New efficient heuristics for scheduling open shops with makespan minimization (2022)
- Authors:
- USP affiliated authors: NAGANO, MARCELO SEIDO - EESC ; ABREU, LEVI RIBEIRO DE - EESC
- Unidade: EESC
- DOI: 10.1016/j.cor.2022.105744
- Assunto: ENGENHARIA DE PRODUÇÃO
- Agências de fomento:
- Financiamento CEPID-FAPESP
- Financiado pela FAPESP
- Financiado pelo CNPq
- Financiado pela CAPES
- Financiado pelo Spanish Ministry of Science and Education. ASSORT project — Grant no. PID2019-108756RBI00
- Financiado pelo Andalusian Government. Projects DEMAND — Grant no. P18-FR-1149 and EFECTOS - Grant no. US-1264511
- Language: Inglês
- Imprenta:
- Publisher: Elsevier
- Publisher place: Oxford, United Kingdom
- Date published: 2022
- Source:
- Título: Computers and Operations Research
- ISSN: 0305-0548
- Volume/Número/Paginação/Ano: v. 142, artciel 105744, p. 1-21, 2022
- Status:
- Artigo possui versão em acesso aberto em repositório (Green Open Access)
- Versão do Documento:
- Versão submetida (Pré-print)
- Acessar versão aberta:
-
ABNT
ABREU, Levi Ribeiro de et al. New efficient heuristics for scheduling open shops with makespan minimization. Computers and Operations Research, v. 142, p. 1-21, 2022Tradução . . Disponível em: https://doi.org/10.1016/j.cor.2022.105744. Acesso em: 02 abr. 2026. -
APA
Abreu, L. R. de, Prata, B. de A., Framinan, J. M., & Nagano, M. S. (2022). New efficient heuristics for scheduling open shops with makespan minimization. Computers and Operations Research, 142, 1-21. doi:10.1016/j.cor.2022.105744 -
NLM
Abreu LR de, Prata B de A, Framinan JM, Nagano MS. New efficient heuristics for scheduling open shops with makespan minimization [Internet]. Computers and Operations Research. 2022 ; 142 1-21.[citado 2026 abr. 02 ] Available from: https://doi.org/10.1016/j.cor.2022.105744 -
Vancouver
Abreu LR de, Prata B de A, Framinan JM, Nagano MS. New efficient heuristics for scheduling open shops with makespan minimization [Internet]. Computers and Operations Research. 2022 ; 142 1-21.[citado 2026 abr. 02 ] Available from: https://doi.org/10.1016/j.cor.2022.105744 - Total tardiness minimization in a single-machine with periodical resource constraints
- A new two-stage constraint programming approach for open shop scheduling problem with machine blocking
- A novel BRKGA for the customer order scheduling with missing operations to minimize total tardiness
- A new variable neighbourhood search with a constraint programming search strategy for the open shop scheduling problem with operation repetitions
- Contributions to new variants of the open shop scheduling problem: modeling and solution methods
- Otimização do saldo de caixa com algoritmos genéticos: um estudo relacionando cruzamento e mutação no modelo de Miller e Orr
- O capital de relacionamento como estratégia de qualidade
- Interação e cooperação em arranjos produtivos locais: identificação e análise dos fatores inibidores
- Otimização do investimento em saldo de caixa: um complemento ao modelo de Miller e Orr
- Heurística evolutiva para a minimização da duração total da programação em sistemas de produção no-idle flow shop
Informações sobre a disponibilidade de versões do artigo em acesso aberto coletadas automaticamente via oaDOI API (Unpaywall).
Por se tratar de integração com serviço externo, podem existir diferentes versões do trabalho (como preprints ou postprints), que podem diferir da versão publicada.
Download do texto completo
| Tipo | Nome | Link | |
|---|---|---|---|
| 1-s2.0-S0305054822000429-... |
How to cite
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas