A hybrid path-relinking method for solving a stochastic lot sizing and scheduling problem (2012)
Fonte: Proceedings. Nome do evento: International Workshop on Model Based Metaheuristics - Matheuristics’2012. Unidade: ICMC
Assuntos: OTIMIZAÇÃO COMBINATÓRIA, PESQUISA OPERACIONAL
ABNT
AMORIM, P et al. A hybrid path-relinking method for solving a stochastic lot sizing and scheduling problem. 2012, Anais.. São Domingos Niterói, RJ: IC/UFF, 2012. . Acesso em: 19 nov. 2024.APA
Amorim, P., Almada-Lobo, B., Costa, A. M., & Costa, A. M. (2012). A hybrid path-relinking method for solving a stochastic lot sizing and scheduling problem. In Proceedings. São Domingos Niterói, RJ: IC/UFF.NLM
Amorim P, Almada-Lobo B, Costa AM, Costa AM. A hybrid path-relinking method for solving a stochastic lot sizing and scheduling problem. Proceedings. 2012 ;[citado 2024 nov. 19 ]Vancouver
Amorim P, Almada-Lobo B, Costa AM, Costa AM. A hybrid path-relinking method for solving a stochastic lot sizing and scheduling problem. Proceedings. 2012 ;[citado 2024 nov. 19 ]