Filtros : "RONCONI, DEBORA PRETTI" Limpar

Filtros



Refine with date range


  • Source: International Transactions in Operational Research. Unidades: IME, EP

    Subjects: PROGRAMAÇÃO LINEAR, HEURÍSTICA, ECONOMIA DE ENERGIA, CONSUMO DE ENERGIA ELÉTRICA

    Versão PublicadaAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      BIRGIN, Ernesto Julian Goldberg e RIVEAUX, José Angel e RONCONI, Débora Pretti. Energy-aware flexible job shop scheduling problem with nonlinear routes and position-based learning effect. International Transactions in Operational Research, v. 33, n. 2, p. 860-891, 2026Tradução . . Disponível em: https://doi.org/10.1111/itor.70057. Acesso em: 26 nov. 2025.
    • APA

      Birgin, E. J. G., Riveaux, J. A., & Ronconi, D. P. (2026). Energy-aware flexible job shop scheduling problem with nonlinear routes and position-based learning effect. International Transactions in Operational Research, 33( 2), 860-891. doi:10.1111/itor.70057
    • NLM

      Birgin EJG, Riveaux JA, Ronconi DP. Energy-aware flexible job shop scheduling problem with nonlinear routes and position-based learning effect [Internet]. International Transactions in Operational Research. 2026 ; 33( 2): 860-891.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1111/itor.70057
    • Vancouver

      Birgin EJG, Riveaux JA, Ronconi DP. Energy-aware flexible job shop scheduling problem with nonlinear routes and position-based learning effect [Internet]. International Transactions in Operational Research. 2026 ; 33( 2): 860-891.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1111/itor.70057
    GDS 12. Responsible consumption and production
  • Source: Anais. Conference titles: Simpósio Brasileiro de Pesquisa Operacional - SBPO. Unidades: IME, EP

    Subjects: HEURÍSTICA, ALGORITMOS DE SCHEDULING, PROGRAMAÇÃO MATEMÁTICA, OTIMIZAÇÃO COMBINATÓRIA

    Versão PublicadaAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ARAUJO, Kennedy Anderson Guimarães de e BIRGIN, Ernesto Julian Goldberg e RONCONI, Débora Pretti. Heurísticas construtivas e busca local para o problema job shop flexível com flexibilidade de sequência e efeito de aprendizado. 2024, Anais.. Rio de Janeiro: Sociedade Brasileira de Pesquisa Operacional, 2024. Disponível em: https://doi.org/10.59254/sbpo-2024-193581. Acesso em: 26 nov. 2025.
    • APA

      Araujo, K. A. G. de, Birgin, E. J. G., & Ronconi, D. P. (2024). Heurísticas construtivas e busca local para o problema job shop flexível com flexibilidade de sequência e efeito de aprendizado. In Anais. Rio de Janeiro: Sociedade Brasileira de Pesquisa Operacional. doi:10.59254/sbpo-2024-193581
    • NLM

      Araujo KAG de, Birgin EJG, Ronconi DP. Heurísticas construtivas e busca local para o problema job shop flexível com flexibilidade de sequência e efeito de aprendizado [Internet]. Anais. 2024 ;[citado 2025 nov. 26 ] Available from: https://doi.org/10.59254/sbpo-2024-193581
    • Vancouver

      Araujo KAG de, Birgin EJG, Ronconi DP. Heurísticas construtivas e busca local para o problema job shop flexível com flexibilidade de sequência e efeito de aprendizado [Internet]. Anais. 2024 ;[citado 2025 nov. 26 ] Available from: https://doi.org/10.59254/sbpo-2024-193581
  • Source: Expert Systems with Applications. Unidades: IME, EP

    Subjects: PESQUISA OPERACIONAL, TEORIA DE SISTEMAS E CONTROLE, PROGRAMAÇÃO LINEAR

    Versão PublicadaAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      BIRGIN, Ernesto Julian Goldberg e ROMÃO, Oberlan Christo e RONCONI, Débora Pretti. A forward-looking matheuristic approach for the multi-period two-dimensional non-guillotine cutting stock problem with usable leftovers. Expert Systems with Applications, v. 223, p. 26 on-line, 2023Tradução . . Disponível em: https://doi.org/10.1016/j.eswa.2023.119866. Acesso em: 26 nov. 2025.
    • APA

