Determining an Optimal Shiftwork Duration by Comparative Analysis of Active and Inactive Hours in Underground Mining: a Case Study (2024)
- Authors:
- USP affiliated authors: TOMI, GIORGIO FRANCESCO CESARE DE - EP ; MORAES, GIOVANNI RUBINICH - EP ; ULLAH, IRFAN - EP
- Unidade: EP
- DOI: 10.1007/s42461-024-01003-4
- Subjects: TRABALHO EM TURNOS; MINERAÇÃO SUBTERRÂNEA
- Language: Inglês
- Imprenta:
- Publisher place: Heidelberger
- Date published: 2024
- Source:
- Título: Mining Metallurgy & Exploration
- Volume/Número/Paginação/Ano: v. 41, p. 1337-1349, 2024
- Este artigo possui versão em acesso aberto
- URL de acesso aberto
- Versão do Documento: Versão submetida (Pré-print)
-
Status: Artigo possui versão em acesso aberto em repositório (Green Open Access) -
ABNT
MORAES, Giovanni Rubinich e ULLAH, Irfan e DE TOMI, Giorgio Francesco Cesare. Determining an Optimal Shiftwork Duration by Comparative Analysis of Active and Inactive Hours in Underground Mining: a Case Study. Mining Metallurgy & Exploration, v. 41, p. 1337-1349, 2024Tradução . . Disponível em: https://doi.org/10.1007/s42461-024-01003-4. Acesso em: 10 mar. 2026. -
APA
Moraes, G. R., Ullah, I., & De Tomi, G. F. C. (2024). Determining an Optimal Shiftwork Duration by Comparative Analysis of Active and Inactive Hours in Underground Mining: a Case Study. Mining Metallurgy & Exploration, 41, 1337-1349. doi:10.1007/s42461-024-01003-4 -
NLM
Moraes GR, Ullah I, De Tomi GFC. Determining an Optimal Shiftwork Duration by Comparative Analysis of Active and Inactive Hours in Underground Mining: a Case Study [Internet]. Mining Metallurgy & Exploration. 2024 ; 41 1337-1349.[citado 2026 mar. 10 ] Available from: https://doi.org/10.1007/s42461-024-01003-4 -
Vancouver
Moraes GR, Ullah I, De Tomi GFC. Determining an Optimal Shiftwork Duration by Comparative Analysis of Active and Inactive Hours in Underground Mining: a Case Study [Internet]. Mining Metallurgy & Exploration. 2024 ; 41 1337-1349.[citado 2026 mar. 10 ] Available from: https://doi.org/10.1007/s42461-024-01003-4 - Stockyard management integrated into short-term mine planning using dynamic block modeling
- Challenges in artisanal small-scale gold mining: perspectives and transformations to sustainability along BR-163 in Brazil
- Determining an optimal shiftwork duration by comparative analysis of active and inactive hours in underground mining: a case study
- Modelagem digital de terrenos. (em CD-Rom)
- Usp e Ibram lançam plataforma para identificar a origem do ouro vendido no Brasil. [Entrevista a Malu Mazza]
- Challenges for the inspection of pre-salt ultra-deep offshore production facilities
- Mining and the sustainable development goals: Prioritizing SDG targets for proper environmental governance.
- Criação da Agência Nacional de Mineração [Divulgação]
- Mining planning integration with dispatch of trucks
- Solución integrada para el control de calidad en canteras de calizas para cemento
Informações sobre a disponibilidade de versões do artigo em acesso aberto coletadas automaticamente via oaDOI API (Unpaywall).
Download do texto completo
| Tipo | Nome | Link | |
|---|---|---|---|
| DE_TOMI-2024-Determining_... |
How to cite
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
