Time windows and constraint programming to deal with strong restriction in the due date of productive systems (2014)
- Autores:
- Autores USP: JUNQUEIRA, FABRÍCIO - EP ; SANTOS FILHO, DIOLINO JOSE DOS - EP ; MIYAGI, PAULO EIGI - EP ; PESSOA, MARCOSIRIS AMORIM DE OLIVEIRA - EP
- Unidade: EP
- DOI: 10.1016/j.arcontrol.2014.03.013
- Assuntos: HEURÍSTICA; SISTEMAS DE MANUFATURAS
- Idioma: Inglês
- Imprenta:
- Fonte:
- Título do periódico: Annual Reviews in Control
- ISSN: 0926-5805
- Volume/Número/Paginação/Ano: v. 38, n. 1, p. 134-146, 2014
- Este periódico é de assinatura
- Este artigo NÃO é de acesso aberto
- Cor do Acesso Aberto: closed
-
ABNT
PESSOA, Marcosiris Amorim de Oliveira et al. Time windows and constraint programming to deal with strong restriction in the due date of productive systems. Annual Reviews in Control, v. 38, n. 1, p. 134-146, 2014Tradução . . Disponível em: https://doi.org/10.1016/j.arcontrol.2014.03.013. Acesso em: 18 abr. 2024. -
APA
Pessoa, M. A. de O., Estombelo-Montesco, R. A., Junqueira, F., Santos Filho, D. J. dos, & Miyagi, P. E. (2014). Time windows and constraint programming to deal with strong restriction in the due date of productive systems. Annual Reviews in Control, 38( 1), 134-146. doi:10.1016/j.arcontrol.2014.03.013 -
NLM
Pessoa MA de O, Estombelo-Montesco RA, Junqueira F, Santos Filho DJ dos, Miyagi PE. Time windows and constraint programming to deal with strong restriction in the due date of productive systems [Internet]. Annual Reviews in Control. 2014 ; 38( 1): 134-146.[citado 2024 abr. 18 ] Available from: https://doi.org/10.1016/j.arcontrol.2014.03.013 -
Vancouver
Pessoa MA de O, Estombelo-Montesco RA, Junqueira F, Santos Filho DJ dos, Miyagi PE. Time windows and constraint programming to deal with strong restriction in the due date of productive systems [Internet]. Annual Reviews in Control. 2014 ; 38( 1): 134-146.[citado 2024 abr. 18 ] Available from: https://doi.org/10.1016/j.arcontrol.2014.03.013 - Heurística de planejamento utilizando janelas de tempo para sistemas produtivos teleoperados
- Scheduling heuristic based on time windows for service-oriented architecture
- An architecture based on RAMI 4.0 to discover equipment to process operations required by products
- Planning and scheduling for dispersed and collaborative productive system
- Advanced planning and scheduling systems based on time windows and constraint programming
- A systematic modelling procedure to design agent-oriented control to coalition of capabilities: in the context of I4.0 as Virtual Assets (AAS)
- Controle de sistemas de manufatura baseado em alocação de funcionalidades
- Service composition modeling using interpreted Petri net for system integration
- Design of reconfigurable and collaborative control system for productive systems
- Process control system considering the machines functional flexibilities
Informações sobre o DOI: 10.1016/j.arcontrol.2014.03.013 (Fonte: oaDOI API)
Download do texto completo
Tipo | Nome | Link | |
---|---|---|---|
Miyagi-2014-Time windows ... |
Como citar
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas