Robot-oriented design for production in the context of building information modeling (2016)
- Autor:
- Autor USP: CORRÊA, FABIANO ROGERIO - EP
- Unidade: EP
- DOI: 10.22260/ISARC2016/0103
- Subjects: GERENCIAMENTO DA CONSTRUÇÃO; GESTÃO DE PROJETOS; ROBÓTICA; TERCEIRA DIMENSÃO
- Language: Inglês
- Imprenta:
- Publisher: IAARC
- Publisher place: Oulu, Finland
- Date published: 2016
- Source:
- Título: ISARC Proceedings
- ISSN: 2413-5844
- Conference titles: International Symposium on Automation and Robotics in Construction - ISARC 2016
- Este periódico é de acesso aberto
- Este artigo NÃO é de acesso aberto
-
ABNT
CORREA, Fabiano Rogério. Robot-oriented design for production in the context of building information modeling. 2016, Anais.. Oulu, Finland: IAARC, 2016. Disponível em: https://doi.org/10.22260/ISARC2016/0103. Acesso em: 23 jan. 2026. -
APA
Correa, F. R. (2016). Robot-oriented design for production in the context of building information modeling. In ISARC Proceedings. Oulu, Finland: IAARC. doi:10.22260/ISARC2016/0103 -
NLM
Correa FR. Robot-oriented design for production in the context of building information modeling [Internet]. ISARC Proceedings. 2016 ;[citado 2026 jan. 23 ] Available from: https://doi.org/10.22260/ISARC2016/0103 -
Vancouver
Correa FR. Robot-oriented design for production in the context of building information modeling [Internet]. ISARC Proceedings. 2016 ;[citado 2026 jan. 23 ] Available from: https://doi.org/10.22260/ISARC2016/0103 - Cyber-physical systems for construction industry
- Mapeamento semântico com aprendizado estatístico relacional para representação de conhecimento em robótica móvel
- Grades de evidência com visão estéreo omnidirecional para navegação de robôs móveis
- Integrating industry 4.0 associated technologies into automated and traditional construction
- Towards digital twins for heritage buildings: a workflow proposal
- Is BIM big enough to take advantage of big data analytics?
- Simulating wood-framing wall panel's production with timed coloured Petri nets
- Simulation of construction processes as a link between BIM models and construction progression on-site
- Interoperability in BIM prefabricated wood framing housing process
- Workflow for the architectural housing conception based on local data of subnormal agglomerates
Informações sobre o DOI: 10.22260/ISARC2016/0103 (Fonte: oaDOI API)
Download do texto completo
| Tipo | Nome | Link | |
|---|---|---|---|
| Robot oriented design for... | Direct link |
How to cite
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
