Filtros : "Springer" "ENGENHARIA DE PRODUCAO" Limpar

Filtros



Refine with date range


  • Source: Production Engineering: research and development. Unidade: EESC

    Subjects: ALGORITMOS GENÉTICOS, SEQUENCIAÇÃO DA PRODUÇÃO

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      PINTO, Anderson Rogério Faia e NAGANO, Marcelo Seido. An approach for the solution to order batching and sequencing in picking systems. Production Engineering: research and development, v. 13, p. 325-341, 2019Tradução . . Disponível em: https://doi.org/10.1007/s11740-019-00904-4. Acesso em: 04 nov. 2024.
    • APA

      Pinto, A. R. F., & Nagano, M. S. (2019). An approach for the solution to order batching and sequencing in picking systems. Production Engineering: research and development, 13, 325-341. doi:10.1007/s11740-019-00904-4
    • NLM

      Pinto ARF, Nagano MS. An approach for the solution to order batching and sequencing in picking systems [Internet]. Production Engineering: research and development. 2019 ; 13 325-341.[citado 2024 nov. 04 ] Available from: https://doi.org/10.1007/s11740-019-00904-4
    • Vancouver

      Pinto ARF, Nagano MS. An approach for the solution to order batching and sequencing in picking systems [Internet]. Production Engineering: research and development. 2019 ; 13 325-341.[citado 2024 nov. 04 ] Available from: https://doi.org/10.1007/s11740-019-00904-4
  • Source: Journal of the Brazilian Society of Mechanical Sciences and Engineering. Unidade: EESC

    Subjects: PROGRAMAÇÃO DA PRODUÇÃO, ALGORITMOS DE SCHEDULING, SISTEMAS DE PRODUÇÃO

    Versão PublicadaAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MOCCELLIN, João Vitor et al. Heuristic algorithms for scheduling hybrid flow shops with machine blocking and setup times. Journal of the Brazilian Society of Mechanical Sciences and Engineering, v. 40, n. 1, 2018Tradução . . Disponível em: https://doi.org/10.1007/s40430-018-0980-4. Acesso em: 04 nov. 2024.
    • APA

      Moccellin, J. V., Nagano, M. S., Pitombeira Neto, A. R., & Prata, B. de A. (2018). Heuristic algorithms for scheduling hybrid flow shops with machine blocking and setup times. Journal of the Brazilian Society of Mechanical Sciences and Engineering, 40( 1). doi:10.1007/s40430-018-0980-4
    • NLM

      Moccellin JV, Nagano MS, Pitombeira Neto AR, Prata B de A. Heuristic algorithms for scheduling hybrid flow shops with machine blocking and setup times [Internet]. Journal of the Brazilian Society of Mechanical Sciences and Engineering. 2018 ; 40( 1):[citado 2024 nov. 04 ] Available from: https://doi.org/10.1007/s40430-018-0980-4
    • Vancouver

      Moccellin JV, Nagano MS, Pitombeira Neto AR, Prata B de A. Heuristic algorithms for scheduling hybrid flow shops with machine blocking and setup times [Internet]. Journal of the Brazilian Society of Mechanical Sciences and Engineering. 2018 ; 40( 1):[citado 2024 nov. 04 ] Available from: https://doi.org/10.1007/s40430-018-0980-4
  • Source: Production Engineering: research and development. Unidade: EESC

    Subjects: SCHEDULING, HEURÍSTICA, PROGRAMAÇÃO DA PRODUÇÃO

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      NAGANO, Marcelo Seido e ROSSI, Fernando Luis e TOMAZELLA, Caio Paziani. A new efcient heuristic method for minimizing the total tardiness in a no-idle permutation fow shop. Production Engineering: research and development, n. 11, p. 523-529, 2017Tradução . . Disponível em: https://doi.org/10.1007/s11740-017-0747-2. Acesso em: 04 nov. 2024.
    • APA

      Nagano, M. S., Rossi, F. L., & Tomazella, C. P. (2017). A new efcient heuristic method for minimizing the total tardiness in a no-idle permutation fow shop. Production Engineering: research and development, ( 11), 523-529. doi:10.1007/s11740-017-0747-2
    • NLM

      Nagano MS, Rossi FL, Tomazella CP. A new efcient heuristic method for minimizing the total tardiness in a no-idle permutation fow shop [Internet]. Production Engineering: research and development. 2017 ;( 11): 523-529.[citado 2024 nov. 04 ] Available from: https://doi.org/10.1007/s11740-017-0747-2
    • Vancouver

      Nagano MS, Rossi FL, Tomazella CP. A new efcient heuristic method for minimizing the total tardiness in a no-idle permutation fow shop [Internet]. Production Engineering: research and development. 2017 ;( 11): 523-529.[citado 2024 nov. 04 ] Available from: https://doi.org/10.1007/s11740-017-0747-2

Digital Library of Intellectual Production of Universidade de São Paulo     2012 - 2024