      Birgin, E. J. G., Romão, O. C., & Ronconi, D. P. (2023). A forward-looking matheuristic approach for the multi-period two-dimensional non-guillotine cutting stock problem with usable leftovers. Expert Systems with Applications, 223, 26 on-line. doi:10.1016/j.eswa.2023.119866
    • NLM

      Birgin EJG, Romão OC, Ronconi DP. A forward-looking matheuristic approach for the multi-period two-dimensional non-guillotine cutting stock problem with usable leftovers [Internet]. Expert Systems with Applications. 2023 ; 223 26 on-line.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1016/j.eswa.2023.119866
    • Vancouver

      Birgin EJG, Romão OC, Ronconi DP. A forward-looking matheuristic approach for the multi-period two-dimensional non-guillotine cutting stock problem with usable leftovers [Internet]. Expert Systems with Applications. 2023 ; 223 26 on-line.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1016/j.eswa.2023.119866
  • Source: Proceedings. Conference titles: International Conference of the International Federation of Operational Research Societies - IFORS 2023. Unidade: EP

    Subjects: ALGORITMOS, OTIMIZAÇÃO COMBINATÓRIA

    Versão PublicadaHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      RONCONI, Débora Pretti et al. An adaptive multi-objective biased random-key genetic algorithm to schedule technicians and tasks. 2023, Anais.. Fribourg: EURO, 2023. Disponível em: https://repositorio.usp.br/directbitstream/bd87f003-d947-4b95-9932-3681018c4d00/An_adaptive_multi-objective_biased_random-key_genetic_algorithm_to_schedule_technicians_and_tasks.pdf. Acesso em: 26 nov. 2025.
    • APA

      Ronconi, D. P., Damm, R. de B., Chaves, A. A., & Merino, J. A. R. M. (2023). An adaptive multi-objective biased random-key genetic algorithm to schedule technicians and tasks. In Proceedings. Fribourg: EURO. Recuperado de https://repositorio.usp.br/directbitstream/bd87f003-d947-4b95-9932-3681018c4d00/An_adaptive_multi-objective_biased_random-key_genetic_algorithm_to_schedule_technicians_and_tasks.pdf
    • NLM

      Ronconi DP, Damm R de B, Chaves AA, Merino JARM. An adaptive multi-objective biased random-key genetic algorithm to schedule technicians and tasks [Internet]. Proceedings. 2023 ;[citado 2025 nov. 26 ] Available from: https://repositorio.usp.br/directbitstream/bd87f003-d947-4b95-9932-3681018c4d00/An_adaptive_multi-objective_biased_random-key_genetic_algorithm_to_schedule_technicians_and_tasks.pdf
    • Vancouver

      Ronconi DP, Damm R de B, Chaves AA, Merino JARM. An adaptive multi-objective biased random-key genetic algorithm to schedule technicians and tasks [Internet]. Proceedings. 2023 ;[citado 2025 nov. 26 ] Available from: https://repositorio.usp.br/directbitstream/bd87f003-d947-4b95-9932-3681018c4d00/An_adaptive_multi-objective_biased_random-key_genetic_algorithm_to_schedule_technicians_and_tasks.pdf
  • Source: Operations Research Forum. Unidades: IME, EP

    Subjects: PROGRAMAÇÃO LINEAR, CONTROLE DA PRODUÇÃO, PLANEJAMENTO DA PRODUÇÃO

    Versão PublicadaAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ARAUJO, Kennedy Anderson Guimarães de et al. Relax-and-fix heuristics applied to a real-world lot sizing and scheduling problem in the personal care consumer goods industry. Operations Research Forum, v. 4, n. artigo 47, p. 1-30, 2023Tradução . . Disponível em: https://doi.org/10.1007/s43069-023-00230-7. Acesso em: 26 nov. 2025.
    • APA

      Araujo, K. A. G. de, Birgin, E. J. G., Kawamura, M. S., & Ronconi, D. P. (2023). Relax-and-fix heuristics applied to a real-world lot sizing and scheduling problem in the personal care consumer goods industry. Operations Research Forum, 4( artigo 47), 1-30. doi:10.1007/s43069-023-00230-7
    • NLM

      Araujo KAG de, Birgin EJG, Kawamura MS, Ronconi DP. Relax-and-fix heuristics applied to a real-world lot sizing and scheduling problem in the personal care consumer goods industry [Internet]. Operations Research Forum. 2023 ; 4( artigo 47): 1-30.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1007/s43069-023-00230-7
    • Vancouver

      Araujo KAG de, Birgin EJG, Kawamura MS, Ronconi DP. Relax-and-fix heuristics applied to a real-world lot sizing and scheduling problem in the personal care consumer goods industry [Internet]. Operations Research Forum. 2023 ; 4( artigo 47): 1-30.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1007/s43069-023-00230-7
  • Source: Anais. Conference titles: Simpósio Brasileiro de Pesquisa Operacional - SBPO. Unidades: IME, EP

    Subjects: PROGRAMAÇÃO LINEAR, OTIMIZAÇÃO COMBINATÓRIA, PROGRAMAÇÃO MATEMÁTICA

    Versão PublicadaAcesso à fonteHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ARAUJO, Kennedy Anderson Guimarães de e BIRGIN, Ernesto Julian Goldberg e RONCONI, Débora Pretti. A constraint programming model for the flexible job shop scheduling problem with sequencing flexibility and position based learning effects. 2022, Anais.. Rio de Janeiro: SOBRAPO, 2022. Disponível em: https://proceedings.science/sbpo/sbpo-2022/trabalhos/a-constraint-programming-model-for-the-flexible-job-shop-scheduling-problem-with?lang=pt-br. Acesso em: 26 nov. 2025.
    • APA

      Araujo, K. A. G. de, Birgin, E. J. G., & Ronconi, D. P. (2022). A constraint programming model for the flexible job shop scheduling problem with sequencing flexibility and position based learning effects. In Anais. Rio de Janeiro: SOBRAPO. Recuperado de https://proceedings.science/sbpo/sbpo-2022/trabalhos/a-constraint-programming-model-for-the-flexible-job-shop-scheduling-problem-with?lang=pt-br
    • NLM

      Araujo KAG de, Birgin EJG, Ronconi DP. A constraint programming model for the flexible job shop scheduling problem with sequencing flexibility and position based learning effects [Internet]. Anais. 2022 ;[citado 2025 nov. 26 ] Available from: https://proceedings.science/sbpo/sbpo-2022/trabalhos/a-constraint-programming-model-for-the-flexible-job-shop-scheduling-problem-with?lang=pt-br
    • Vancouver

      Araujo KAG de, Birgin EJG, Ronconi DP. A constraint programming model for the flexible job shop scheduling problem with sequencing flexibility and position based learning effects [Internet]. Anais. 2022 ;[citado 2025 nov. 26 ] Available from: https://proceedings.science/sbpo/sbpo-2022/trabalhos/a-constraint-programming-model-for-the-flexible-job-shop-scheduling-problem-with?lang=pt-br
  • Source: European Journal of Operational Research. Unidades: IME, EP

    Subjects: PROGRAMAÇÃO MATEMÁTICA, SCHEDULING

    Versão AceitaAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      LUNARDI, Willian Tessaro et al. Metaheuristics for the online printing shop scheduling problem. European Journal of Operational Research, v. 293, n. 2, p. 419-441, 2021Tradução . . Disponível em: https://doi.org/10.1016/j.ejor.2020.12.021. Acesso em: 26 nov. 2025.
    • APA

      Lunardi, W. T., Birgin, E. J. G., Ronconi, D. P., & Voos, H. (2021). Metaheuristics for the online printing shop scheduling problem. European Journal of Operational Research, 293( 2), 419-441. doi:10.1016/j.ejor.2020.12.021
    • NLM

