Filtros : "ENGENHARIA DE PRODUÇÃO" "Engineering Optimization" Removido: "Kalatzis, Aquiles Elie Guimarães" Limpar

Filtros



Refine with date range


  • Source: Engineering Optimization. Unidades: EESC, IME

    Assunto: ENGENHARIA DE PRODUÇÃO

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ABREU, Levi Ribeiro de et al. A new variable neighbourhood search with a constraint programming search strategy for the open shop scheduling problem with operation repetitions. Engineering Optimization, v. 54, n. 9, p. 1563-1582, 2022Tradução . . Disponível em: https://doi.org/10.1080/0305215X.2021.1957101. Acesso em: 27 set. 2024.
    • APA

      Abreu, L. R. de, Araújo, K. A. G., Prata, B. de A., Nagano, M. S., & Moccellin, J. V. (2022). A new variable neighbourhood search with a constraint programming search strategy for the open shop scheduling problem with operation repetitions. Engineering Optimization, 54( 9), 1563-1582. doi:10.1080/0305215X.2021.1957101
    • NLM

      Abreu LR de, Araújo KAG, Prata B de A, Nagano MS, Moccellin JV. A new variable neighbourhood search with a constraint programming search strategy for the open shop scheduling problem with operation repetitions [Internet]. Engineering Optimization. 2022 ; 54( 9): 1563-1582.[citado 2024 set. 27 ] Available from: https://doi.org/10.1080/0305215X.2021.1957101
    • Vancouver

      Abreu LR de, Araújo KAG, Prata B de A, Nagano MS, Moccellin JV. A new variable neighbourhood search with a constraint programming search strategy for the open shop scheduling problem with operation repetitions [Internet]. Engineering Optimization. 2022 ; 54( 9): 1563-1582.[citado 2024 set. 27 ] Available from: https://doi.org/10.1080/0305215X.2021.1957101
  • Source: Engineering Optimization. Unidade: EESC

    Subjects: PROGRAMAÇÃO DA PRODUÇÃO, SCHEDULING, ALGORITMOS DE SCHEDULING, ENGENHARIA DE PRODUÇÃO

    Versão PublicadaAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      PRATA, Bruno de Athayde e NAGANO, Marcelo Seido. A novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardiness. Engineering Optimization, p. [1-15], 2022Tradução . . Disponível em: https://doi.org/10.1080/0305215X.2022.2144274. Acesso em: 27 set. 2024.
    • APA

      Prata, B. de A., & Nagano, M. S. (2022). A novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardiness. Engineering Optimization, [1-15]. doi:10.1080/0305215X.2022.2144274
    • NLM

      Prata B de A, Nagano MS. A novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardiness [Internet]. Engineering Optimization. 2022 ; [1-15].[citado 2024 set. 27 ] Available from: https://doi.org/10.1080/0305215X.2022.2144274
    • Vancouver

      Prata B de A, Nagano MS. A novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardiness [Internet]. Engineering Optimization. 2022 ; [1-15].[citado 2024 set. 27 ] Available from: https://doi.org/10.1080/0305215X.2022.2144274
  • Source: Engineering Optimization. Unidade: EESC

    Subjects: ALGORITMOS, PROGRAMAÇÃO DA PRODUÇÃO, ENGENHARIA DE PRODUÇÃO

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      NAGANO, Marcelo Seido e ALMEIDA, Fernando Siqueira de e MIYATA, Hugo Hissashi. An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time. Engineering Optimization, p. [1-20], 2020Tradução . . Disponível em: https://doi.org/10.1080/0305215X.2020.1797000. Acesso em: 27 set. 2024.
    • APA

      Nagano, M. S., Almeida, F. S. de, & Miyata, H. H. (2020). An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time. Engineering Optimization, [1-20]. doi:10.1080/0305215X.2020.1797000
    • NLM

      Nagano MS, Almeida FS de, Miyata HH. An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time [Internet]. Engineering Optimization. 2020 ; [1-20].[citado 2024 set. 27 ] Available from: https://doi.org/10.1080/0305215X.2020.1797000
    • Vancouver

      Nagano MS, Almeida FS de, Miyata HH. An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time [Internet]. Engineering Optimization. 2020 ; [1-20].[citado 2024 set. 27 ] Available from: https://doi.org/10.1080/0305215X.2020.1797000

Digital Library of Intellectual Production of Universidade de São Paulo     2012 - 2024