Filtros : "PROGRAMAÇÃO DA PRODUÇÃO" Limpar

Filtros



Refine with date range


  • Source: Computers & Industrial Engineering. Unidade: ICMC

    Subjects: OTIMIZAÇÃO COMBINATÓRIA, ANÁLISE DE DESEMPENHO, PROGRAMAÇÃO DA PRODUÇÃO

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      CUNHA, Artur Lovato et al. A new formulation for a multi-stage, multilevel batch scheduling problem. Computers & Industrial Engineering, v. 212, p. 1-13, 2026Tradução . . Disponível em: https://doi.org/10.1016/j.cie.2025.111708. Acesso em: 04 maio 2026.
    • APA

      Cunha, A. L., Santos, M. O. dos, Pinto-Varela, T., & Barbosa-Póvoa, A. (2026). A new formulation for a multi-stage, multilevel batch scheduling problem. Computers & Industrial Engineering, 212, 1-13. doi:10.1016/j.cie.2025.111708
    • NLM

      Cunha AL, Santos MO dos, Pinto-Varela T, Barbosa-Póvoa A. A new formulation for a multi-stage, multilevel batch scheduling problem [Internet]. Computers & Industrial Engineering. 2026 ; 212 1-13.[citado 2026 maio 04 ] Available from: https://doi.org/10.1016/j.cie.2025.111708
    • Vancouver

      Cunha AL, Santos MO dos, Pinto-Varela T, Barbosa-Póvoa A. A new formulation for a multi-stage, multilevel batch scheduling problem [Internet]. Computers & Industrial Engineering. 2026 ; 212 1-13.[citado 2026 maio 04 ] Available from: https://doi.org/10.1016/j.cie.2025.111708
    ODS 09. Indústria, inovação e infraestrutura
  • Unidade: EP

    Assunto: PROGRAMAÇÃO DA PRODUÇÃO

    Acesso à fonteHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      SILVA, Bruna Carvalho da. Simheuristics for the limited buffer permutation flow shop problem with random processing times. 2025. Tese (Doutorado) – Universidade de São Paulo, São Paulo, 2025. Disponível em: https://teses.usp.br/teses/disponiveis/3/3136/tde-21072025-074929/. Acesso em: 04 maio 2026.
    • APA

      Silva, B. C. da. (2025). Simheuristics for the limited buffer permutation flow shop problem with random processing times (Tese (Doutorado). Universidade de São Paulo, São Paulo. Recuperado de https://teses.usp.br/teses/disponiveis/3/3136/tde-21072025-074929/
    • NLM

      Silva BC da. Simheuristics for the limited buffer permutation flow shop problem with random processing times [Internet]. 2025 ;[citado 2026 maio 04 ] Available from: https://teses.usp.br/teses/disponiveis/3/3136/tde-21072025-074929/
    • Vancouver

      Silva BC da. Simheuristics for the limited buffer permutation flow shop problem with random processing times [Internet]. 2025 ;[citado 2026 maio 04 ] Available from: https://teses.usp.br/teses/disponiveis/3/3136/tde-21072025-074929/
  • Unidade: EESC

    Subjects: ESTOQUES, PROGRAMAÇÃO DA PRODUÇÃO, MODELOS MATEMÁTICOS

    Acesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      SOUZA, Raínne Florisbelo Gonçalves de. Optimization approaches for integrating cutting stock and flow shop scheduling with setup times in automotive chassis manufacturing. 2025. Tese (Doutorado) – Universidade de São Paulo, São Carlos, 2025. Disponível em: https://doi.org/10.11606/T.18.2025.tde-04042025-074450. Acesso em: 04 maio 2026.
    • APA

      Souza, R. F. G. de. (2025). Optimization approaches for integrating cutting stock and flow shop scheduling with setup times in automotive chassis manufacturing (Tese (Doutorado). Universidade de São Paulo, São Carlos. Recuperado de https://doi.org/10.11606/T.18.2025.tde-04042025-074450
    • NLM

      Souza RFG de. Optimization approaches for integrating cutting stock and flow shop scheduling with setup times in automotive chassis manufacturing [Internet]. 2025 ;[citado 2026 maio 04 ] Available from: https://doi.org/10.11606/T.18.2025.tde-04042025-074450
    • Vancouver

      Souza RFG de. Optimization approaches for integrating cutting stock and flow shop scheduling with setup times in automotive chassis manufacturing [Internet]. 2025 ;[citado 2026 maio 04 ] Available from: https://doi.org/10.11606/T.18.2025.tde-04042025-074450
  • Source: Computers and Operations Research. Unidade: EESC

    Subjects: PESQUISA OPERACIONAL, ALGORITMOS GENÉTICOS, PROGRAMAÇÃO DA PRODUÇÃO, ENGENHARIA DE PRODUÇÃO

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ROLIM, Gustavo Alencar e NAGANO, Marcelo Seido. Designing state-of-the-art metaheuristics: what have we learned from the parallel-machine scheduling problem with setups?. Computers and Operations Research, v. 182, p. 1-15, 2025Tradução . . Disponível em: https://dx.doi.org/10.1016/j.cor.2025.107110. Acesso em: 04 maio 2026.
    • APA

      Rolim, G. A., & Nagano, M. S. (2025). Designing state-of-the-art metaheuristics: what have we learned from the parallel-machine scheduling problem with setups? Computers and Operations Research, 182, 1-15. doi:10.1016/j.cor.2025.107110
    • NLM

      Rolim GA, Nagano MS. Designing state-of-the-art metaheuristics: what have we learned from the parallel-machine scheduling problem with setups? [Internet]. Computers and Operations Research. 2025 ; 182 1-15.[citado 2026 maio 04 ] Available from: https://dx.doi.org/10.1016/j.cor.2025.107110
    • Vancouver

      Rolim GA, Nagano MS. Designing state-of-the-art metaheuristics: what have we learned from the parallel-machine scheduling problem with setups? [Internet]. Computers and Operations Research. 2025 ; 182 1-15.[citado 2026 maio 04 ] Available from: https://dx.doi.org/10.1016/j.cor.2025.107110
  • Source: ENEGEP 2025 - Produção inteligente para um futuro renovável. Conference titles: Encontro Nacional de Engenharia de Produção - ENEGEP. Unidade: EP

    Subjects: PORTOS, PROGRAMAÇÃO DA PRODUÇÃO, PROGRAMAÇÃO MATEMÁTICA, SCHEDULING

    Versão PublicadaAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MORAES NETO, Luciano Pinto de e MOTA, Daniel de Oliveira e BOTTER, Rui Carlos. Sequenciamento integrado de navios em portos com canal rstrito: análise comparativa das políticas de despacho. 2025, Anais.. Rio de Janeiro: ABEPRO, 2025. Disponível em: https://doi.org/10.14488/enegep2025_tn_st_424_2073_50247. Acesso em: 04 maio 2026.
    • APA

      Moraes Neto, L. P. de, Mota, D. de O., & Botter, R. C. (2025). Sequenciamento integrado de navios em portos com canal rstrito: análise comparativa das políticas de despacho. In ENEGEP 2025 - Produção inteligente para um futuro renovável. Rio de Janeiro: ABEPRO. doi:10.14488/enegep2025_tn_st_424_2073_50247
    • NLM

      Moraes Neto LP de, Mota D de O, Botter RC. Sequenciamento integrado de navios em portos com canal rstrito: análise comparativa das políticas de despacho [Internet]. ENEGEP 2025 - Produção inteligente para um futuro renovável. 2025 ;[citado 2026 maio 04 ] Available from: https://doi.org/10.14488/enegep2025_tn_st_424_2073_50247
    • Vancouver

