Filtros : "Santoro, Miguel" "Inglês" Limpar

Filtros



Refine with date range


  • Source: Computers & Industrial Engineering. Unidade: EP

    Subjects: SCHEDULING, PROGRAMAÇÃO MATEMÁTICA, PROGRAMAÇÃO INTEIRA E FLUXOS EM REDE, PROGRAMAÇÃO MISTA, PROGRAMAÇÃO LINEAR

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      SANTORO, Miguel e JUNQUEIRA, Leonardo. Unrelated parallel machine scheduling models with machine availability and eligibility constraints. Computers & Industrial Engineering, v. 179, p. 16 on-line, 2023Tradução . . Disponível em: https://doi.org/10.1016/j.cie.2023.109219. Acesso em: 03 nov. 2024.
    • APA

      Santoro, M., & Junqueira, L. (2023). Unrelated parallel machine scheduling models with machine availability and eligibility constraints. Computers & Industrial Engineering, 179, 16 on-line. doi:10.1016/j.cie.2023.109219
    • NLM

      Santoro M, Junqueira L. Unrelated parallel machine scheduling models with machine availability and eligibility constraints [Internet]. Computers & Industrial Engineering. 2023 ; 179 16 on-line.[citado 2024 nov. 03 ] Available from: https://doi.org/10.1016/j.cie.2023.109219
    • Vancouver

      Santoro M, Junqueira L. Unrelated parallel machine scheduling models with machine availability and eligibility constraints [Internet]. Computers & Industrial Engineering. 2023 ; 179 16 on-line.[citado 2024 nov. 03 ] Available from: https://doi.org/10.1016/j.cie.2023.109219
  • Source: REM: Revista Escola de Minas. Unidade: EP

    Subjects: MINERAÇÃO A CÉU ABERTO (PLANEJAMENTO), PLANEJAMENTO DA PRODUÇÃO, PROGRAMAÇÃO LINEAR

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ANDRADE, Arthur Quintão de e SANTORO, Miguel e DE TOMI, Giorgio Francesco Cesare. Mathematical model and supporting algorithm to aid the sequencing and scheduling of mining with loading equipment allocation. REM: Revista Escola de Minas, v. 67, n. 4, p. 379-387, 2014Tradução . . Disponível em: https://doi.org/10.1590/0370-44672014670175. Acesso em: 03 nov. 2024.
    • APA

      Andrade, A. Q. de, Santoro, M., & De Tomi, G. F. C. (2014). Mathematical model and supporting algorithm to aid the sequencing and scheduling of mining with loading equipment allocation. REM: Revista Escola de Minas, 67( 4), 379-387. doi:10.1590/0370-44672014670175
    • NLM

      Andrade AQ de, Santoro M, De Tomi GFC. Mathematical model and supporting algorithm to aid the sequencing and scheduling of mining with loading equipment allocation [Internet]. REM: Revista Escola de Minas. 2014 ;67( 4): 379-387.[citado 2024 nov. 03 ] Available from: https://doi.org/10.1590/0370-44672014670175
    • Vancouver

      Andrade AQ de, Santoro M, De Tomi GFC. Mathematical model and supporting algorithm to aid the sequencing and scheduling of mining with loading equipment allocation [Internet]. REM: Revista Escola de Minas. 2014 ;67( 4): 379-387.[citado 2024 nov. 03 ] Available from: https://doi.org/10.1590/0370-44672014670175
  • Source: Proceedings. Challenges for sustainable operations. Conference titles: International Conference on Production Research - ICPR. Unidade: EP

    Subjects: PLANEJAMENTO DA PRODUÇÃO, CARNES E DERIVADOS, INDÚSTRIA DE ALIMENTOS

    PrivadoHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ARRUDA JUNIOR, Olinto Rodrigues de e SANTORO, Miguel. Two-stage tactical planning model for the meat processing industry with divergent production flow. 2013, Anais.. S.l: ABEPRO, 2013. Disponível em: https://repositorio.usp.br/directbitstream/be943ecc-ef3a-457c-bb3c-9d20190e6b0f/Santoro-2013-two_stage.pdf. Acesso em: 03 nov. 2024.
    • APA

      Arruda Junior, O. R. de, & Santoro, M. (2013). Two-stage tactical planning model for the meat processing industry with divergent production flow. In Proceedings. Challenges for sustainable operations. S.l: ABEPRO. Recuperado de https://repositorio.usp.br/directbitstream/be943ecc-ef3a-457c-bb3c-9d20190e6b0f/Santoro-2013-two_stage.pdf
    • NLM

      Arruda Junior OR de, Santoro M. Two-stage tactical planning model for the meat processing industry with divergent production flow [Internet]. Proceedings. Challenges for sustainable operations. 2013 ;[citado 2024 nov. 03 ] Available from: https://repositorio.usp.br/directbitstream/be943ecc-ef3a-457c-bb3c-9d20190e6b0f/Santoro-2013-two_stage.pdf
    • Vancouver

      Arruda Junior OR de, Santoro M. Two-stage tactical planning model for the meat processing industry with divergent production flow [Internet]. Proceedings. Challenges for sustainable operations. 2013 ;[citado 2024 nov. 03 ] Available from: https://repositorio.usp.br/directbitstream/be943ecc-ef3a-457c-bb3c-9d20190e6b0f/Santoro-2013-two_stage.pdf
  • Source: International Journal of Logistics Systems and Management. Unidade: EP

    Subjects: LOGÍSTICA, TRANSPORTE DE CARGA (PLANEJAMENTO), POTÁSSIO, INDÚSTRIA DE FERTILIZANTES, INSUMOS AGRÍCOLAS

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      SANTORO, Miguel e RONCONI, Débora Pretti. Modelling the transportation and warehousing of potassium chloride in the fertiliser industry. International Journal of Logistics Systems and Management, v. 8, n. 3 p. 298 - 312, 2011Tradução . . Disponível em: https://doi.org/10.1504/ijlsm.2011.038989. Acesso em: 03 nov. 2024.
    • APA

      Santoro, M., & Ronconi, D. P. (2011). Modelling the transportation and warehousing of potassium chloride in the fertiliser industry. International Journal of Logistics Systems and Management, 8( 3 p. 298 - 312). doi:10.1504/ijlsm.2011.038989
    • NLM

      Santoro M, Ronconi DP. Modelling the transportation and warehousing of potassium chloride in the fertiliser industry [Internet]. International Journal of Logistics Systems and Management. 2011 ; 8( 3 p. 298 - 312):[citado 2024 nov. 03 ] Available from: https://doi.org/10.1504/ijlsm.2011.038989
    • Vancouver

      Santoro M, Ronconi DP. Modelling the transportation and warehousing of potassium chloride in the fertiliser industry [Internet]. International Journal of Logistics Systems and Management. 2011 ; 8( 3 p. 298 - 312):[citado 2024 nov. 03 ] Available from: https://doi.org/10.1504/ijlsm.2011.038989
  • Source: International Journal of Production Research. Unidade: EP

    Subjects: SCHEDULING, HEURÍSTICA, SIMULAÇÃO

    PrivadoAcesso à fonteAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      PEREIRA, Mário Tonizza e SANTORO, Miguel. An integrative heuristic method for detailed operations scheduling in assembly job shop systems. International Journal of Production Research, v. 49, n. 20, p. 6089–6105, 2011Tradução . . Disponível em: https://doi.org/10.1080/00207543.2010.527385. Acesso em: 03 nov. 2024.
    • APA

      Pereira, M. T., & Santoro, M. (2011). An integrative heuristic method for detailed operations scheduling in assembly job shop systems. International Journal of Production Research, 49( 20), 6089–6105. doi:10.1080/00207543.2010.527385
    • NLM

      Pereira MT, Santoro M. An integrative heuristic method for detailed operations scheduling in assembly job shop systems [Internet]. International Journal of Production Research. 2011 ;49( 20): 6089–6105.[citado 2024 nov. 03 ] Available from: https://doi.org/10.1080/00207543.2010.527385
    • Vancouver

      Pereira MT, Santoro M. An integrative heuristic method for detailed operations scheduling in assembly job shop systems [Internet]. International Journal of Production Research. 2011 ;49( 20): 6089–6105.[citado 2024 nov. 03 ] Available from: https://doi.org/10.1080/00207543.2010.527385
  • Conference titles: European Conference on Operational Research. Unidade: EP

