Filters : "SCHEDULING" Limpar

Filters



Refine with date range

Vocabulário Controlado do SIBiUSP


  • Source: International Journal of Parallel Programming. Unidade: IME

    Subjects: APRENDIZADO COMPUTACIONAL, SCHEDULING

    Available on 2022-08-23Online source accessDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      GENG, Tongsheng et al. A profile-based AI-assisted dynamic scheduling approach for heterogeneous architectures. International Journal of Parallel Programming, v. 50, n. 1, p. 115-151, 2022Tradução . . Disponível em: https://doi.org/10.1007/s10766-021-00721-2. Acesso em: 10 ago. 2022.
    • APA

      Geng, T., Amarís, M., Zuckerman, S., Goldman, A., Gao, G. R., & Gaudiot, J. -L. (2022). A profile-based AI-assisted dynamic scheduling approach for heterogeneous architectures. International Journal of Parallel Programming, 50( 1), 115-151. doi:10.1007/s10766-021-00721-2
    • NLM

      Geng T, Amarís M, Zuckerman S, Goldman A, Gao GR, Gaudiot J-L. A profile-based AI-assisted dynamic scheduling approach for heterogeneous architectures [Internet]. International Journal of Parallel Programming. 2022 ; 50( 1): 115-151.[citado 2022 ago. 10 ] Available from: https://doi.org/10.1007/s10766-021-00721-2
    • Vancouver

      Geng T, Amarís M, Zuckerman S, Goldman A, Gao GR, Gaudiot J-L. A profile-based AI-assisted dynamic scheduling approach for heterogeneous architectures [Internet]. International Journal of Parallel Programming. 2022 ; 50( 1): 115-151.[citado 2022 ago. 10 ] Available from: https://doi.org/10.1007/s10766-021-00721-2
  • Source: European Journal of Operational Research. Unidades: IME, EP

    Subjects: PROGRAMAÇÃO MATEMÁTICA, SCHEDULING

    Versão AceitaOnline source accessDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      LUNARDI, Willian Tessaro et al. Metaheuristics for the online printing shop scheduling problem. European Journal of Operational Research, v. 293, n. 2, p. 419-441, 2021Tradução . . Disponível em: https://doi.org/10.1016/j.ejor.2020.12.021. Acesso em: 10 ago. 2022.
    • APA

      Lunardi, W. T., Birgin, E. J. G., Ronconi, D. P., & Voos, H. (2021). Metaheuristics for the online printing shop scheduling problem. European Journal of Operational Research, 293( 2), 419-441. doi:10.1016/j.ejor.2020.12.021
    • NLM

      Lunardi WT, Birgin EJG, Ronconi DP, Voos H. Metaheuristics for the online printing shop scheduling problem [Internet]. European Journal of Operational Research. 2021 ; 293( 2): 419-441.[citado 2022 ago. 10 ] Available from: https://doi.org/10.1016/j.ejor.2020.12.021
    • Vancouver

      Lunardi WT, Birgin EJG, Ronconi DP, Voos H. Metaheuristics for the online printing shop scheduling problem [Internet]. European Journal of Operational Research. 2021 ; 293( 2): 419-441.[citado 2022 ago. 10 ] Available from: https://doi.org/10.1016/j.ejor.2020.12.021
  • Source: Computers & Industrial Engineering. Unidade: EESC

    Subjects: SCHEDULING, ALGORITMOS GENÉTICOS, HEURÍSTICA

    Online source accessDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ROSSI, Fernando Luis e NAGANO, Marcelo Seido. Heuristics and iterated greedy algorithms for the distributed mixed no-idle flowshop with sequence-dependent setup times. Computers & Industrial Engineering, v. 157, 2021Tradução . . Disponível em: http://dx.doi.org/10.1016/j.cie.2021.107337. Acesso em: 10 ago. 2022.
    • APA

      Rossi, F. L., & Nagano, M. S. (2021). Heuristics and iterated greedy algorithms for the distributed mixed no-idle flowshop with sequence-dependent setup times. Computers & Industrial Engineering, 157. doi:10.1016/j.cie.2021.107337
    • NLM

      Rossi FL, Nagano MS. Heuristics and iterated greedy algorithms for the distributed mixed no-idle flowshop with sequence-dependent setup times [Internet]. Computers & Industrial Engineering. 2021 ; 157[citado 2022 ago. 10 ] Available from: http://dx.doi.org/10.1016/j.cie.2021.107337
    • Vancouver