      Moraes Neto LP de, Mota D de O, Botter RC. Sequenciamento integrado de navios em portos com canal rstrito: análise comparativa das políticas de despacho [Internet]. ENEGEP 2025 - Produção inteligente para um futuro renovável. 2025 ;[citado 2026 maio 04 ] Available from: https://doi.org/10.14488/enegep2025_tn_st_424_2073_50247
  • Unidade: EP

    Subjects: PESQUISA OPERACIONAL, PLANEJAMENTO DA PRODUÇÃO, PROGRAMAÇÃO DA PRODUÇÃO

    Acesso à fonteHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      SILVA, Fernanda Karoline. Análise da restrição do tempo de espera limitado em uma modelagem flow shop. 2024. Dissertação (Mestrado) – Universidade de São Paulo, São Paulo, 2024. Disponível em: https://teses.usp.br/teses/disponiveis/3/3148/tde-29012025-081947/. Acesso em: 04 maio 2026.
    • APA

      Silva, F. K. (2024). Análise da restrição do tempo de espera limitado em uma modelagem flow shop (Dissertação (Mestrado). Universidade de São Paulo, São Paulo. Recuperado de https://teses.usp.br/teses/disponiveis/3/3148/tde-29012025-081947/
    • NLM

      Silva FK. Análise da restrição do tempo de espera limitado em uma modelagem flow shop [Internet]. 2024 ;[citado 2026 maio 04 ] Available from: https://teses.usp.br/teses/disponiveis/3/3148/tde-29012025-081947/
    • Vancouver

      Silva FK. Análise da restrição do tempo de espera limitado em uma modelagem flow shop [Internet]. 2024 ;[citado 2026 maio 04 ] Available from: https://teses.usp.br/teses/disponiveis/3/3148/tde-29012025-081947/
  • Unidade: ICMC

    Subjects: ALGORITMOS GENÉTICOS, PROGRAMAÇÃO MATEMÁTICA, HEURÍSTICA, VESTUÁRIO, PROGRAMAÇÃO DA PRODUÇÃO, ANÁLISE DE COORTE, PESQUISA OPERACIONAL

    Acesso à fonteAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      HONO, Diego Yoshihiro. O Problema do Empacotamento de Itens Irregulares em Bins. 2024. Dissertação (Mestrado) – Universidade de São Paulo, São Carlos, 2024. Disponível em: https://teses.usp.br/teses/disponiveis/55/55134/tde-05062024-155001/. Acesso em: 04 maio 2026.
    • APA

      Hono, D. Y. (2024). O Problema do Empacotamento de Itens Irregulares em Bins (Dissertação (Mestrado). Universidade de São Paulo, São Carlos. Recuperado de https://teses.usp.br/teses/disponiveis/55/55134/tde-05062024-155001/
    • NLM

      Hono DY. O Problema do Empacotamento de Itens Irregulares em Bins [Internet]. 2024 ;[citado 2026 maio 04 ] Available from: https://teses.usp.br/teses/disponiveis/55/55134/tde-05062024-155001/
    • Vancouver

      Hono DY. O Problema do Empacotamento de Itens Irregulares em Bins [Internet]. 2024 ;[citado 2026 maio 04 ] Available from: https://teses.usp.br/teses/disponiveis/55/55134/tde-05062024-155001/
  • Unidade: EESC

    Subjects: PROGRAMAÇÃO DA PRODUÇÃO, PROGRAMAÇÃO HEURÍSTICA

    Acesso à fonteAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ROLIM, Gustavo Alencar. Parallel-machine scheduling: variants, formulations, and a critical analysis of metaheuristic approaches. 2024. Tese (Doutorado) – Universidade de São Paulo, São Carlos, 2024. Disponível em: https://teses.usp.br/teses/disponiveis/18/18156/tde-25062025-095024/. Acesso em: 04 maio 2026.
    • APA

      Rolim, G. A. (2024). Parallel-machine scheduling: variants, formulations, and a critical analysis of metaheuristic approaches (Tese (Doutorado). Universidade de São Paulo, São Carlos. Recuperado de https://teses.usp.br/teses/disponiveis/18/18156/tde-25062025-095024/
    • NLM

      Rolim GA. Parallel-machine scheduling: variants, formulations, and a critical analysis of metaheuristic approaches [Internet]. 2024 ;[citado 2026 maio 04 ] Available from: https://teses.usp.br/teses/disponiveis/18/18156/tde-25062025-095024/
    • Vancouver

      Rolim GA. Parallel-machine scheduling: variants, formulations, and a critical analysis of metaheuristic approaches [Internet]. 2024 ;[citado 2026 maio 04 ] Available from: https://teses.usp.br/teses/disponiveis/18/18156/tde-25062025-095024/
  • Source: Journal of Project Management. Unidade: EESC

    Subjects: HEURÍSTICA, PROGRAMAÇÃO DA PRODUÇÃO, ENGENHARIA DE PRODUÇÃO, SEQUENCIAÇÃO DA PRODUÇÃO

    Versão PublicadaAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      LAURENTYS, Clarissa Tararam de e NAGANO, Marcelo Seido. Evaluating procedures in the NEH heuristic for the PFSP - SIST. Journal of Project Management, v. 9, n. 1, p. 17-26, 2024Tradução . . Disponível em: https://dx.doi.org/10.5267/j.jpm.2023.11.001. Acesso em: 04 maio 2026.
    • APA

      Laurentys, C. T. de, & Nagano, M. S. (2024). Evaluating procedures in the NEH heuristic for the PFSP - SIST. Journal of Project Management, 9( 1), 17-26. doi:10.5267/j.jpm.2023.11.001
    • NLM

      Laurentys CT de, Nagano MS. Evaluating procedures in the NEH heuristic for the PFSP - SIST [Internet]. Journal of Project Management. 2024 ; 9( 1): 17-26.[citado 2026 maio 04 ] Available from: https://dx.doi.org/10.5267/j.jpm.2023.11.001
    • Vancouver

      Laurentys CT de, Nagano MS. Evaluating procedures in the NEH heuristic for the PFSP - SIST [Internet]. Journal of Project Management. 2024 ; 9( 1): 17-26.[citado 2026 maio 04 ] Available from: https://dx.doi.org/10.5267/j.jpm.2023.11.001
  • Source: Results in Control and Optimization. Unidade: EESC

    Subjects: PROGRAMAÇÃO DA PRODUÇÃO, INTELIGÊNCIA ARTIFICIAL, BIBLIOMETRIA

    Versão PublicadaAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      PRATA, Bruno de Athayde e ABREU, Levi Ribeiro de e NAGANO, Marcelo Seido. Applications of constraint programming in production scheduling problems: a descriptive bibliometric analysis. Results in Control and Optimization, v. 14, p. 1-17, 2024Tradução . . Disponível em: http://dx.doi.org/10.1016/j.rico.2023.100350. Acesso em: 04 maio 2026.
    • APA

      Prata, B. de A., Abreu, L. R. de, & Nagano, M. S. (2024). Applications of constraint programming in production scheduling problems: a descriptive bibliometric analysis. Results in Control and Optimization, 14, 1-17. doi:10.1016/j.rico.2023.100350
    • NLM

      Prata B de A, Abreu LR de, Nagano MS. Applications of constraint programming in production scheduling problems: a descriptive bibliometric analysis [Internet]. Results in Control and Optimization. 2024 ; 14 1-17.[citado 2026 maio 04 ] Available from: http://dx.doi.org/10.1016/j.rico.2023.100350
    • Vancouver

      Prata B de A, Abreu LR de, Nagano MS. Applications of constraint programming in production scheduling problems: a descriptive bibliometric analysis [Internet]. Results in Control and Optimization. 2024 ; 14 1-17.[citado 2026 maio 04 ] Available from: http://dx.doi.org/10.1016/j.rico.2023.100350
  • Source: Journal of Project Management. Unidade: EESC