      Lunardi WT, Birgin EJG, Ronconi DP, Voos H. Metaheuristics for the online printing shop scheduling problem [Internet]. European Journal of Operational Research. 2021 ; 293( 2): 419-441.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1016/j.ejor.2020.12.021
    • Vancouver

      Lunardi WT, Birgin EJG, Ronconi DP, Voos H. Metaheuristics for the online printing shop scheduling problem [Internet]. European Journal of Operational Research. 2021 ; 293( 2): 419-441.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1016/j.ejor.2020.12.021
  • Source: Computers & Operations Research. Unidades: IME, EP

    Subjects: ALGORITMOS DE SCHEDULING, HEURÍSTICA, PROGRAMAÇÃO DA PRODUÇÃO

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      BIRGIN, Ernesto Julian Goldberg e JESUS FILHO, José Eurípedes Ferreira de e RONCONI, Débora Pretti. A filtered beam search method for the m-machine permutation flowshop scheduling problem minimizing the earliness and tardiness penalties and the waiting time of the jobs. Computers & Operations Research, v. 114, n. 1-14, p. 104824, 2020Tradução . . Disponível em: https://doi.org/10.1016/j.cor.2019.104824. Acesso em: 26 nov. 2025.
    • APA

      Birgin, E. J. G., Jesus Filho, J. E. F. de, & Ronconi, D. P. (2020). A filtered beam search method for the m-machine permutation flowshop scheduling problem minimizing the earliness and tardiness penalties and the waiting time of the jobs. Computers & Operations Research, 114( 1-14), 104824. doi:10.1016/j.cor.2019.104824
    • NLM

      Birgin EJG, Jesus Filho JEF de, Ronconi DP. A filtered beam search method for the m-machine permutation flowshop scheduling problem minimizing the earliness and tardiness penalties and the waiting time of the jobs [Internet]. Computers & Operations Research. 2020 ; 114( 1-14): 104824.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1016/j.cor.2019.104824
    • Vancouver

      Birgin EJG, Jesus Filho JEF de, Ronconi DP. A filtered beam search method for the m-machine permutation flowshop scheduling problem minimizing the earliness and tardiness penalties and the waiting time of the jobs [Internet]. Computers & Operations Research. 2020 ; 114( 1-14): 104824.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1016/j.cor.2019.104824
  • Source: International Transactions in Operational Research. Unidades: IME, EP

    Assunto: PROGRAMAÇÃO LINEAR

    Versão AceitaAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      BIRGIN, Ernesto Julian Goldberg e ROMÃO, Oberlan Christo e RONCONI, Débora Pretti. The multiperiod two-dimensional non-guillotine cutting stock problem with usable leftovers. International Transactions in Operational Research, v. 27, n. 3, p. 1392-1418, 2020Tradução . . Disponível em: https://doi.org/10.1111/itor.12648. Acesso em: 26 nov. 2025.
    • APA

      Birgin, E. J. G., Romão, O. C., & Ronconi, D. P. (2020). The multiperiod two-dimensional non-guillotine cutting stock problem with usable leftovers. International Transactions in Operational Research, 27( 3), 1392-1418. doi:10.1111/itor.12648
    • NLM

      Birgin EJG, Romão OC, Ronconi DP. The multiperiod two-dimensional non-guillotine cutting stock problem with usable leftovers [Internet]. International Transactions in Operational Research. 2020 ; 27( 3): 1392-1418.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1111/itor.12648
    • Vancouver

      Birgin EJG, Romão OC, Ronconi DP. The multiperiod two-dimensional non-guillotine cutting stock problem with usable leftovers [Internet]. International Transactions in Operational Research. 2020 ; 27( 3): 1392-1418.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1111/itor.12648
  • Source: Computers & Operations Research. Unidades: IME, EP

    Subjects: ALGORITMOS DE SCHEDULING, HEURÍSTICA

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      LUNARDI, Willian Tessaro et al. Mixed Integer linear programming and constraint programming models for the online printing shop scheduling problem. Computers & Operations Research, v. 123, p. 1-20, 2020Tradução . . Disponível em: https://doi.org/10.1016/j.cor.2020.105020. Acesso em: 26 nov. 2025.
    • APA

