Filtros : "ENGENHARIA DE PRODUCAO" "Growing Science" Limpar

Filtros



Refine with date range


  • Source: International Journal of Industrial Engineering Computations. Unidade: EESC

    Subjects: SISTEMAS DE PRODUÇÃO, PROGRAMAÇÃO DA PRODUÇÃO, MANUTENÇÃO PREVENTIVA, HEURÍSTICA

    Versão PublicadaAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      YAMADA, Tuane Tonani e NAGANO, Marcelo Seido e MIYATA, Hugo Hissashi. Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance. International Journal of Industrial Engineering Computations, v. 12, p. 415-426, 2021Tradução . . Disponível em: https://doi.org/10.5267/j.ijiec.2021.5.002. Acesso em: 03 jun. 2024.
    • APA

      Yamada, T. T., Nagano, M. S., & Miyata, H. H. (2021). Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance. International Journal of Industrial Engineering Computations, 12, 415-426. doi:10.5267/j.ijiec.2021.5.002
    • NLM

      Yamada TT, Nagano MS, Miyata HH. Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance [Internet]. International Journal of Industrial Engineering Computations. 2021 ; 12 415-426.[citado 2024 jun. 03 ] Available from: https://doi.org/10.5267/j.ijiec.2021.5.002
    • Vancouver

      Yamada TT, Nagano MS, Miyata HH. Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance [Internet]. International Journal of Industrial Engineering Computations. 2021 ; 12 415-426.[citado 2024 jun. 03 ] Available from: https://doi.org/10.5267/j.ijiec.2021.5.002
  • Source: International Journal of Industrial Engineering Computations. Unidade: EESC

    Subjects: PROGRAMAÇÃO DA PRODUÇÃO, HEURÍSTICA, TEMPO

    Versão PublicadaAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      TAKANO, Mauricio Iwama e NAGANO, Marcelo Seido. Evaluating the performance of constructive heuristics for the blocking flow shop scheduling problem with setup times. International Journal of Industrial Engineering Computations, v. 10, p. 37-50, 2019Tradução . . Disponível em: https://doi.org/10.5267/j.ijiec.2018.5.002. Acesso em: 03 jun. 2024.
    • APA

      Takano, M. I., & Nagano, M. S. (2019). Evaluating the performance of constructive heuristics for the blocking flow shop scheduling problem with setup times. International Journal of Industrial Engineering Computations, 10, 37-50. doi:10.5267/j.ijiec.2018.5.002
    • NLM

      Takano MI, Nagano MS. Evaluating the performance of constructive heuristics for the blocking flow shop scheduling problem with setup times [Internet]. International Journal of Industrial Engineering Computations. 2019 ; 10 37-50.[citado 2024 jun. 03 ] Available from: https://doi.org/10.5267/j.ijiec.2018.5.002
    • Vancouver

      Takano MI, Nagano MS. Evaluating the performance of constructive heuristics for the blocking flow shop scheduling problem with setup times [Internet]. International Journal of Industrial Engineering Computations. 2019 ; 10 37-50.[citado 2024 jun. 03 ] Available from: https://doi.org/10.5267/j.ijiec.2018.5.002

Digital Library of Intellectual Production of Universidade de São Paulo     2012 - 2024