    Subjects: PROGRAMAÇÃO DA PRODUÇÃO, HEURÍSTICA, ENGENHARIA DE PRODUÇÃO

    Versão PublicadaAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      NAGANO, Marcelo Seido e ROSSI, Fernando Luis. A two-stage iterated greedy algorithm and a multi-objective constructive heuristic for the mixed no-idle flowshop scheduling problem to minimize makespan subject to total completion time. Journal of Project Management, v. 9, n. 1, p. 45-60, 2024Tradução . . Disponível em: https://dx.doi.org/10.5267/j.jpm.2023.9.001. Acesso em: 04 maio 2026.
    • APA

      Nagano, M. S., & Rossi, F. L. (2024). A two-stage iterated greedy algorithm and a multi-objective constructive heuristic for the mixed no-idle flowshop scheduling problem to minimize makespan subject to total completion time. Journal of Project Management, 9( 1), 45-60. doi:10.5267/j.jpm.2023.9.001
    • NLM

      Nagano MS, Rossi FL. A two-stage iterated greedy algorithm and a multi-objective constructive heuristic for the mixed no-idle flowshop scheduling problem to minimize makespan subject to total completion time [Internet]. Journal of Project Management. 2024 ; 9( 1): 45-60.[citado 2026 maio 04 ] Available from: https://dx.doi.org/10.5267/j.jpm.2023.9.001
    • Vancouver

      Nagano MS, Rossi FL. A two-stage iterated greedy algorithm and a multi-objective constructive heuristic for the mixed no-idle flowshop scheduling problem to minimize makespan subject to total completion time [Internet]. Journal of Project Management. 2024 ; 9( 1): 45-60.[citado 2026 maio 04 ] Available from: https://dx.doi.org/10.5267/j.jpm.2023.9.001
  • Unidade: EESC

    Subjects: ALGORITMOS DE APROXIMAÇÃO, MODELOS MATEMÁTICOS, PROGRAMAÇÃO DA PRODUÇÃO

    Acesso à fonteAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ABREU, Levi Ribeiro de. Contributions to new variants of the open shop scheduling problem: modeling and solution methods. 2023. Tese (Doutorado) – Universidade de São Paulo, São Carlos, 2023. Disponível em: https://teses.usp.br/teses/disponiveis/18/18156/tde-19052023-162053/. Acesso em: 04 maio 2026.
    • APA

      Abreu, L. R. de. (2023). Contributions to new variants of the open shop scheduling problem: modeling and solution methods (Tese (Doutorado). Universidade de São Paulo, São Carlos. Recuperado de https://teses.usp.br/teses/disponiveis/18/18156/tde-19052023-162053/
    • NLM

      Abreu LR de. Contributions to new variants of the open shop scheduling problem: modeling and solution methods [Internet]. 2023 ;[citado 2026 maio 04 ] Available from: https://teses.usp.br/teses/disponiveis/18/18156/tde-19052023-162053/
    • Vancouver

      Abreu LR de. Contributions to new variants of the open shop scheduling problem: modeling and solution methods [Internet]. 2023 ;[citado 2026 maio 04 ] Available from: https://teses.usp.br/teses/disponiveis/18/18156/tde-19052023-162053/
  • Source: Journal of Project Management. Unidade: EESC

    Subjects: PROGRAMAÇÃO DA PRODUÇÃO, PROGRAMAÇÃO DINÂMICA, ENGENHARIA DE PRODUÇÃO

    Versão PublicadaAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      SOUZA, Edson Antonio Gonçalves de et al. Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times. Journal of Project Management, v. 8, n. 2, p. 99-118, 2023Tradução . . Disponível em: https://dx.doi.org/10.5267/j.jpm.2022.12.001. Acesso em: 04 maio 2026.
    • APA