      Lunardi, W. T., Birgin, E. J. G., Laborie, P., Ronconi, D. P., & Voos, H. (2020). Mixed Integer linear programming and constraint programming models for the online printing shop scheduling problem. Computers & Operations Research, 123, 1-20. doi:10.1016/j.cor.2020.105020
    • NLM

      Lunardi WT, Birgin EJG, Laborie P, Ronconi DP, Voos H. Mixed Integer linear programming and constraint programming models for the online printing shop scheduling problem [Internet]. Computers & Operations Research. 2020 ; 123 1-20.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1016/j.cor.2020.105020
    • Vancouver

      Lunardi WT, Birgin EJG, Laborie P, Ronconi DP, Voos H. Mixed Integer linear programming and constraint programming models for the online printing shop scheduling problem [Internet]. Computers & Operations Research. 2020 ; 123 1-20.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1016/j.cor.2020.105020
  • Source: Anais. Conference titles: Simpósio Brasileiro de Pesquisa Operacional. Unidades: IME, EP

    Subjects: SCHEDULING, OTIMIZAÇÃO COMBINATÓRIA

    PrivadoHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      BIRGIN, Ernesto Julian Goldberg e JESUS FILHO, José Eurípedes Ferreira de e RONCONI, Débora Pretti. Um algoritmo do tipo list scheduling para o problema flowshop minimizando o adiantamento e atraso das tarefas. 2019, Anais.. Rio de Janeiro: SOBRAPO, 2019. Disponível em: https://repositorio.usp.br/directbitstream/fcef5738-1f07-4f21-a24f-888d2242f659/3026922.pdf. Acesso em: 26 nov. 2025.
    • APA

      Birgin, E. J. G., Jesus Filho, J. E. F. de, & Ronconi, D. P. (2019). Um algoritmo do tipo list scheduling para o problema flowshop minimizando o adiantamento e atraso das tarefas. In Anais. Rio de Janeiro: SOBRAPO. Recuperado de https://repositorio.usp.br/directbitstream/fcef5738-1f07-4f21-a24f-888d2242f659/3026922.pdf
    • NLM

      Birgin EJG, Jesus Filho JEF de, Ronconi DP. Um algoritmo do tipo list scheduling para o problema flowshop minimizando o adiantamento e atraso das tarefas [Internet]. Anais. 2019 ;[citado 2025 nov. 26 ] Available from: https://repositorio.usp.br/directbitstream/fcef5738-1f07-4f21-a24f-888d2242f659/3026922.pdf
    • Vancouver

      Birgin EJG, Jesus Filho JEF de, Ronconi DP. Um algoritmo do tipo list scheduling para o problema flowshop minimizando o adiantamento e atraso das tarefas [Internet]. Anais. 2019 ;[citado 2025 nov. 26 ] Available from: https://repositorio.usp.br/directbitstream/fcef5738-1f07-4f21-a24f-888d2242f659/3026922.pdf
  • Source: Computers & Operations Research. Unidade: EP

    Subjects: ALGORITMOS GENÉTICOS, HEURÍSTICA, OTIMIZAÇÃO COMBINATÓRIA

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      DAMM, Ricardo de Brito e RESENDE, Mauricio G. C e RONCONI, Débora Pretti. A biased random key genetic algorithm for the field technician scheduling problem. Computers & Operations Research, v. No 2016, p. 49-63, 2016Tradução . . Disponível em: https://doi.org/10.1016/j.cor.2016.05.003. Acesso em: 26 nov. 2025.
    • APA

      Damm, R. de B., Resende, M. G. C., & Ronconi, D. P. (2016). A biased random key genetic algorithm for the field technician scheduling problem. Computers & Operations Research, No 2016, 49-63. doi:10.1016/j.cor.2016.05.003
    • NLM

      Damm R de B, Resende MGC, Ronconi DP. A biased random key genetic algorithm for the field technician scheduling problem [Internet]. Computers & Operations Research. 2016 ; No 2016 49-63.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1016/j.cor.2016.05.003
    • Vancouver

      Damm R de B, Resende MGC, Ronconi DP. A biased random key genetic algorithm for the field technician scheduling problem [Internet]. Computers & Operations Research. 2016 ; No 2016 49-63.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1016/j.cor.2016.05.003
  • Source: Production. Unidade: EP

    Subjects: PROGRAMAÇÃO DA PRODUÇÃO, PROGRAMAÇÃO MATEMÁTICA, PROGRAMAÇÃO LINEAR

    Versão PublicadaAcesso à fonteAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      GOMEZ MORALES, Sergio Wilson e RONCONI, Débora Pretti. Formulações matemáticas e estratégias de resolução para o problema job shop clássico. Production, v. 26, n. 3, p. 614-625, 2016Tradução . . Disponível em: https://doi.org/10.1590/0103-6513.058512. Acesso em: 26 nov. 2025.
    • APA

      Gomez Morales, S. W., & Ronconi, D. P. (2016). Formulações matemáticas e estratégias de resolução para o problema job shop clássico. Production, 26( 3), 614-625. doi:10.1590/0103-6513.058512
    • NLM

      Gomez Morales SW, Ronconi DP. Formulações matemáticas e estratégias de resolução para o problema job shop clássico [Internet]. Production. 2016 ; 26( 3): 614-625.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1590/0103-6513.058512
    • Vancouver

      Gomez Morales SW, Ronconi DP. Formulações matemáticas e estratégias de resolução para o problema job shop clássico [Internet]. Production. 2016 ; 26( 3): 614-625.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1590/0103-6513.058512
  • Source: Production. Unidade: EP

    Subjects: HEURÍSTICA, PROGRAMAÇÃO MATEMÁTICA, PROGRAMAÇÃO DA PRODUÇÃO

    Versão PublicadaAcesso à fonteAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MELO, Everton Luiz de. Regras de prioridade eficientes que exploram características do Job Shop Flexível para a minimização do atraso total. Production, v. 25, n. ja/mar. 2015, p. 79-91, 2015Tradução . . Disponível em: https://doi.org/10.1590/s0103-65132014005000016. Acesso em: 26 nov. 2025.
    • APA

      Melo, E. L. de. (2015). Regras de prioridade eficientes que exploram características do Job Shop Flexível para a minimização do atraso total. Production, 25( ja/mar. 2015), 79-91. doi:10.1590/s0103-65132014005000016
    • NLM

      Melo EL de. Regras de prioridade eficientes que exploram características do Job Shop Flexível para a minimização do atraso total [Internet]. Production. 2015 ; 25( ja/mar. 2015): 79-91.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1590/s0103-65132014005000016
    • Vancouver

      Melo EL de. Regras de prioridade eficientes que exploram características do Job Shop Flexível para a minimização do atraso total [Internet]. Production. 2015 ; 25( ja/mar. 2015): 79-91.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1590/s0103-65132014005000016
  • Source: European Journal of Operational Research. Unidades: IME, EP

    Subjects: ALGORITMOS DE SCHEDULING, PESQUISA OPERACIONAL, CIÊNCIA DA COMPUTAÇÃO

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      BIRGIN, Ernesto Julian Goldberg e JESUS FILHO, José Eurípedes Ferreira de e RONCONI, Débora Pretti. List scheduling and beam search methods for the flexible job shop scheduling problem with sequencing flexibility. European Journal of Operational Research, v. 247, n. 2, p. 421-440, 2015Tradução . . Disponível em: https://doi.org/10.1016/j.ejor.2015.06.023. Acesso em: 26 nov. 2025.
    • APA

      Birgin, E. J. G., Jesus Filho, J. E. F. de, & Ronconi, D. P. (2015). List scheduling and beam search methods for the flexible job shop scheduling problem with sequencing flexibility. European Journal of Operational Research, 247( 2), 421-440. doi:10.1016/j.ejor.2015.06.023
    • NLM