    Assunto: SEQUENCIAÇÃO DA PRODUÇÃO

    How to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      LEMOS, Felipe e SANTORO, Miguel. Sequencing bidimensional guillotine cutting operations considering lateness and raw material utilization. 2010, Anais.. Lisboa: Escola Politécnica, Universidade de São Paulo, 2010. . Acesso em: 03 nov. 2024.
    • APA

      Lemos, F., & Santoro, M. (2010). Sequencing bidimensional guillotine cutting operations considering lateness and raw material utilization. In . Lisboa: Escola Politécnica, Universidade de São Paulo.
    • NLM

      Lemos F, Santoro M. Sequencing bidimensional guillotine cutting operations considering lateness and raw material utilization. 2010 ;[citado 2024 nov. 03 ]
    • Vancouver

      Lemos F, Santoro M. Sequencing bidimensional guillotine cutting operations considering lateness and raw material utilization. 2010 ;[citado 2024 nov. 03 ]
  • Source: IMDC. Conference titles: International Marine Design Conference. Unidade: EP

    Subjects: OPERAÇÕES DE TRANSPORTES, PROGRAMAÇÃO MATEMÁTICA, ROTEIRIZAÇÃO, HEURÍSTICA

    PrivadoHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MENDES, André Bergsten e BRINATI, Marco Antônio e SANTORO, Miguel. A mathematical programming model for scheduling anchor handling vessels. 2009, Anais.. Trondheim: Tapir Academic Press, 2009. Disponível em: https://repositorio.usp.br/directbitstream/71a28734-d4e7-4a4b-aaaa-9f26a5a8d293/Brinati_MA-2009-Mathematical%20Programming%20ok.pdf. Acesso em: 03 nov. 2024.
    • APA

      Mendes, A. B., Brinati, M. A., & Santoro, M. (2009). A mathematical programming model for scheduling anchor handling vessels. In IMDC. Trondheim: Tapir Academic Press. Recuperado de https://repositorio.usp.br/directbitstream/71a28734-d4e7-4a4b-aaaa-9f26a5a8d293/Brinati_MA-2009-Mathematical%20Programming%20ok.pdf
    • NLM

      Mendes AB, Brinati MA, Santoro M. A mathematical programming model for scheduling anchor handling vessels [Internet]. IMDC. 2009 ;[citado 2024 nov. 03 ] Available from: https://repositorio.usp.br/directbitstream/71a28734-d4e7-4a4b-aaaa-9f26a5a8d293/Brinati_MA-2009-Mathematical%20Programming%20ok.pdf
    • Vancouver

      Mendes AB, Brinati MA, Santoro M. A mathematical programming model for scheduling anchor handling vessels [Internet]. IMDC. 2009 ;[citado 2024 nov. 03 ] Available from: https://repositorio.usp.br/directbitstream/71a28734-d4e7-4a4b-aaaa-9f26a5a8d293/Brinati_MA-2009-Mathematical%20Programming%20ok.pdf
  • Source: Proceedings. Conference titles: International Workshop on Modeling & Applied Simulation. Unidade: EP

    Subjects: ADMINISTRAÇÃO DE ESTOQUES, LOGÍSTICA, CADEIA DE SUPRIMENTOS, ESTRATÉGIA ORGANIZACIONAL

    PrivadoHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MAGALHÃES, Marcos Simas e SANTORO, Miguel. Configuration of a service and distribution network in the aerospace industry. 2009, Anais.. La Laguna: Universidad de la Laguna, 2009. Disponível em: https://repositorio.usp.br/directbitstream/839661e7-e078-4b03-8ae2-c6fe8a2cda7e/Santoro-2009-configuration.pdf. Acesso em: 03 nov. 2024.
    • APA

      Magalhães, M. S., & Santoro, M. (2009). Configuration of a service and distribution network in the aerospace industry. In Proceedings. La Laguna: Universidad de la Laguna. Recuperado de https://repositorio.usp.br/directbitstream/839661e7-e078-4b03-8ae2-c6fe8a2cda7e/Santoro-2009-configuration.pdf
    • NLM

      Magalhães MS, Santoro M. Configuration of a service and distribution network in the aerospace industry [Internet]. Proceedings. 2009 ;[citado 2024 nov. 03 ] Available from: https://repositorio.usp.br/directbitstream/839661e7-e078-4b03-8ae2-c6fe8a2cda7e/Santoro-2009-configuration.pdf
    • Vancouver

      Magalhães MS, Santoro M. Configuration of a service and distribution network in the aerospace industry [Internet]. Proceedings. 2009 ;[citado 2024 nov. 03 ] Available from: https://repositorio.usp.br/directbitstream/839661e7-e078-4b03-8ae2-c6fe8a2cda7e/Santoro-2009-configuration.pdf
  • Source: Proceedings. Conference titles: International Workshop on Modeling & Applied Simulation. Unidade: EP

    Subjects: INVENTÁRIO, SIMULAÇÃO DE SISTEMAS, ESTOQUES

    PrivadoHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      SANTORO, Miguel e FREIRE, Gilberto. Effect of negative parameters in inventory models performance. 2008, Anais.. Rende: [s.n.], 2008. Disponível em: https://repositorio.usp.br/directbitstream/e448ede6-9cd7-49cf-8c9c-273c3eb21f80/Santoro-2008-effect.pdf. Acesso em: 03 nov. 2024.
    • APA

      Santoro, M., & Freire, G. (2008). Effect of negative parameters in inventory models performance. In Proceedings. Rende: [s.n.]. Recuperado de https://repositorio.usp.br/directbitstream/e448ede6-9cd7-49cf-8c9c-273c3eb21f80/Santoro-2008-effect.pdf
    • NLM

      Santoro M, Freire G. Effect of negative parameters in inventory models performance [Internet]. Proceedings. 2008 ;[citado 2024 nov. 03 ] Available from: https://repositorio.usp.br/directbitstream/e448ede6-9cd7-49cf-8c9c-273c3eb21f80/Santoro-2008-effect.pdf
    • Vancouver

      Santoro M, Freire G. Effect of negative parameters in inventory models performance [Internet]. Proceedings. 2008 ;[citado 2024 nov. 03 ] Available from: https://repositorio.usp.br/directbitstream/e448ede6-9cd7-49cf-8c9c-273c3eb21f80/Santoro-2008-effect.pdf
  • Source: CLAIO 2008: book of extended abstracts.. Conference titles: Latin-Ibero American Congress on Operations Research. Unidade: EP

    Subjects: OPERAÇÕES DE TRANSPORTES, ROTEIRIZAÇÃO, PROGRAMAÇÃO INTEIRA E FLUXOS EM REDE, PLANEJAMENTO DE TRANSPORTES

    PrivadoHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MENDES, André Bergsten e BRINATI, Marco Antônio e SANTORO, Miguel. A mixed-integer programming formulation for scheduling anchor handling vessels. 2008, Anais.. Cartagena de Indias: International Federation of Operational Research Societies, 2008. Disponível em: https://repositorio.usp.br/directbitstream/f84e404b-de87-4777-aec6-780386df5a0e/Brinati_MA-2008-mixed%20integer%20ok.pdf. Acesso em: 03 nov. 2024.
    • APA

      Mendes, A. B., Brinati, M. A., & Santoro, M. (2008). A mixed-integer programming formulation for scheduling anchor handling vessels. In CLAIO 2008: book of extended abstracts.. Cartagena de Indias: International Federation of Operational Research Societies. Recuperado de https://repositorio.usp.br/directbitstream/f84e404b-de87-4777-aec6-780386df5a0e/Brinati_MA-2008-mixed%20integer%20ok.pdf
    • NLM

      Mendes AB, Brinati MA, Santoro M. A mixed-integer programming formulation for scheduling anchor handling vessels [Internet]. CLAIO 2008: book of extended abstracts. 2008 ;[citado 2024 nov. 03 ] Available from: https://repositorio.usp.br/directbitstream/f84e404b-de87-4777-aec6-780386df5a0e/Brinati_MA-2008-mixed%20integer%20ok.pdf
    • Vancouver

      Mendes AB, Brinati MA, Santoro M. A mixed-integer programming formulation for scheduling anchor handling vessels [Internet]. CLAIO 2008: book of extended abstracts. 2008 ;[citado 2024 nov. 03 ] Available from: https://repositorio.usp.br/directbitstream/f84e404b-de87-4777-aec6-780386df5a0e/Brinati_MA-2008-mixed%20integer%20ok.pdf
  • Source: Brazilian Journal of Operations & Production Management. Unidade: EP

    Subjects: SCHEDULING, PROGRAMAÇÃO DA PRODUÇÃO, SIMULAÇÃO

    PrivadoAcesso à fonteHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      SANTORO, Miguel e MESQUITA, Marco Aurélio de. The effect of the workload on due date performance in job shop scheduling. Brazilian Journal of Operations & Production Management, v. 5, n. 1, p. 75-88, 2008Tradução . . Disponível em: http://www.abepro.org.br/arquivos/websites/16/BJOPM_v5n1_2008.pdf. Acesso em: 03 nov. 2024.
    • APA

      Santoro, M., & Mesquita, M. A. de. (2008). The effect of the workload on due date performance in job shop scheduling. Brazilian Journal of Operations & Production Management, 5( 1), 75-88. Recuperado de http://www.abepro.org.br/arquivos/websites/16/BJOPM_v5n1_2008.pdf
    • NLM

      Santoro M, Mesquita MA de. The effect of the workload on due date performance in job shop scheduling [Internet]. Brazilian Journal of Operations & Production Management. 2008 ;5( 1): 75-88.[citado 2024 nov. 03 ] Available from: http://www.abepro.org.br/arquivos/websites/16/BJOPM_v5n1_2008.pdf
    • Vancouver

      Santoro M, Mesquita MA de. The effect of the workload on due date performance in job shop scheduling [Internet]. Brazilian Journal of Operations & Production Management. 2008 ;5( 1): 75-88.[citado 2024 nov. 03 ] Available from: http://www.abepro.org.br/arquivos/websites/16/BJOPM_v5n1_2008.pdf
  • Source: Book of Abstracts: 6th Annual HCTM Conference. Conference titles: International Conference on the Management of Healthcare and Medical Technology. Unidade: EP

    Subjects: SERVIÇOS DE SAÚDE (CUIDADOS), INVENTÁRIO (MÉTODOS;PESQUISA;SIMULAÇÃO)

    PrivadoHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      SANTORO, Miguel e FREIRE, Gilberto. Inventory system to healthcare & medical instituitions. 2007, Anais.. S.l: HCTM, 2007. Disponível em: https://repositorio.usp.br/directbitstream/973c5a64-029c-4a66-bdee-2a39380f0516/Santoro-2007-inventory.pdf. Acesso em: 03 nov. 2024.
    • APA

      Santoro, M., & Freire, G. (2007). Inventory system to healthcare & medical instituitions. In Book of Abstracts: 6th Annual HCTM Conference. S.l: HCTM. Recuperado de https://repositorio.usp.br/directbitstream/973c5a64-029c-4a66-bdee-2a39380f0516/Santoro-2007-inventory.pdf
    • NLM

      Santoro M, Freire G. Inventory system to healthcare & medical instituitions [Internet]. Book of Abstracts: 6th Annual HCTM Conference. 2007 ;[citado 2024 nov. 03 ] Available from: https://repositorio.usp.br/directbitstream/973c5a64-029c-4a66-bdee-2a39380f0516/Santoro-2007-inventory.pdf
    • Vancouver

      Santoro M, Freire G. Inventory system to healthcare & medical instituitions [Internet]. Book of Abstracts: 6th Annual HCTM Conference. 2007 ;[citado 2024 nov. 03 ] Available from: https://repositorio.usp.br/directbitstream/973c5a64-029c-4a66-bdee-2a39380f0516/Santoro-2007-inventory.pdf
  • Source: ICPR 2005: proceedings.. Conference titles: International Conference on Production Research. Unidade: EP

    Subjects: PROGRAMAÇÃO DA PRODUÇÃO, SIMULAÇÃO

    PrivadoHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      SANTORO, Miguel e MESQUITA, Marco Aurélio de. Simulation-based due-date performance evaluation in conwip systems. 2005, Anais.. Fisciano, SA, Italy: University of Salerno, 2005. Disponível em: https://repositorio.usp.br/directbitstream/85cd2cf7-d627-42da-9044-779d7a533c9b/Santoro-2005-simulation.pdf. Acesso em: 03 nov. 2024.
    • APA

      Santoro, M., & Mesquita, M. A. de. (2005). Simulation-based due-date performance evaluation in conwip systems. In ICPR 2005: proceedings.. Fisciano, SA, Italy: University of Salerno. Recuperado de https://repositorio.usp.br/directbitstream/85cd2cf7-d627-42da-9044-779d7a533c9b/Santoro-2005-simulation.pdf
    • NLM

      Santoro M, Mesquita MA de. Simulation-based due-date performance evaluation in conwip systems [Internet]. ICPR 2005: proceedings. 2005 ;[citado 2024 nov. 03 ] Available from: https://repositorio.usp.br/directbitstream/85cd2cf7-d627-42da-9044-779d7a533c9b/Santoro-2005-simulation.pdf
    • Vancouver

      Santoro M, Mesquita MA de. Simulation-based due-date performance evaluation in conwip systems [Internet]. ICPR 2005: proceedings. 2005 ;[citado 2024 nov. 03 ] Available from: https://repositorio.usp.br/directbitstream/85cd2cf7-d627-42da-9044-779d7a533c9b/Santoro-2005-simulation.pdf
  • Source: Abstracts. Conference titles: INFORMS Annual Meeting Atlanta 2003. Unidade: EP

    Assunto: ADMINISTRAÇÃO DA PRODUÇÃO

    PrivadoHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MESQUITA, Marco Aurélio de e SANTORO, Miguel. Models and practices in production and inventory management. 2003, Anais.. Atlanta: OR/MS, 2003. Disponível em: https://repositorio.usp.br/directbitstream/fb9fd9ab-ae0a-4d16-9909-c33c249abc2a/Mesquita-2003-Models.pdf. Acesso em: 03 nov. 2024.
    • APA

      Mesquita, M. A. de, & Santoro, M. (2003). Models and practices in production and inventory management. In Abstracts. Atlanta: OR/MS. Recuperado de https://repositorio.usp.br/directbitstream/fb9fd9ab-ae0a-4d16-9909-c33c249abc2a/Mesquita-2003-Models.pdf
    • NLM

      Mesquita MA de, Santoro M. Models and practices in production and inventory management [Internet]. Abstracts. 2003 ;[citado 2024 nov. 03 ] Available from: https://repositorio.usp.br/directbitstream/fb9fd9ab-ae0a-4d16-9909-c33c249abc2a/Mesquita-2003-Models.pdf
    • Vancouver

      Mesquita MA de, Santoro M. Models and practices in production and inventory management [Internet]. Abstracts. 2003 ;[citado 2024 nov. 03 ] Available from: https://repositorio.usp.br/directbitstream/fb9fd9ab-ae0a-4d16-9909-c33c249abc2a/Mesquita-2003-Models.pdf
  • Source: Caderno de Resumos. Conference titles: Encontro Conjunto Tims. Unidade: EP

    Assunto: ADMINISTRAÇÃO DE EMPRESAS

    How to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      YOSHIZAKI, Hugo et al. Systemic model for logistical integration. 1991, Anais.. Rio de Janeiro: Sobrapo, 1991. . Acesso em: 03 nov. 2024.
    • APA

      Yoshizaki, H., Fleury, A., Santoro, M., & Muscat, A. (1991). Systemic model for logistical integration. In Caderno de Resumos. Rio de Janeiro: Sobrapo.
    • NLM

      Yoshizaki H, Fleury A, Santoro M, Muscat A. Systemic model for logistical integration. Caderno de Resumos. 1991 ;[citado 2024 nov. 03 ]
    • Vancouver

      Yoshizaki H, Fleury A, Santoro M, Muscat A. Systemic model for logistical integration. Caderno de Resumos. 1991 ;[citado 2024 nov. 03 ]

Digital Library of Intellectual Production of Universidade de São Paulo     2012 - 2024