      Souza, E. A. G. de, Nagano, M. S., Miyata, H. H., & Abreu, L. R. de. (2023). Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times. Journal of Project Management, 8( 2), 99-118. doi:10.5267/j.jpm.2022.12.001
    • NLM

      Souza EAG de, Nagano MS, Miyata HH, Abreu LR de. Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times [Internet]. Journal of Project Management. 2023 ; 8( 2): 99-118.[citado 2026 maio 04 ] Available from: https://dx.doi.org/10.5267/j.jpm.2022.12.001
    • Vancouver

      Souza EAG de, Nagano MS, Miyata HH, Abreu LR de. Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times [Internet]. Journal of Project Management. 2023 ; 8( 2): 99-118.[citado 2026 maio 04 ] Available from: https://dx.doi.org/10.5267/j.jpm.2022.12.001
  • Source: Livro de Resumos Expandidos. Conference titles: Simpósio Internacional de Iniciação Científica e Tecnológica da Universidade de São Paulo - SIICUSP. Unidade: EESC

    Subjects: PROGRAMAÇÃO DA PRODUÇÃO, HEURÍSTICA, ENGENHARIA DE PRODUÇÃO

    Versão PublicadaAcesso à fonteHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      VERZELLONI, João Victor Pascualote e NAGANO, Marcelo Seido. Heurística ALNS para problemas de programação de no-wait flowshop mistos. 2022, Anais.. São Carlos, SP: EESC/USP, 2022. Disponível em: http://soac.eesc.usp.br/index.php/siicusp/30siicusp/paper/viewFile/3526/2355. Acesso em: 04 maio 2026.
    • APA

      Verzelloni, J. V. P., & Nagano, M. S. (2022). Heurística ALNS para problemas de programação de no-wait flowshop mistos. In Livro de Resumos Expandidos. São Carlos, SP: EESC/USP. Recuperado de http://soac.eesc.usp.br/index.php/siicusp/30siicusp/paper/viewFile/3526/2355
    • NLM

      Verzelloni JVP, Nagano MS. Heurística ALNS para problemas de programação de no-wait flowshop mistos [Internet]. Livro de Resumos Expandidos. 2022 ;[citado 2026 maio 04 ] Available from: http://soac.eesc.usp.br/index.php/siicusp/30siicusp/paper/viewFile/3526/2355
    • Vancouver

      Verzelloni JVP, Nagano MS. Heurística ALNS para problemas de programação de no-wait flowshop mistos [Internet]. Livro de Resumos Expandidos. 2022 ;[citado 2026 maio 04 ] Available from: http://soac.eesc.usp.br/index.php/siicusp/30siicusp/paper/viewFile/3526/2355
  • Source: Computers & Industrial Engineering. Unidade: EP

    Subjects: CONTROLE DE ESTOQUES, PROGRAMAÇÃO DA PRODUÇÃO, PESQUISA OPERACIONAL

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MESQUITA, Marco Aurélio de e TOMOTANI, João Vitor. Simulation-optimization of inventory control of multiple products on a single machine with sequence-dependent setup times. Computers & Industrial Engineering, v. 174, p. 10 on-line, 2022Tradução . . Disponível em: https://doi.org/10.1016/j.cie.2022.108793. Acesso em: 04 maio 2026.
    • APA

      Mesquita, M. A. de, & Tomotani, J. V. (2022). Simulation-optimization of inventory control of multiple products on a single machine with sequence-dependent setup times. Computers & Industrial Engineering, 174, 10 on-line. doi:10.1016/j.cie.2022.108793
    • NLM

      Mesquita MA de, Tomotani JV. Simulation-optimization of inventory control of multiple products on a single machine with sequence-dependent setup times [Internet]. Computers & Industrial Engineering. 2022 ; 174 10 on-line.[citado 2026 maio 04 ] Available from: https://doi.org/10.1016/j.cie.2022.108793
    • Vancouver

      Mesquita MA de, Tomotani JV. Simulation-optimization of inventory control of multiple products on a single machine with sequence-dependent setup times [Internet]. Computers & Industrial Engineering. 2022 ; 174 10 on-line.[citado 2026 maio 04 ] Available from: https://doi.org/10.1016/j.cie.2022.108793
  • Source: International Journal of Production Research. Unidade: EESC

    Subjects: ENGENHARIA DE PRODUÇÃO, PROGRAMAÇÃO DA PRODUÇÃO, ALGORITMOS

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ABREU, Levi R. e NAGANO, Marcelo Seido e PRATA, Bruno A. A new two-stage constraint programming approach for open shop scheduling problem with machine blocking. International Journal of Production Research, 2022Tradução . . Disponível em: https://doi.org/10.1080/00207543.2022.2154404. Acesso em: 04 maio 2026.
    • APA

      Abreu, L. R., Nagano, M. S., & Prata, B. A. (2022). A new two-stage constraint programming approach for open shop scheduling problem with machine blocking. International Journal of Production Research. doi:10.1080/00207543.2022.2154404
    • NLM

      Abreu LR, Nagano MS, Prata BA. A new two-stage constraint programming approach for open shop scheduling problem with machine blocking [Internet]. International Journal of Production Research. 2022 ;[citado 2026 maio 04 ] Available from: https://doi.org/10.1080/00207543.2022.2154404
    • Vancouver

      Abreu LR, Nagano MS, Prata BA. A new two-stage constraint programming approach for open shop scheduling problem with machine blocking [Internet]. International Journal of Production Research. 2022 ;[citado 2026 maio 04 ] Available from: https://doi.org/10.1080/00207543.2022.2154404
  • Source: Engineering Optimization. Unidade: EESC

    Subjects: PROGRAMAÇÃO DA PRODUÇÃO, SCHEDULING, ALGORITMOS DE SCHEDULING, ENGENHARIA DE PRODUÇÃO

    Versão PublicadaAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      PRATA, Bruno de Athayde e NAGANO, Marcelo Seido. A novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardiness. Engineering Optimization, p. [1-15], 2022Tradução . . Disponível em: https://doi.org/10.1080/0305215X.2022.2144274. Acesso em: 04 maio 2026.
    • APA

      Prata, B. de A., & Nagano, M. S. (2022). A novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardiness. Engineering Optimization, [1-15]. doi:10.1080/0305215X.2022.2144274
    • NLM

      Prata B de A, Nagano MS. A novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardiness [Internet]. Engineering Optimization. 2022 ; [1-15].[citado 2026 maio 04 ] Available from: https://doi.org/10.1080/0305215X.2022.2144274
    • Vancouver

      Prata B de A, Nagano MS. A novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardiness [Internet]. Engineering Optimization. 2022 ; [1-15].[citado 2026 maio 04 ] Available from: https://doi.org/10.1080/0305215X.2022.2144274
  • Unidade: EESC

    Subjects: HEURÍSTICA, PROGRAMAÇÃO DA PRODUÇÃO, SEQUENCIAÇÃO DA PRODUÇÃO, TEMPO

    Acesso à fonteAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ALMEIDA, Fernando Siqueira de. Heuristics for multi-objective no-wait flow shops with sequence-dependent setup times. 2021. Dissertação (Mestrado) – Universidade de São Paulo, São Carlos, 2021. Disponível em: https://www.teses.usp.br/teses/disponiveis/18/18156/tde-07122021-164135/. Acesso em: 04 maio 2026.
    • APA

      Almeida, F. S. de. (2021). Heuristics for multi-objective no-wait flow shops with sequence-dependent setup times (Dissertação (Mestrado). Universidade de São Paulo, São Carlos. Recuperado de https://www.teses.usp.br/teses/disponiveis/18/18156/tde-07122021-164135/
    • NLM