      Rossi FL, Nagano MS. Heuristics and iterated greedy algorithms for the distributed mixed no-idle flowshop with sequence-dependent setup times [Internet]. Computers & Industrial Engineering. 2021 ; 157[citado 2022 ago. 10 ] Available from: http://dx.doi.org/10.1016/j.cie.2021.107337
  • Source: Sensors. Unidade: ICMC

    Subjects: ALGORITMOS GENÉTICOS, OTIMIZAÇÃO COMBINATÓRIA, SCHEDULING

    Versão PublicadaOnline source accessDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      VIANA, Monique Simplicio e MORANDIN JUNIOR, Orides e CONTRERAS, Rodrigo Colnago. A modified genetic algorithm with local search strategies and multi-crossover operator for Job Shop Scheduling Problem. Sensors, v. 20, n. 18, p. Se 2020, 2020Tradução . . Disponível em: https://doi.org/10.3390/s20185440. Acesso em: 10 ago. 2022.
    • APA

      Viana, M. S., Morandin Junior, O., & Contreras, R. C. (2020). A modified genetic algorithm with local search strategies and multi-crossover operator for Job Shop Scheduling Problem. Sensors, 20( 18), Se 2020. doi:10.3390/s20185440
    • NLM

      Viana MS, Morandin Junior O, Contreras RC. A modified genetic algorithm with local search strategies and multi-crossover operator for Job Shop Scheduling Problem [Internet]. Sensors. 2020 ; 20( 18): Se 2020.[citado 2022 ago. 10 ] Available from: https://doi.org/10.3390/s20185440
    • Vancouver

      Viana MS, Morandin Junior O, Contreras RC. A modified genetic algorithm with local search strategies and multi-crossover operator for Job Shop Scheduling Problem [Internet]. Sensors. 2020 ; 20( 18): Se 2020.[citado 2022 ago. 10 ] Available from: https://doi.org/10.3390/s20185440
  • Source: Proceedings. Conference title: Latin-American Conference on Communications - LATINCOM. Unidade: IME

    Subject: SCHEDULING

    PrivateOnline source accessDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      SANTOS, Giovanne Marcelo dos e BATISTA, Daniel Macêdo. On-demand placement and scheduling of virtual network functions with software requirements. 2020, Anais.. Piscataway: IEEE, 2020. Disponível em: https://doi.org/10.1109/LATINCOM50620.2020.9282289. Acesso em: 10 ago. 2022.
    • APA

      Santos, G. M. dos, & Batista, D. M. (2020). On-demand placement and scheduling of virtual network functions with software requirements. In Proceedings. Piscataway: IEEE. doi:10.1109/LATINCOM50620.2020.9282289
    • NLM

      Santos GM dos, Batista DM. On-demand placement and scheduling of virtual network functions with software requirements [Internet]. Proceedings. 2020 ;[citado 2022 ago. 10 ] Available from: https://doi.org/10.1109/LATINCOM50620.2020.9282289
    • Vancouver

      Santos GM dos, Batista DM. On-demand placement and scheduling of virtual network functions with software requirements [Internet]. Proceedings. 2020 ;[citado 2022 ago. 10 ] Available from: https://doi.org/10.1109/LATINCOM50620.2020.9282289
  • Source: Proceedings. Conference title: Workshop on Job Scheduling Strategies for Parallel Processing - JSSPP. Unidade: IME

    Subjects: MÉTODOS ITERATIVOS, SCHEDULING

    PrivateOnline source accessDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      GENG, Tongsheng et al. PDAWL: profile-based iterative dynamic adaptive workload balance on heterogeneous architectures. 2020, Anais.. Cham: Springer, 2020. Disponível em: https://doi.org/10.1007/978-3-030-63171-0_8. Acesso em: 10 ago. 2022.
    • APA

      Geng, T., Amarís, M., Zuckerman, S., Goldman, A., Gao, G. R., & Gaudiot, J. -L. (2020). PDAWL: profile-based iterative dynamic adaptive workload balance on heterogeneous architectures. In Proceedings. Cham: Springer. doi:10.1007/978-3-030-63171-0_8
    • NLM

      Geng T, Amarís M, Zuckerman S, Goldman A, Gao GR, Gaudiot J-L. PDAWL: profile-based iterative dynamic adaptive workload balance on heterogeneous architectures [Internet]. Proceedings. 2020 ;[citado 2022 ago. 10 ] Available from: https://doi.org/10.1007/978-3-030-63171-0_8
    • Vancouver

      Geng T, Amarís M, Zuckerman S, Goldman A, Gao GR, Gaudiot J-L. PDAWL: profile-based iterative dynamic adaptive workload balance on heterogeneous architectures [Internet]. Proceedings. 2020 ;[citado 2022 ago. 10 ] Available from: https://doi.org/10.1007/978-3-030-63171-0_8
  • Source: Computers & Industrial Engineering. Unidade: EESC

    Subjects: HEURÍSTICA, SCHEDULING, SEQUENCIAÇÃO DA PRODUÇÃO, MANUTENÇÃO PREVENTIVA

    Online source accessDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MIYATA, Hugo Hissashi e NAGANO, Marcelo Seido e GUPTA, Jatinder N. D. Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization. Computers & Industrial Engineering, v. 135, p. Se 2019, 2019Tradução . . Disponível em: http://dx.doi.org/10.1016/j.cie.2019.05.034. Acesso em: 10 ago. 2022.
    • APA

      Miyata, H. H., Nagano, M. S., & Gupta, J. N. D. (2019). Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization. Computers & Industrial Engineering, 135, Se 2019. doi:10.1016/j.cie.2019.05.034
    • NLM

      Miyata HH, Nagano MS, Gupta JND. Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization [Internet]. Computers & Industrial Engineering. 2019 ; 135 Se 2019.[citado 2022 ago. 10 ] Available from: http://dx.doi.org/10.1016/j.cie.2019.05.034
    • Vancouver

      Miyata HH, Nagano MS, Gupta JND. Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization [Internet]. Computers & Industrial Engineering. 2019 ; 135 Se 2019.[citado 2022 ago. 10 ] Available from: http://dx.doi.org/10.1016/j.cie.2019.05.034
  • Source: Expert Systems with Applications: an international journal. Unidade: EESC

    Subjects: SCHEDULING, FLUXOGRAMA, LOJAS

    Online source accessDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MIYATA, Hugo Hissashi e NAGANO, Marcelo Seido. The blocking flow shop scheduling problem: a comprehensive and conceptual review. Expert Systems with Applications: an international journal, v. 135, p. 130-156, 2019Tradução . . Disponível em: http://dx.doi.org/10.1016/j.eswa.2019.06.069. Acesso em: 10 ago. 2022.
    • APA

      Miyata, H. H., & Nagano, M. S. (2019). The blocking flow shop scheduling problem: a comprehensive and conceptual review. Expert Systems with Applications: an international journal, 135, 130-156. doi:10.1016/j.eswa.2019.06.069
    • NLM

      Miyata HH, Nagano MS. The blocking flow shop scheduling problem: a comprehensive and conceptual review [Internet]. Expert Systems with Applications: an international journal. 2019 ; 135 130-156.[citado 2022 ago. 10 ] Available from: http://dx.doi.org/10.1016/j.eswa.2019.06.069
    • Vancouver

      Miyata HH, Nagano MS. The blocking flow shop scheduling problem: a comprehensive and conceptual review [Internet]. Expert Systems with Applications: an international journal. 2019 ; 135 130-156.[citado 2022 ago. 10 ] Available from: http://dx.doi.org/10.1016/j.eswa.2019.06.069
  • Source: Swarm and Evolutionary Computation. Unidade: EESC

    Subjects: SCHEDULING, ALGORITMOS DE SCHEDULING, HEURÍSTICA

    Online source accessDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      TAVARES NETO, Roberto Fernandes e NAGANO, Marcelo Seido. An Iterated Greedy approach to integrate production by multiple parallel machines and distribution by a single capacitated vehicle. Swarm and Evolutionary Computation, v. 44, p. 612-621, 2019Tradução . . Disponível em: http://dx.doi.org/10.1016/j.swevo.2018.08.001. Acesso em: 10 ago. 2022.
    • APA

      Tavares Neto, R. F., & Nagano, M. S. (2019). An Iterated Greedy approach to integrate production by multiple parallel machines and distribution by a single capacitated vehicle. Swarm and Evolutionary Computation, 44, 612-621. doi:10.1016/j.swevo.2018.08.001
    • NLM

      Tavares Neto RF, Nagano MS. An Iterated Greedy approach to integrate production by multiple parallel machines and distribution by a single capacitated vehicle [Internet]. Swarm and Evolutionary Computation. 2019 ; 44 612-621.[citado 2022 ago. 10 ] Available from: http://dx.doi.org/10.1016/j.swevo.2018.08.001
    • Vancouver

      Tavares Neto RF, Nagano MS. An Iterated Greedy approach to integrate production by multiple parallel machines and distribution by a single capacitated vehicle [Internet]. Swarm and Evolutionary Computation. 2019 ; 44 612-621.[citado 2022 ago. 10 ] Available from: http://dx.doi.org/10.1016/j.swevo.2018.08.001
  • Unidade: EP

    Subjects: HEURÍSTICA, PETRÓLEO, SCHEDULING

    Online source accessHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      SOUZA, Fernanda Gonçalves. Método meta-heurístico de colônia de formigas e sua aplicação na alocação de petróleo. 2019. Dissertação (Mestrado) – Universidade de São Paulo, São Paulo, 2019. Disponível em: https://teses.usp.br/teses/disponiveis/3/3137/tde-22112019-141951/pt-br.php. Acesso em: 10 ago. 2022.
    • APA

      Souza, F. G. (2019). Método meta-heurístico de colônia de formigas e sua aplicação na alocação de petróleo (Dissertação (Mestrado). Universidade de São Paulo, São Paulo. Recuperado de https://teses.usp.br/teses/disponiveis/3/3137/tde-22112019-141951/pt-br.php
    • NLM

      Souza FG. Método meta-heurístico de colônia de formigas e sua aplicação na alocação de petróleo [Internet]. 2019 ;[citado 2022 ago. 10 ] Available from: https://teses.usp.br/teses/disponiveis/3/3137/tde-22112019-141951/pt-br.php
    • Vancouver

      Souza FG. Método meta-heurístico de colônia de formigas e sua aplicação na alocação de petróleo [Internet]. 2019 ;[citado 2022 ago. 10 ] Available from: https://teses.usp.br/teses/disponiveis/3/3137/tde-22112019-141951/pt-br.php
  • Source: IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems. Unidade: ICMC

    Subjects: CIRCUITOS FPGA, ALGORITMOS GENÉTICOS, COMPUTAÇÃO RECONFIGURÁVEL, ALGORITMOS DE SCHEDULING, SCHEDULING

    Online source accessDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ROSA, Leandro de Souza e BOUGANIS, Christos-Savvas e BONATO, Vanderlei. Scaling up modulo scheduling for high-level synthesis. IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems, v. 38, n. 5, p. 912-925, 2019Tradução . . Disponível em: http://dx.doi.org/10.1109/TCAD.2018.2834440. Acesso em: 10 ago. 2022.
    • APA

      Rosa, L. de S., Bouganis, C. -S., & Bonato, V. (2019). Scaling up modulo scheduling for high-level synthesis. IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems, 38( 5), 912-925. doi:10.1109/TCAD.2018.2834440
    • NLM

      Rosa L de S, Bouganis C-S, Bonato V. Scaling up modulo scheduling for high-level synthesis [Internet]. IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems. 2019 ; 38( 5): 912-925.[citado 2022 ago. 10 ] Available from: http://dx.doi.org/10.1109/TCAD.2018.2834440
    • Vancouver

      Rosa L de S, Bouganis C-S, Bonato V. Scaling up modulo scheduling for high-level synthesis [Internet]. IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems. 2019 ; 38( 5): 912-925.[citado 2022 ago. 10 ] Available from: http://dx.doi.org/10.1109/TCAD.2018.2834440
  • Source: Anais. Conference title: Simpósio Brasileiro de Pesquisa Operacional. Unidades: IME, EP

    Subjects: SCHEDULING, OTIMIZAÇÃO COMBINATÓRIA

    PrivateHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      BIRGIN, Ernesto Julian Goldberg e JESUS FILHO, José Eurípedes Ferreira de e RONCONI, Débora Pretti. Um algoritmo do tipo list scheduling para o problema flowshop minimizando o adiantamento e atraso das tarefas. 2019, Anais.. Rio de Janeiro: SOBRAPO, 2019. Disponível em: https://repositorio.usp.br/directbitstream/fcef5738-1f07-4f21-a24f-888d2242f659/3026922.pdf. Acesso em: 10 ago. 2022.
    • APA

      Birgin, E. J. G., Jesus Filho, J. E. F. de, & Ronconi, D. P. (2019). Um algoritmo do tipo list scheduling para o problema flowshop minimizando o adiantamento e atraso das tarefas. In Anais. Rio de Janeiro: SOBRAPO. Recuperado de https://repositorio.usp.br/directbitstream/fcef5738-1f07-4f21-a24f-888d2242f659/3026922.pdf
    • NLM

      Birgin EJG, Jesus Filho JEF de, Ronconi DP. Um algoritmo do tipo list scheduling para o problema flowshop minimizando o adiantamento e atraso das tarefas [Internet]. Anais. 2019 ;[citado 2022 ago. 10 ] Available from: https://repositorio.usp.br/directbitstream/fcef5738-1f07-4f21-a24f-888d2242f659/3026922.pdf
    • Vancouver

      Birgin EJG, Jesus Filho JEF de, Ronconi DP. Um algoritmo do tipo list scheduling para o problema flowshop minimizando o adiantamento e atraso das tarefas [Internet]. Anais. 2019 ;[citado 2022 ago. 10 ] Available from: https://repositorio.usp.br/directbitstream/fcef5738-1f07-4f21-a24f-888d2242f659/3026922.pdf
  • Source: Engineering Optimization. Unidade: EESC

    Subjects: MANUTENÇÃO PREVENTIVA, HEURÍSTICA, SCHEDULING

    Online source accessDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MIYATA, Hugo Hissashi e NAGANO, Marcelo Seido e GUPTAB, Jatinder N. D. Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study. Engineering Optimization, v. 51, n. 4, 2018Tradução . . Disponível em: http://dx.doi.org/10.1080/0305215X.2018.1485903. Acesso em: 10 ago. 2022.
    • APA

      Miyata, H. H., Nagano, M. S., & Guptab, J. N. D. (2018). Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study. Engineering Optimization, 51( 4). doi:10.1080/0305215X.2018.1485903
    • NLM

      Miyata HH, Nagano MS, Guptab JND. Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study [Internet]. Engineering Optimization. 2018 ; 51( 4):[citado 2022 ago. 10 ] Available from: http://dx.doi.org/10.1080/0305215X.2018.1485903
    • Vancouver

      Miyata HH, Nagano MS, Guptab JND. Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study [Internet]. Engineering Optimization. 2018 ; 51( 4):[citado 2022 ago. 10 ] Available from: http://dx.doi.org/10.1080/0305215X.2018.1485903
  • Unidade: EP

    Subjects: SCHEDULING, PESQUISA OPERACIONAL

    Online source accessHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MOLKE, Augusto Otto. Minimização do atraso total ponderado na programação de máquinas diferentes em paralelo com elegibilidade. 2018. Dissertação (Mestrado) – Universidade de São Paulo, São Paulo, 2018. Disponível em: http://www.teses.usp.br/teses/disponiveis/3/3148/tde-04022019-092016/pt-br.php. Acesso em: 10 ago. 2022.
    • APA

      Molke, A. O. (2018). Minimização do atraso total ponderado na programação de máquinas diferentes em paralelo com elegibilidade (Dissertação (Mestrado). Universidade de São Paulo, São Paulo. Recuperado de http://www.teses.usp.br/teses/disponiveis/3/3148/tde-04022019-092016/pt-br.php
    • NLM

      Molke AO. Minimização do atraso total ponderado na programação de máquinas diferentes em paralelo com elegibilidade [Internet]. 2018 ;[citado 2022 ago. 10 ] Available from: http://www.teses.usp.br/teses/disponiveis/3/3148/tde-04022019-092016/pt-br.php
    • Vancouver

      Molke AO. Minimização do atraso total ponderado na programação de máquinas diferentes em paralelo com elegibilidade [Internet]. 2018 ;[citado 2022 ago. 10 ] Available from: http://www.teses.usp.br/teses/disponiveis/3/3148/tde-04022019-092016/pt-br.php
  • Source: Engineering Optimization. Unidade: EESC

    Subjects: HEURÍSTICA, SCHEDULING

    Online source accessDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      NAGANO, Marcelo Seido e ROSSI, Fernando Luis e MARTARELLI, Nádia Junqueira. High-performing heuristics to minimize flowtime in no-idle permutation flowshop. Engineering Optimization, v. 51, n. 2, 2018Tradução . . Disponível em: http://dx.doi.org/10.1080/0305215X.2018.1444163. Acesso em: 10 ago. 2022.
    • APA

      Nagano, M. S., Rossi, F. L., & Martarelli, N. J. (2018). High-performing heuristics to minimize flowtime in no-idle permutation flowshop. Engineering Optimization, 51( 2). doi:10.1080/0305215X.2018.1444163
    • NLM

      Nagano MS, Rossi FL, Martarelli NJ. High-performing heuristics to minimize flowtime in no-idle permutation flowshop [Internet]. Engineering Optimization. 2018 ; 51( 2):[citado 2022 ago. 10 ] Available from: http://dx.doi.org/10.1080/0305215X.2018.1444163
    • Vancouver

      Nagano MS, Rossi FL, Martarelli NJ. High-performing heuristics to minimize flowtime in no-idle permutation flowshop [Internet]. Engineering Optimization. 2018 ; 51( 2):[citado 2022 ago. 10 ] Available from: http://dx.doi.org/10.1080/0305215X.2018.1444163
  • Unidade: EP

    Subjects: PROGRAMAÇÃO DA PRODUÇÃO, SCHEDULING, HEURÍSTICA

    Online source accessHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      SU, Connie Tenin. Heurísticas construtivas para o problema de programação de projetos com custo de disponibilidade de recursos e custo de penalidade por atraso no término do projeto. 2017. Dissertação (Mestrado) – Universidade de São Paulo, São Paulo, 2017. Disponível em: http://www.teses.usp.br/teses/disponiveis/3/3148/tde-27092017-105107/pt-br.php. Acesso em: 10 ago. 2022.
    • APA

      Su, C. T. (2017). Heurísticas construtivas para o problema de programação de projetos com custo de disponibilidade de recursos e custo de penalidade por atraso no término do projeto (Dissertação (Mestrado). Universidade de São Paulo, São Paulo. Recuperado de http://www.teses.usp.br/teses/disponiveis/3/3148/tde-27092017-105107/pt-br.php
    • NLM

      Su CT. Heurísticas construtivas para o problema de programação de projetos com custo de disponibilidade de recursos e custo de penalidade por atraso no término do projeto [Internet]. 2017 ;[citado 2022 ago. 10 ] Available from: http://www.teses.usp.br/teses/disponiveis/3/3148/tde-27092017-105107/pt-br.php
    • Vancouver

      Su CT. Heurísticas construtivas para o problema de programação de projetos com custo de disponibilidade de recursos e custo de penalidade por atraso no término do projeto [Internet]. 2017 ;[citado 2022 ago. 10 ] Available from: http://www.teses.usp.br/teses/disponiveis/3/3148/tde-27092017-105107/pt-br.php
  • Source: Production Engineering: research and development. Unidade: EESC

    Subjects: SCHEDULING, HEURÍSTICA, PROGRAMAÇÃO DA PRODUÇÃO

    Online source accessDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      NAGANO, Marcelo Seido e ROSSI, Fernando Luis e TOMAZELLA, Caio Paziani. A new efcient heuristic method for minimizing the total tardiness in a no-idle permutation fow shop. Production Engineering: research and development, n. 11, p. 523-529, 2017Tradução . . Disponível em: http://dx.doi.org/10.1007/s11740-017-0747-2. Acesso em: 10 ago. 2022.
    • APA

      Nagano, M. S., Rossi, F. L., & Tomazella, C. P. (2017). A new efcient heuristic method for minimizing the total tardiness in a no-idle permutation fow shop. Production Engineering: research and development, ( 11), 523-529. doi:10.1007/s11740-017-0747-2
    • NLM

      Nagano MS, Rossi FL, Tomazella CP. A new efcient heuristic method for minimizing the total tardiness in a no-idle permutation fow shop [Internet]. Production Engineering: research and development. 2017 ;( 11): 523-529.[citado 2022 ago. 10 ] Available from: http://dx.doi.org/10.1007/s11740-017-0747-2
    • Vancouver

      Nagano MS, Rossi FL, Tomazella CP. A new efcient heuristic method for minimizing the total tardiness in a no-idle permutation fow shop [Internet]. Production Engineering: research and development. 2017 ;( 11): 523-529.[citado 2022 ago. 10 ] Available from: http://dx.doi.org/10.1007/s11740-017-0747-2
  • Unidade: EP

    Subjects: SCHEDULING, HEURÍSTICA, OTIMIZAÇÃO COMBINATÓRIA

    Online source accessHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MAINIERI, Guilherme Barroso. Meta-heurística BRKGA aplicada a um problema de programação de tarefas no ambiente flowshop híbrido. 2014. Tese (Doutorado) – Universidade de São Paulo, São Paulo, 2014. Disponível em: http://www.teses.usp.br/teses/disponiveis/3/3136/tde-26122014-152423/pt-br.php. Acesso em: 10 ago. 2022.
    • APA

      Mainieri, G. B. (2014). Meta-heurística BRKGA aplicada a um problema de programação de tarefas no ambiente flowshop híbrido (Tese (Doutorado). Universidade de São Paulo, São Paulo. Recuperado de http://www.teses.usp.br/teses/disponiveis/3/3136/tde-26122014-152423/pt-br.php
    • NLM

      Mainieri GB. Meta-heurística BRKGA aplicada a um problema de programação de tarefas no ambiente flowshop híbrido [Internet]. 2014 ;[citado 2022 ago. 10 ] Available from: http://www.teses.usp.br/teses/disponiveis/3/3136/tde-26122014-152423/pt-br.php
    • Vancouver

      Mainieri GB. Meta-heurística BRKGA aplicada a um problema de programação de tarefas no ambiente flowshop híbrido [Internet]. 2014 ;[citado 2022 ago. 10 ] Available from: http://www.teses.usp.br/teses/disponiveis/3/3136/tde-26122014-152423/pt-br.php
  • Source: Optimization Letters. Unidades: IME, EP

    Subjects: SCHEDULING, HEURÍSTICA, PROGRAMAÇÃO DA PRODUÇÃO

    Online source accessDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      BIRGIN, Ernesto Julian Goldberg et al. A MILP model for an extended version of the Flexible Job Shop Problem. Optimization Letters, v. 8, n. 4, p. 1417\20131431, 2014Tradução . . Disponível em: http://dx.doi.org/10.1007/s11590-013-0669-7. Acesso em: 10 ago. 2022.
    • APA

      Birgin, E. J. G., Feofiloff, P., Fernandes, C. G., Melo, E. L. de, Oshiro, M. T. I., & Ronconi, D. P. (2014). A MILP model for an extended version of the Flexible Job Shop Problem. Optimization Letters, 8( 4), 1417\20131431. doi:10.1007/s11590-013-0669-7
    • NLM

      Birgin EJG, Feofiloff P, Fernandes CG, Melo EL de, Oshiro MTI, Ronconi DP. A MILP model for an extended version of the Flexible Job Shop Problem [Internet]. Optimization Letters. 2014 ; 8( 4): 1417\20131431.[citado 2022 ago. 10 ] Available from: http://dx.doi.org/10.1007/s11590-013-0669-7
    • Vancouver

      Birgin EJG, Feofiloff P, Fernandes CG, Melo EL de, Oshiro MTI, Ronconi DP. A MILP model for an extended version of the Flexible Job Shop Problem [Internet]. Optimization Letters. 2014 ; 8( 4): 1417\20131431.[citado 2022 ago. 10 ] Available from: http://dx.doi.org/10.1007/s11590-013-0669-7
  • Source: Proceedings. Challenges for sustainable operations. Conference title: International Conference on Production Research - ICPR. Unidade: EP

    Subjects: HEURÍSTICA (MODELOS MATEMÁTICOS;DESEMPENHO), SCHEDULING

    How to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      DAMM, Ricardo de Brito e RONCONI, Débora Pretti e HENRIQUES, Luís Roberto Sant'Anna. Constructive heuristic strategies for the field technician scheduling problem. 2013, Anais.. S.l: ABEPRO, 2013. . Acesso em: 10 ago. 2022.
    • APA

      Damm, R. de B., Ronconi, D. P., & Henriques, L. R. S. 'A. (2013). Constructive heuristic strategies for the field technician scheduling problem. In Proceedings. Challenges for sustainable operations. S.l: ABEPRO.
    • NLM

      Damm R de B, Ronconi DP, Henriques LRS'A. Constructive heuristic strategies for the field technician scheduling problem. Proceedings. Challenges for sustainable operations. 2013 ;[citado 2022 ago. 10 ]
    • Vancouver

      Damm R de B, Ronconi DP, Henriques LRS'A. Constructive heuristic strategies for the field technician scheduling problem. Proceedings. Challenges for sustainable operations. 2013 ;[citado 2022 ago. 10 ]

Digital Library of Intellectual Production of Universidade de São Paulo     2012 - 2022