Improving the reliability of the critical asset maintenance plan using entropy and MAUT approaches: a hydropower plant case study (2021)
- Authors:
- USP affiliated authors: SOUZA, GILBERTO FRANCISCO MARTHA DE - EP ; NETTO, ADHERBAL CAMINADA - EP ; MURAD, CARLOS ALBERTO - EP ; SILVA, ALÉCIO JULIO - EP ; MICHALSKI, MIGUEL ANGELO DE CARVALHO - EP ; MELANI, ARTHUR HENRIQUE DE ANDRADE - EP
- Unidade: EP
- DOI: 10.3850/978-981-18-2016-8 186-cd
- Subjects: USINAS HIDRELÉTRICAS; ELEMENTOS DE MÁQUINAS; MANUTENÇÃO PREVENTIVA
- Agências de fomento:
- Language: Inglês
- Imprenta:
- Source:
- Título: Proceedings
- Conference titles: European Safety and Reliability Conference
- Este artigo NÃO possui versão em acesso aberto
-
ABNT
MURAD, Carlos Alberto et al. Improving the reliability of the critical asset maintenance plan using entropy and MAUT approaches: a hydropower plant case study. 2021, Anais.. Singapore: Escola Politécnica, Universidade de São Paulo, 2021. Disponível em: https://www.rpsonline.com.sg/proceedings/9789811820168/html/186.xml. Acesso em: 15 mar. 2026. -
APA
Murad, C. A., Bellinello, M. M., Silva, A. J., Souza, G. F. M. de, Caminada Netto, A., Melani, A. H. de A., & Michalski, M. A. D. C. (2021). Improving the reliability of the critical asset maintenance plan using entropy and MAUT approaches: a hydropower plant case study. In Proceedings. Singapore: Escola Politécnica, Universidade de São Paulo. doi:10.3850/978-981-18-2016-8 186-cd -
NLM
Murad CA, Bellinello MM, Silva AJ, Souza GFM de, Caminada Netto A, Melani AH de A, Michalski MADC. Improving the reliability of the critical asset maintenance plan using entropy and MAUT approaches: a hydropower plant case study [Internet]. Proceedings. 2021 ;[citado 2026 mar. 15 ] Available from: https://www.rpsonline.com.sg/proceedings/9789811820168/html/186.xml -
Vancouver
Murad CA, Bellinello MM, Silva AJ, Souza GFM de, Caminada Netto A, Melani AH de A, Michalski MADC. Improving the reliability of the critical asset maintenance plan using entropy and MAUT approaches: a hydropower plant case study [Internet]. Proceedings. 2021 ;[citado 2026 mar. 15 ] Available from: https://www.rpsonline.com.sg/proceedings/9789811820168/html/186.xml - PAL-VMEA: a novel method for enhancing decision-making consistency in maintenance management
- Generalized stochastic Petri nets for planning and optimizing maintenance logistics of small hydroelectric power plants
- Defining operator driven reliability inspection routes through reliability, risk analysis and quality control techniques
- Paraconsistent Annotated Logic (PAL) applied in the decision-making process of maintenance policy for Kaplan turbine
- Estimation of operational and maintenance tasks influence on equipment availability through Petri net modeling
- Maintenance management optimization to improve system availability based on stochastic block diagram
- OMCTA: a novel knowledge-bases technique to evaluate the influence of O&M actions on maintenance management
- Updating a hydro power plant monitoring system through failure modes and symptoms analysis
- A framework for selection of Random inspection routes for power plants
- Petri Net based reliability analysis of thermoelectric plant cooling tower system: effect of operational strategies on system realiability and availability
Informações sobre a disponibilidade de versões do artigo em acesso aberto coletadas automaticamente via oaDOI API (Unpaywall).
Download do texto completo
| Tipo | Nome | Link | |
|---|---|---|---|
| 3244582.pdf | Direct link |
How to cite
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