      Almeida FS de. Heuristics for multi-objective no-wait flow shops with sequence-dependent setup times [Internet]. 2021 ;[citado 2026 maio 04 ] Available from: https://www.teses.usp.br/teses/disponiveis/18/18156/tde-07122021-164135/
    • Vancouver

      Almeida FS de. Heuristics for multi-objective no-wait flow shops with sequence-dependent setup times [Internet]. 2021 ;[citado 2026 maio 04 ] Available from: https://www.teses.usp.br/teses/disponiveis/18/18156/tde-07122021-164135/
  • Unidade: EP

    Subjects: CONTROLE DE ESTOQUES, PROGRAMAÇÃO DA PRODUÇÃO, PESQUISA OPERACIONAL

    Acesso à fonteHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      TOMOTANI, João Vitor. Aplicação do método de simulação e otimização ao problema de dimensionamento e sequenciamento de lotes de produção. 2021. Dissertação (Mestrado) – Universidade de São Paulo, São Paulo, 2021. Disponível em: https://www.teses.usp.br/teses/disponiveis/3/3136/tde-04032022-090208/. Acesso em: 04 maio 2026.
    • APA

      Tomotani, J. V. (2021). Aplicação do método de simulação e otimização ao problema de dimensionamento e sequenciamento de lotes de produção (Dissertação (Mestrado). Universidade de São Paulo, São Paulo. Recuperado de https://www.teses.usp.br/teses/disponiveis/3/3136/tde-04032022-090208/
    • NLM

      Tomotani JV. Aplicação do método de simulação e otimização ao problema de dimensionamento e sequenciamento de lotes de produção [Internet]. 2021 ;[citado 2026 maio 04 ] Available from: https://www.teses.usp.br/teses/disponiveis/3/3136/tde-04032022-090208/
    • Vancouver

      Tomotani JV. Aplicação do método de simulação e otimização ao problema de dimensionamento e sequenciamento de lotes de produção [Internet]. 2021 ;[citado 2026 maio 04 ] Available from: https://www.teses.usp.br/teses/disponiveis/3/3136/tde-04032022-090208/
  • Unidade: EESC

    Subjects: SCHEDULING, SEQUENCIAÇÃO DA PRODUÇÃO, HEURÍSTICA, PROGRAMAÇÃO DA PRODUÇÃO

    Acesso à fonteAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      REIS, Viviane Souza Viléla Junqueira dos. The no-wait flow shop scheduling problem with sequence-dependent setup times: a comprehensive review and an application of the ALNS algorithm. 2021. Dissertação (Mestrado) – Universidade de São Paulo, São Carlos, 2021. Disponível em: https://teses.usp.br/teses/disponiveis/18/18156/tde-17082023-144657/. Acesso em: 04 maio 2026.
    • APA

      Reis, V. S. V. J. dos. (2021). The no-wait flow shop scheduling problem with sequence-dependent setup times: a comprehensive review and an application of the ALNS algorithm (Dissertação (Mestrado). Universidade de São Paulo, São Carlos. Recuperado de https://teses.usp.br/teses/disponiveis/18/18156/tde-17082023-144657/
    • NLM

      Reis VSVJ dos. The no-wait flow shop scheduling problem with sequence-dependent setup times: a comprehensive review and an application of the ALNS algorithm [Internet]. 2021 ;[citado 2026 maio 04 ] Available from: https://teses.usp.br/teses/disponiveis/18/18156/tde-17082023-144657/
    • Vancouver

      Reis VSVJ dos. The no-wait flow shop scheduling problem with sequence-dependent setup times: a comprehensive review and an application of the ALNS algorithm [Internet]. 2021 ;[citado 2026 maio 04 ] Available from: https://teses.usp.br/teses/disponiveis/18/18156/tde-17082023-144657/

Digital Library of Intellectual Production of Universidade de São Paulo     2012 - 2026