      Birgin EJG, Jesus Filho JEF de, Ronconi DP. List scheduling and beam search methods for the flexible job shop scheduling problem with sequencing flexibility [Internet]. European Journal of Operational Research. 2015 ; 247( 2): 421-440.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1016/j.ejor.2015.06.023
    • Vancouver

      Birgin EJG, Jesus Filho JEF de, Ronconi DP. List scheduling and beam search methods for the flexible job shop scheduling problem with sequencing flexibility [Internet]. European Journal of Operational Research. 2015 ; 247( 2): 421-440.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1016/j.ejor.2015.06.023
  • Source: Expert Systems with Applications. Unidades: EP, IME

    Subjects: HEURÍSTICA, OTIMIZAÇÃO COMBINATÓRIA, COMBINATÓRIA

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      SAKURABA, Celso Satoshi et al. Metaheuristics for large-scale instances of the linear ordering problem. Expert Systems with Applications, v. 42, n. 9, p. 4432-4442, 2015Tradução . . Disponível em: https://doi.org/10.1016/j.eswa.2015.01.053. Acesso em: 26 nov. 2025.
    • APA

      Sakuraba, C. S., Ronconi, D. P., Birgin, E. J. G., & Yagiura, M. (2015). Metaheuristics for large-scale instances of the linear ordering problem. Expert Systems with Applications, 42( 9), 4432-4442. doi:10.1016/j.eswa.2015.01.053
    • NLM

      Sakuraba CS, Ronconi DP, Birgin EJG, Yagiura M. Metaheuristics for large-scale instances of the linear ordering problem [Internet]. Expert Systems with Applications. 2015 ; 42( 9): 4432-4442.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1016/j.eswa.2015.01.053
    • Vancouver

      Sakuraba CS, Ronconi DP, Birgin EJG, Yagiura M. Metaheuristics for large-scale instances of the linear ordering problem [Internet]. Expert Systems with Applications. 2015 ; 42( 9): 4432-4442.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1016/j.eswa.2015.01.053
  • Source: International Journal of Production Economics. Unidade: EP

    Subjects: PROGRAMAÇÃO ESTOCÁSTICA, HEURÍSTICA

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      LEMOS, Rafael de Freitas e RONCONI, Débora Pretti. Heuristics for the stochastic single-machine problem with E/T costs. International Journal of Production Economics, v. 168, p. 131-142, 2015Tradução . . Disponível em: https://doi.org/10.1016/j.ijpe.2015.06.014. Acesso em: 26 nov. 2025.
    • APA

      Lemos, R. de F., & Ronconi, D. P. (2015). Heuristics for the stochastic single-machine problem with E/T costs. International Journal of Production Economics, 168, 131-142. doi:10.1016/j.ijpe.2015.06.014
    • NLM

      Lemos R de F, Ronconi DP. Heuristics for the stochastic single-machine problem with E/T costs [Internet]. International Journal of Production Economics. 2015 ; 168 131-142.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1016/j.ijpe.2015.06.014
    • Vancouver

      Lemos R de F, Ronconi DP. Heuristics for the stochastic single-machine problem with E/T costs [Internet]. International Journal of Production Economics. 2015 ; 168 131-142.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1016/j.ijpe.2015.06.014
  • Source: Journal of the Operational Research Society. Unidades: IME, EP

    Subjects: PROGRAMAÇÃO MATEMÁTICA, OTIMIZAÇÃO MATEMÁTICA, PLANEJAMENTO DA PRODUÇÃO, CONTROLE DA PRODUÇÃO

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ANDRADE, Ricardo et al. MIP models for two-dimensional non-guillotine cutting problems with usable leftovers. Journal of the Operational Research Society, v. 65, n. 11, p. 1649-1663, 2014Tradução . . Disponível em: https://doi.org/10.1057/jors.2013.108. Acesso em: 26 nov. 2025.
    • APA

      Andrade, R., Birgin, E. J. G., Morabito, R., & Ronconi, D. P. (2014). MIP models for two-dimensional non-guillotine cutting problems with usable leftovers. Journal of the Operational Research Society, 65( 11), 1649-1663. doi:10.1057/jors.2013.108
    • NLM

      Andrade R, Birgin EJG, Morabito R, Ronconi DP. MIP models for two-dimensional non-guillotine cutting problems with usable leftovers [Internet]. Journal of the Operational Research Society. 2014 ; 65( 11): 1649-1663.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1057/jors.2013.108
    • Vancouver

      Andrade R, Birgin EJG, Morabito R, Ronconi DP. MIP models for two-dimensional non-guillotine cutting problems with usable leftovers [Internet]. Journal of the Operational Research Society. 2014 ; 65( 11): 1649-1663.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1057/jors.2013.108
  • Source: Optimization Letters. Unidades: IME, EP

    Subjects: SCHEDULING, HEURÍSTICA, PROGRAMAÇÃO DA PRODUÇÃO

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      BIRGIN, Ernesto Julian Goldberg et al. A MILP model for an extended version of the Flexible Job Shop Problem. Optimization Letters, v. 8, n. 4, p. 1417\20131431, 2014Tradução . . Disponível em: https://doi.org/10.1007/s11590-013-0669-7. Acesso em: 26 nov. 2025.
    • APA

      Birgin, E. J. G., Feofiloff, P., Fernandes, C. G., Melo, E. L. de, Oshiro, M. T. I., & Ronconi, D. P. (2014). A MILP model for an extended version of the Flexible Job Shop Problem. Optimization Letters, 8( 4), 1417\20131431. doi:10.1007/s11590-013-0669-7
    • NLM

      Birgin EJG, Feofiloff P, Fernandes CG, Melo EL de, Oshiro MTI, Ronconi DP. A MILP model for an extended version of the Flexible Job Shop Problem [Internet]. Optimization Letters. 2014 ; 8( 4): 1417\20131431.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1007/s11590-013-0669-7
    • Vancouver

      Birgin EJG, Feofiloff P, Fernandes CG, Melo EL de, Oshiro MTI, Ronconi DP. A MILP model for an extended version of the Flexible Job Shop Problem [Internet]. Optimization Letters. 2014 ; 8( 4): 1417\20131431.[citado 2025 nov. 26 ] Available from: https://doi.org/10.1007/s11590-013-0669-7
  • Source: Proceedings. Challenges for sustainable operations. Conference titles: International Conference on Production Research - ICPR. Unidade: EP

    Subjects: HEURÍSTICA, PESQUISA OPERACIONAL

    PrivadoHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      LEMOS, Rafael de Freitas e RONCONI, Débora Pretti. A heuristic for the stochastic single-machine problem with E/T costs. 2013, Anais.. S.l: ABEPRO, 2013. Disponível em: https://repositorio.usp.br/directbitstream/f408b741-c132-48f0-94b8-b57d3288b4e7/Ronconi-2013-heuristic.pdf. Acesso em: 26 nov. 2025.
    • APA

      Lemos, R. de F., & Ronconi, D. P. (2013). A heuristic for the stochastic single-machine problem with E/T costs. In Proceedings. Challenges for sustainable operations. S.l: ABEPRO. Recuperado de https://repositorio.usp.br/directbitstream/f408b741-c132-48f0-94b8-b57d3288b4e7/Ronconi-2013-heuristic.pdf
    • NLM

      Lemos R de F, Ronconi DP. A heuristic for the stochastic single-machine problem with E/T costs [Internet]. Proceedings. Challenges for sustainable operations. 2013 ;[citado 2025 nov. 26 ] Available from: https://repositorio.usp.br/directbitstream/f408b741-c132-48f0-94b8-b57d3288b4e7/Ronconi-2013-heuristic.pdf
    • Vancouver

      Lemos R de F, Ronconi DP. A heuristic for the stochastic single-machine problem with E/T costs [Internet]. Proceedings. Challenges for sustainable operations. 2013 ;[citado 2025 nov. 26 ] Available from: https://repositorio.usp.br/directbitstream/f408b741-c132-48f0-94b8-b57d3288b4e7/Ronconi-2013-heuristic.pdf

Digital Library of Intellectual Production of Universidade de São Paulo     2012 - 2025