Filtros : "2018" "IAU" "Holanda" Limpar

Filtros



Refine with date range


  • Source: Fascism (Journal of Comparative Fascist Studies). Unidade: IAU

    Subjects: ARQUITETURA, FASCISMO, DITADURA

    Acesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      TRAJANO FILHO, Francisco Sales. The many faces of a para-fascist culture: architecture, politics and power in Vargas’ Regime (1930–1945). Fascism (Journal of Comparative Fascist Studies), v. 7, p. 175-212, 2018Tradução . . Disponível em: https://doi.org/10.1163/22116257-00702003. Acesso em: 09 ago. 2024.
    • APA

      Trajano Filho, F. S. (2018). The many faces of a para-fascist culture: architecture, politics and power in Vargas’ Regime (1930–1945). Fascism (Journal of Comparative Fascist Studies), 7, 175-212. doi:10.1163/22116257-00702003
    • NLM

      Trajano Filho FS. The many faces of a para-fascist culture: architecture, politics and power in Vargas’ Regime (1930–1945) [Internet]. Fascism (Journal of Comparative Fascist Studies). 2018 ; 7 175-212.[citado 2024 ago. 09 ] Available from: https://doi.org/10.1163/22116257-00702003
    • Vancouver

      Trajano Filho FS. The many faces of a para-fascist culture: architecture, politics and power in Vargas’ Regime (1930–1945) [Internet]. Fascism (Journal of Comparative Fascist Studies). 2018 ; 7 175-212.[citado 2024 ago. 09 ] Available from: https://doi.org/10.1163/22116257-00702003
  • Source: Automation in Construction. Unidade: IAU

    Subjects: CONSTRUÇÃO CIVIL, MODELOS, SIMULAÇÃO

    Acesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      BUENO, Cristiane e FABRICIO, Márcio Minto. Comparative analysis between a complete LCA study and results from a BIM-LCA plug-in. Automation in Construction, v. 90, p. 188-200, 2018Tradução . . Disponível em: https://doi.org/10.1016/j.autcon.2018.02.028. Acesso em: 09 ago. 2024.
    • APA

      Bueno, C., & Fabricio, M. M. (2018). Comparative analysis between a complete LCA study and results from a BIM-LCA plug-in. Automation in Construction, 90, 188-200. doi:10.1016/j.autcon.2018.02.028
    • NLM

      Bueno C, Fabricio MM. Comparative analysis between a complete LCA study and results from a BIM-LCA plug-in [Internet]. Automation in Construction. 2018 ; 90 188-200.[citado 2024 ago. 09 ] Available from: https://doi.org/10.1016/j.autcon.2018.02.028
    • Vancouver

      Bueno C, Fabricio MM. Comparative analysis between a complete LCA study and results from a BIM-LCA plug-in [Internet]. Automation in Construction. 2018 ; 90 188-200.[citado 2024 ago. 09 ] Available from: https://doi.org/10.1016/j.autcon.2018.02.028

Digital Library of Intellectual Production of Universidade de São Paulo     2012 - 2024