A new two-stage constraint programming approach for open shop scheduling problem with machine blocking (2022)
- Authors:
- USP affiliated authors: NAGANO, MARCELO SEIDO - EESC ; ABREU, LEVI RIBEIRO DE - EESC
- Unidade: EESC
- DOI: 10.1080/00207543.2022.2154404
- Subjects: ENGENHARIA DE PRODUÇÃO; PROGRAMAÇÃO DA PRODUÇÃO; ALGORITMOS
- Agências de fomento:
- Language: Inglês
- Imprenta:
- Publisher: Taylor & Francis
- Publisher place: Abingdon, UK
- Date published: 2022
- Source:
- Título: International Journal of Production Research
- ISSN: 0020-7543
- Volume/Número/Paginação/Ano: on-line, 2021
- Este periódico é de acesso aberto
- Este artigo NÃO é de acesso aberto
-
ABNT
ABREU, Levi R. e NAGANO, Marcelo Seido e PRATA, Bruno A. A new two-stage constraint programming approach for open shop scheduling problem with machine blocking. International Journal of Production Research, 2022Tradução . . Disponível em: https://doi.org/10.1080/00207543.2022.2154404. Acesso em: 13 fev. 2026. -
APA
Abreu, L. R., Nagano, M. S., & Prata, B. A. (2022). A new two-stage constraint programming approach for open shop scheduling problem with machine blocking. International Journal of Production Research. doi:10.1080/00207543.2022.2154404 -
NLM
Abreu LR, Nagano MS, Prata BA. A new two-stage constraint programming approach for open shop scheduling problem with machine blocking [Internet]. International Journal of Production Research. 2022 ;[citado 2026 fev. 13 ] Available from: https://doi.org/10.1080/00207543.2022.2154404 -
Vancouver
Abreu LR, Nagano MS, Prata BA. A new two-stage constraint programming approach for open shop scheduling problem with machine blocking [Internet]. International Journal of Production Research. 2022 ;[citado 2026 fev. 13 ] Available from: https://doi.org/10.1080/00207543.2022.2154404 - A novel BRKGA for the customer order scheduling with missing operations to minimize total tardiness
- New efficient heuristics for scheduling open shops with makespan minimization
- Total tardiness minimization in a single-machine with periodical resource constraints
- A new variable neighbourhood search with a constraint programming search strategy for the open shop scheduling problem with operation repetitions
- Contributions to new variants of the open shop scheduling problem: modeling and solution methods
- Elementos para estruturação de um modelo multicritério de auxílio à decisão de investimentos que considere aspectos sociais, ambientais e econômico-financeiros
- Otimização do saldo de caixa com algoritmos genéticos: um estudo relacionando cruzamento e mutação no modelo de Miller e Orr
- O capital de relacionamento como estratégia de qualidade
- Interação e cooperação em arranjos produtivos locais: identificação e análise dos fatores inibidores
- Otimização do investimento em saldo de caixa: um complemento ao modelo de Miller e Orr
Informações sobre o DOI: 10.1080/00207543.2022.2154404 (Fonte: oaDOI API)
Download do texto completo
| Tipo | Nome | Link | |
|---|---|---|---|
| A new two stage constrain... |
How to cite
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
