Solving the permutation flow shop problem with blocking and setup time constraints (2020)
Fonte: International Journal of Industrial Engineering Computations. Unidade: EESC
Assuntos: PROGRAMAÇÃO MATEMÁTICA, ENGENHARIA DE PRODUÇÃO
ABNT
TAKANO, Mauricio Iwama e NAGANO, Marcelo Seido. Solving the permutation flow shop problem with blocking and setup time constraints. International Journal of Industrial Engineering Computations, v. 11, p. 469-480, 2020Tradução . . Disponível em: https://doi.org/10.5267/j.ijiec.2019.11.002. Acesso em: 13 set. 2024.APA
Takano, M. I., & Nagano, M. S. (2020). Solving the permutation flow shop problem with blocking and setup time constraints. International Journal of Industrial Engineering Computations, 11, 469-480. doi:10.5267/j.ijiec.2019.11.002NLM
Takano MI, Nagano MS. Solving the permutation flow shop problem with blocking and setup time constraints [Internet]. International Journal of Industrial Engineering Computations. 2020 ; 11 469-480.[citado 2024 set. 13 ] Available from: https://doi.org/10.5267/j.ijiec.2019.11.002Vancouver
Takano MI, Nagano MS. Solving the permutation flow shop problem with blocking and setup time constraints [Internet]. International Journal of Industrial Engineering Computations. 2020 ; 11 469-480.[citado 2024 set. 13 ] Available from: https://doi.org/10.5267/j.ijiec.2019.11.002