing, 30, 1843–1857. doi:10.1007/s10845-017-1358-7
    • NLM

      Nagano MS, Komesu AS, Miyata HH. An evolutionary clustering search for the total tardiness blocking flow shop problem [Internet]. Journal of Intelligent Manufacturing. 2019 ; 30 1843–1857.[citado 2024 jun. 20 ] Available from: https://doi.org/10.1007/s10845-017-1358-7
    • Vancouver

      Nagano MS, Komesu AS, Miyata HH. An evolutionary clustering search for the total tardiness blocking flow shop problem [Internet]. Journal of Intelligent Manufacturing. 2019 ; 30 1843–1857.[citado 2024 jun. 20 ] Available from: https://doi.org/10.1007/s10845-017-1358-7
  • Source: International Journal of Industrial Engineering Computations. Unidade: EESC

    Subjects: PROGRAMAÇÃO DA PRODUÇÃO, HEURÍSTICA, TEMPO

    Versão PublicadaAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      TAKANO, Mauricio Iwama e NAGANO, Marcelo Seido. Evaluating the performance of constructive heuristics for the blocking flow shop scheduling problem with setup times. International Journal of Industrial Engineering Computations, v. 10, p. 37-50, 2019Tradução . . Disponível em: https://doi.org/10.5267/j.ijiec.2018.5.002. Acesso em: 20 jun. 2024.
    • APA

      Takano, M. I., & Nagano, M. S. (2019). Evaluating the performance of constructive heuristics for the blocking flow shop scheduling problem with setup times. International Journal of Industrial Engineering Computations, 10, 37-50. doi:10.5267/j.ijiec.2018.5.002
    • NLM

      Takano MI, Nagano MS. Evaluating the performance of constructive heuristics for the blocking flow shop scheduling problem with setup times [Internet]. International Journal of Industrial Engineering Computations. 2019 ; 10 37-50.[citado 2024 jun. 20 ] Available from: https://doi.org/10.5267/j.ijiec.2018.5.002
    • Vancouver

      Takano MI, Nagano MS. Evaluating the performance of constructive heuristics for the blocking flow shop scheduling problem with setup times [Internet]. International Journal of Industrial Engineering Computations. 2019 ; 10 37-50.[citado 2024 jun. 20 ] Available from: https://doi.org/10.5267/j.ijiec.2018.5.002
  • Source: Journal of Information & Knowledge Management. Unidade: EESC

    Subjects: TRABALHO EM GRUPO, CONHECIMENTO, INOVAÇÃO, COMPETÊNCIA ORGANIZACIONAL, COMUNICAÇÃO

    Acesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      VICK, Thais Elaine e NAGANO, Marcelo Seido. Preconditions for successful knowledge creation in the context of academic innovation projects. Journal of Information & Knowledge Management, v. 17, n. 1, 2018Tradução . . Disponível em: https://doi.org/10.1142/S0219649218500041. Acesso em: 20 jun. 2024.
    • APA

      Vick, T. E., & Nagano, M. S. (2018). Preconditions for successful knowledge creation in the context of academic innovation projects. Journal of Information & Knowledge Management, 17( 1). doi:10.1142/S0219649218500041
    • NLM

      Vick TE, Nagano MS. Preconditions for successful knowledge creation in the context of academic innovation projects [Internet]. Journal of Information & Knowledge Management. 2018 ; 17( 1):[citado 2024 jun. 20 ] Available from: https://doi.org/10.1142/S0219649218500041
    • Vancouver

      Vick TE, Nagano MS. Preconditions for successful knowledge creation in the context of academic innovation projects [Internet]. Journal of Information & Knowledge Management. 2018 ; 17( 1):[citado 2024 jun. 20 ] Available from: https://doi.org/10.1142/S0219649218500041
  • Source: Journal of Business & Industrial Marketing. Unidade: EESC

    Subjects: SERVITIZAÇÃO, MODELO DE NEGÓCIO, SISTEMA PRODUTO-SERVIÇO (PSS)

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      OLIVEIRA, Maicon Gouvêa de et al. Lessons learned from a successful industrial product service system business model: emphasis on financial aspects. Journal of Business & Industrial Marketing, v. 33, n. 3, p. 365-376, 2018Tradução . . Disponível em: https://doi.org/10.1108/JBIM-07-2016-0147. Acesso em: 20 jun. 2024.
    • APA

      Oliveira, M. G. de, Mendes, G. H. de S., Albuquerque, A. A. de, & Rozenfeld, H. (2018). Lessons learned from a successful industrial product service system business model: emphasis on financial aspects. Journal of Business & Industrial Marketing, 33( 3), 365-376. doi:10.1108/JBIM-07-2016-0147
    • NLM

      Oliveira MG de, Mendes GH de S, Albuquerque AA de, Rozenfeld H. Lessons learned from a successful industrial product service system business model: emphasis on financial aspects [Internet]. Journal of Business & Industrial Marketing. 2018 ; 33( 3): 365-376.[citado 2024 jun. 20 ] Available from: https://doi.org/10.1108/JBIM-07-2016-0147
    • Vancouver

      Oliveira MG de, Mendes GH de S, Albuquerque AA de, Rozenfeld H. Lessons learned from a successful industrial product service system business model: emphasis on financial aspects [Internet]. Journal of Business & Industrial Marketing. 2018 ; 33( 3): 365-376.[citado 2024 jun. 20 ] Available from: https://doi.org/10.1108/JBIM-07-2016-0147
  • Source: Engineering Optimization. Unidade: EESC

    Subjects: MANUTENÇÃO PREVENTIVA, HEURÍSTICA, SCHEDULING

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MIYATA, Hugo Hissashi e NAGANO, Marcelo Seido e GUPTAB, Jatinder N. D. Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study. Engineering Optimization, v. 51, n. 4, 2018Tradução . . Disponível em: https://doi.org/10.1080/0305215X.2018.1485903. Acesso em: 20 jun. 2024.
    • APA

      Miyata, H. H., Nagano, M. S., & Guptab, J. N. D. (2018). Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study. Engineering Optimization, 51( 4). doi:10.1080/0305215X.2018.1485903
    • NLM

      Miyata HH, Nagano MS, Guptab JND. Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study [Internet]. Engineering Optimization. 2018 ; 51( 4):[citado 2024 jun. 20 ] Available from: https://doi.org/10.1080/0305215X.2018.1485903
    • Vancouver

      Miyata HH, Nagano MS, Guptab JND. Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study [Internet]. Engineering Optimization. 2018 ; 51( 4):[citado 2024 jun. 20 ] Available from: https://doi.org/10.1080/0305215X.2018.1485903

Digital Library of Intellectual Production of Universidade de São Paulo     2012 - 2024