Virtual enterprise planning system using time windows and capacity constraint concepts (2012)
- Authors:
- USP affiliated authors: PESSOA, MARCOSIRIS AMORIM DE OLIVEIRA - EP ; JUNQUEIRA, FABRÍCIO - EP ; SANTOS FILHO, DIOLINO JOSE DOS - EP ; MOSCATO, LUCAS ANTONIO - EP ; MIYAGI, PAULO EIGI - EP ; MARUYAMA, NEWTON - EP
- Unidade: EP
- DOI: 10.1109/IECON.2012.6389443
- Subjects: SISTEMAS DE PRODUÇÃO; MANUFATURA
- Language: Inglês
- Imprenta:
- Source:
- Título: Proceedings
- Conference titles: Annual Conference of the IEEE Industrial Electronics Society - IECON 2012
- Este periódico é de assinatura
- Este artigo NÃO é de acesso aberto
- Cor do Acesso Aberto: closed
-
ABNT
PESSOA, Marcosiris Amorim de Oliveira et al. Virtual enterprise planning system using time windows and capacity constraint concepts. 2012, Anais.. New York: IEEE, 2012. Disponível em: https://doi.org/10.1109/IECON.2012.6389443. Acesso em: 08 out. 2024. -
APA
Pessoa, M. A. de O., Junqueira, F., Santos Filho, D. J. dos, Maruyama, N., Moscato, L. A., & Miyagi, P. E. (2012). Virtual enterprise planning system using time windows and capacity constraint concepts. In Proceedings. New York: IEEE. doi:10.1109/IECON.2012.6389443 -
NLM
Pessoa MA de O, Junqueira F, Santos Filho DJ dos, Maruyama N, Moscato LA, Miyagi PE. Virtual enterprise planning system using time windows and capacity constraint concepts [Internet]. Proceedings. 2012 ;[citado 2024 out. 08 ] Available from: https://doi.org/10.1109/IECON.2012.6389443 -
Vancouver
Pessoa MA de O, Junqueira F, Santos Filho DJ dos, Maruyama N, Moscato LA, Miyagi PE. Virtual enterprise planning system using time windows and capacity constraint concepts [Internet]. Proceedings. 2012 ;[citado 2024 out. 08 ] Available from: https://doi.org/10.1109/IECON.2012.6389443 - Heurística de planejamento utilizando janelas de tempo para sistemas produtivos teleoperados
- Scheduling heuristic based on time windows for service-oriented architecture
- Time windows and constraint programming to deal with strong restriction in the due date of productive systems
- An architecture based on RAMI 4.0 to discover equipment to process operations required by products
- Planning and scheduling for dispersed and collaborative productive system
- Advanced planning and scheduling systems based on time windows and constraint programming
- A control architecture for distributed production systems using a virtual cellular manufacturing and agents society based approach
- Método para projeto de sistema de controle supervisório considerando flexibilidade de reconfiguração
- Modelagem de serviço de saúde utilizando redes de Petri interpretadas
- A systematic modelling procedure to design agent-oriented control to coalition of capabilities: in the context of I4.0 as Virtual Assets (AAS)
Informações sobre o DOI: 10.1109/IECON.2012.6389443 (Fonte: oaDOI API)
Download do texto completo
Tipo | Nome | Link | |
---|---|---|---|
Moscato-2012-Virtual Ente... |
How to cite
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas