Planning and scheduling for dispersed and collaborative productive system (2011)
- Authors:
- USP affiliated authors: JUNQUEIRA, FABRÍCIO - EP ; MIYAGI, PAULO EIGI - EP ; SANTOS FILHO, DIOLINO JOSE DOS - EP ; PESSOA, MARCOSIRIS AMORIM DE OLIVEIRA - EP
- Unidade: EP
- DOI: 10.1007/978-3-642-19170-1_6
- Subjects: SISTEMAS DE PRODUÇÃO; HEURÍSTICA
- Language: Inglês
- Imprenta:
- Source:
- Título: Proceedings
- Conference titles: IFIP WG 5.5/SOCOLNET Doctoral Conference on Computing, Electrical and Industrial Systems
- Este periódico é de assinatura
- Este artigo NÃO é de acesso aberto
- Cor do Acesso Aberto: closed
-
ABNT
PESSOA, Marcosiris Amorim de Oliveira et al. Planning and scheduling for dispersed and collaborative productive system. 2011, Anais.. Berlin: Springer, 2011. Disponível em: https://doi.org/10.1007/978-3-642-19170-1_6. Acesso em: 27 dez. 2025. -
APA
Pessoa, M. A. de O., Junqueira, F., Miyagi, P. E., & Santos Filho, D. J. dos. (2011). Planning and scheduling for dispersed and collaborative productive system. In Proceedings. Berlin: Springer. doi:10.1007/978-3-642-19170-1_6 -
NLM
Pessoa MA de O, Junqueira F, Miyagi PE, Santos Filho DJ dos. Planning and scheduling for dispersed and collaborative productive system [Internet]. Proceedings. 2011 ;[citado 2025 dez. 27 ] Available from: https://doi.org/10.1007/978-3-642-19170-1_6 -
Vancouver
Pessoa MA de O, Junqueira F, Miyagi PE, Santos Filho DJ dos. Planning and scheduling for dispersed and collaborative productive system [Internet]. Proceedings. 2011 ;[citado 2025 dez. 27 ] Available from: https://doi.org/10.1007/978-3-642-19170-1_6 - Heurística de planejamento utilizando janelas de tempo para sistemas produtivos teleoperados
- Scheduling heuristic based on time windows for service-oriented architecture
- Time windows and constraint programming to deal with strong restriction in the due date of productive systems
- An architecture based on RAMI 4.0 to discover equipment to process operations required by products
- Advanced planning and scheduling systems based on time windows and constraint programming
- System proposal for supervision of critical adverse processes in patients with implanted ventricular assist devices
- Controle de sistemas de manufatura baseado em alocação de funcionalidades
- Service composition modeling using interpreted Petri net for system integration
- A systematic modelling procedure to design agent-oriented control to coalition of capabilities: in the context of I4.0 as Virtual Assets (AAS)
- Using the enhanced-mark flow graph for dynamic resource allocation in distributed manufacturing
Informações sobre o DOI: 10.1007/978-3-642-19170-1_6 (Fonte: oaDOI API)
Download do texto completo
| Tipo | Nome | Link | |
|---|---|---|---|
| Miyagi-2011-Planning and ... |
How to cite
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
