Time windows and constraint programming to deal with strong restriction in the due date of productive systems (2014)
- Authors:
- USP affiliated authors: JUNQUEIRA, FABRÍCIO - EP ; SANTOS FILHO, DIOLINO JOSE DOS - EP ; MIYAGI, PAULO EIGI - EP ; PESSOA, MARCOSIRIS AMORIM DE OLIVEIRA - EP
- Unidade: EP
- DOI: 10.1016/j.arcontrol.2014.03.013
- Subjects: HEURÍSTICA; SISTEMAS DE MANUFATURAS
- Language: Inglês
- Imprenta:
- Source:
- Título: Annual Reviews in Control
- ISSN: 0926-5805
- Volume/Número/Paginação/Ano: v. 38, n. 1, p. 134-146, 2014
- Este periódico é de assinatura
- Este artigo NÃO é de acesso aberto
- Cor do Acesso Aberto: closed
-
ABNT
PESSOA, Marcosiris Amorim de Oliveira et al. Time windows and constraint programming to deal with strong restriction in the due date of productive systems. Annual Reviews in Control, v. 38, n. 1, p. 134-146, 2014Tradução . . Disponível em: https://doi.org/10.1016/j.arcontrol.2014.03.013. Acesso em: 27 dez. 2025. -
APA
Pessoa, M. A. de O., Estombelo-Montesco, R. A., Junqueira, F., Santos Filho, D. J. dos, & Miyagi, P. E. (2014). Time windows and constraint programming to deal with strong restriction in the due date of productive systems. Annual Reviews in Control, 38( 1), 134-146. doi:10.1016/j.arcontrol.2014.03.013 -
NLM
Pessoa MA de O, Estombelo-Montesco RA, Junqueira F, Santos Filho DJ dos, Miyagi PE. Time windows and constraint programming to deal with strong restriction in the due date of productive systems [Internet]. Annual Reviews in Control. 2014 ; 38( 1): 134-146.[citado 2025 dez. 27 ] Available from: https://doi.org/10.1016/j.arcontrol.2014.03.013 -
Vancouver
Pessoa MA de O, Estombelo-Montesco RA, Junqueira F, Santos Filho DJ dos, Miyagi PE. Time windows and constraint programming to deal with strong restriction in the due date of productive systems [Internet]. Annual Reviews in Control. 2014 ; 38( 1): 134-146.[citado 2025 dez. 27 ] Available from: https://doi.org/10.1016/j.arcontrol.2014.03.013 - Heurística de planejamento utilizando janelas de tempo para sistemas produtivos teleoperados
- Scheduling heuristic based on time windows for service-oriented architecture
- An architecture based on RAMI 4.0 to discover equipment to process operations required by products
- Advanced planning and scheduling systems based on time windows and constraint programming
- Planning and scheduling for dispersed and collaborative productive system
- System proposal for supervision of critical adverse processes in patients with implanted ventricular assist devices
- Controle de sistemas de manufatura baseado em alocação de funcionalidades
- Service composition modeling using interpreted Petri net for system integration
- A systematic modelling procedure to design agent-oriented control to coalition of capabilities: in the context of I4.0 as Virtual Assets (AAS)
- Using the enhanced-mark flow graph for dynamic resource allocation in distributed manufacturing
Informações sobre o DOI: 10.1016/j.arcontrol.2014.03.013 (Fonte: oaDOI API)
Download do texto completo
| Tipo | Nome | Link | |
|---|---|---|---|
| Miyagi-2014-Time windows ... |
How to cite
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
