Source: REM: International Engineering Journal. Unidade: EP
Subjects: MINERAÇÃO, SIMULAÇÃO
ABNT
CREMONESE, Dennis Travagini e KARANTH, Bhaskar e DE TOMI, Giorgio Francesco Cesare. A high-level dynamic analysis approach for studying global process plant availability and production time in the early stages of mining projects. REM: International Engineering Journal, v. 70, n. abr./ju 2017, p. 215-220, 2017Tradução . . Disponível em: https://doi.org/10.1590/0370-44672016700043. Acesso em: 23 maio 2024.APA
Cremonese, D. T., Karanth, B., & De Tomi, G. F. C. (2017). A high-level dynamic analysis approach for studying global process plant availability and production time in the early stages of mining projects. REM: International Engineering Journal, 70( abr./ju 2017), 215-220. doi:10.1590/0370-44672016700043NLM
Cremonese DT, Karanth B, De Tomi GFC. A high-level dynamic analysis approach for studying global process plant availability and production time in the early stages of mining projects [Internet]. REM: International Engineering Journal. 2017 ; 70( abr./ju 2017): 215-220.[citado 2024 maio 23 ] Available from: https://doi.org/10.1590/0370-44672016700043Vancouver
Cremonese DT, Karanth B, De Tomi GFC. A high-level dynamic analysis approach for studying global process plant availability and production time in the early stages of mining projects [Internet]. REM: International Engineering Journal. 2017 ; 70( abr./ju 2017): 215-220.[citado 2024 maio 23 ] Available from: https://doi.org/10.1590/0370-44672016700043