Filtros : "ENGENHARIA DE PRODUCAO" "Engineering Optimization" Removido: "ICB-BMP" Limpar

Filtros



Refine with date range


  • Source: Engineering Optimization. Unidade: EESC

    Subjects: MANUTENÇÃO PREVENTIVA, HEURÍSTICA, SCHEDULING

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MIYATA, Hugo Hissashi e NAGANO, Marcelo Seido e GUPTAB, Jatinder N. D. Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study. Engineering Optimization, v. 51, n. 4, 2018Tradução . . Disponível em: https://doi.org/10.1080/0305215X.2018.1485903. Acesso em: 23 jun. 2024.
    • APA

      Miyata, H. H., Nagano, M. S., & Guptab, J. N. D. (2018). Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study. Engineering Optimization, 51( 4). doi:10.1080/0305215X.2018.1485903
    • NLM

      Miyata HH, Nagano MS, Guptab JND. Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study [Internet]. Engineering Optimization. 2018 ; 51( 4):[citado 2024 jun. 23 ] Available from: https://doi.org/10.1080/0305215X.2018.1485903
    • Vancouver

      Miyata HH, Nagano MS, Guptab JND. Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study [Internet]. Engineering Optimization. 2018 ; 51( 4):[citado 2024 jun. 23 ] Available from: https://doi.org/10.1080/0305215X.2018.1485903
  • Source: Engineering Optimization. Unidade: EESC

    Subjects: HEURÍSTICA, SCHEDULING

    Versão PublicadaAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      NAGANO, Marcelo Seido e ROSSI, Fernando Luis e MARTARELLI, Nádia Junqueira. High-performing heuristics to minimize flowtime in no-idle permutation flowshop. Engineering Optimization, v. 51, n. 2, 2018Tradução . . Disponível em: https://doi.org/10.1080/0305215X.2018.1444163. Acesso em: 23 jun. 2024.
    • APA

      Nagano, M. S., Rossi, F. L., & Martarelli, N. J. (2018). High-performing heuristics to minimize flowtime in no-idle permutation flowshop. Engineering Optimization, 51( 2). doi:10.1080/0305215X.2018.1444163
    • NLM

      Nagano MS, Rossi FL, Martarelli NJ. High-performing heuristics to minimize flowtime in no-idle permutation flowshop [Internet]. Engineering Optimization. 2018 ; 51( 2):[citado 2024 jun. 23 ] Available from: https://doi.org/10.1080/0305215X.2018.1444163
    • Vancouver

      Nagano MS, Rossi FL, Martarelli NJ. High-performing heuristics to minimize flowtime in no-idle permutation flowshop [Internet]. Engineering Optimization. 2018 ; 51( 2):[citado 2024 jun. 23 ] Available from: https://doi.org/10.1080/0305215X.2018.1444163

Digital Library of Intellectual Production of Universidade de São Paulo     2012 - 2024