Filtros : "International Journal of Oil, Gas and Coal Technology" Limpar

Filtros



Refine with date range


  • Source: International Journal of Oil, Gas and Coal Technology. Unidade: EP

    Assunto: RESERVATÓRIOS DE PETRÓLEO

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      PINTO, Marcio Augusto Sampaio e GASPAR , Ana Teresa Ferreira da Silva e SCHIOZER, Denis José. Optimisation of well rates under production constraints. International Journal of Oil, Gas and Coal Technology, v. 21, n. 2, 2019Tradução . . Disponível em: https://doi.org/10.1504/IJOGCT.2019.099586. Acesso em: 16 out. 2024.
    • APA

      Pinto, M. A. S., Gaspar , A. T. F. da S., & Schiozer, D. J. (2019). Optimisation of well rates under production constraints. International Journal of Oil, Gas and Coal Technology, 21( 2). doi:10.1504/IJOGCT.2019.099586
    • NLM

      Pinto MAS, Gaspar ATF da S, Schiozer DJ. Optimisation of well rates under production constraints [Internet]. International Journal of Oil, Gas and Coal Technology. 2019 ; 21( 2):[citado 2024 out. 16 ] Available from: https://doi.org/10.1504/IJOGCT.2019.099586
    • Vancouver

      Pinto MAS, Gaspar ATF da S, Schiozer DJ. Optimisation of well rates under production constraints [Internet]. International Journal of Oil, Gas and Coal Technology. 2019 ; 21( 2):[citado 2024 out. 16 ] Available from: https://doi.org/10.1504/IJOGCT.2019.099586
  • Source: International Journal of Oil, Gas and Coal Technology. Unidade: EP

    Subjects: PERFURAÇÃO DE POÇOS, PRÉ-SAL

    Acesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      PINTO, Marcio Augusto Sampaio e SUSLICK, Saul Barisnik. Impact of offshore drilling rigs availability in the optimal investment timing on high-deep water projects in the Santos Basin. International Journal of Oil, Gas and Coal Technology, v. 15, n. 3, p. 217 -234, 2017Tradução . . Disponível em: https://doi.org/10.1504/IJOGCT.2017.10005336. Acesso em: 16 out. 2024.
    • APA

      Pinto, M. A. S., & Suslick, S. B. (2017). Impact of offshore drilling rigs availability in the optimal investment timing on high-deep water projects in the Santos Basin. International Journal of Oil, Gas and Coal Technology, 15( 3), 217 -234. doi:10.1504/IJOGCT.2017.10005336
    • NLM

      Pinto MAS, Suslick SB. Impact of offshore drilling rigs availability in the optimal investment timing on high-deep water projects in the Santos Basin [Internet]. International Journal of Oil, Gas and Coal Technology. 2017 ; 15( 3): 217 -234.[citado 2024 out. 16 ] Available from: https://doi.org/10.1504/IJOGCT.2017.10005336
    • Vancouver

      Pinto MAS, Suslick SB. Impact of offshore drilling rigs availability in the optimal investment timing on high-deep water projects in the Santos Basin [Internet]. International Journal of Oil, Gas and Coal Technology. 2017 ; 15( 3): 217 -234.[citado 2024 out. 16 ] Available from: https://doi.org/10.1504/IJOGCT.2017.10005336

Digital Library of Intellectual Production of Universidade de São Paulo     2012 - 2024