Determining an Optimal Shiftwork Duration by Comparative Analysis of Active and Inactive Hours in Underground Mining: a Case Study (2024)
- Authors:
- USP affiliated authors: TOMI, GIORGIO FRANCESCO CESARE DE - EP ; MORAES, GIOVANNI RUBINICH - EP ; ULLAH, IRFAN - EP
- Unidade: EP
- DOI: 10.1007/s42461-024-01003-4
- Subjects: TRABALHO EM TURNOS; MINERAÇÃO SUBTERRÂNEA
- Language: Inglês
- Imprenta:
- Publisher place: Heidelberger
- Date published: 2024
- Source:
- Título: Mining Metallurgy & Exploration
- Volume/Número/Paginação/Ano: v. 41, p. 1337-1349, 2024
- Este periódico é de assinatura
- Este artigo NÃO é de acesso aberto
- Cor do Acesso Aberto: closed
-
ABNT
MORAES, Giovanni Rubinich e ULLAH, Irfan e DE TOMI, Giorgio Francesco Cesare. Determining an Optimal Shiftwork Duration by Comparative Analysis of Active and Inactive Hours in Underground Mining: a Case Study. Mining Metallurgy & Exploration, v. 41, p. 1337-1349, 2024Tradução . . Disponível em: https://doi.org/10.1007/s42461-024-01003-4. Acesso em: 31 out. 2024. -
APA
Moraes, G. R., Ullah, I., & De Tomi, G. F. C. (2024). Determining an Optimal Shiftwork Duration by Comparative Analysis of Active and Inactive Hours in Underground Mining: a Case Study. Mining Metallurgy & Exploration, 41, 1337-1349. doi:10.1007/s42461-024-01003-4 -
NLM
Moraes GR, Ullah I, De Tomi GFC. Determining an Optimal Shiftwork Duration by Comparative Analysis of Active and Inactive Hours in Underground Mining: a Case Study [Internet]. Mining Metallurgy & Exploration. 2024 ; 41 1337-1349.[citado 2024 out. 31 ] Available from: https://doi.org/10.1007/s42461-024-01003-4 -
Vancouver
Moraes GR, Ullah I, De Tomi GFC. Determining an Optimal Shiftwork Duration by Comparative Analysis of Active and Inactive Hours in Underground Mining: a Case Study [Internet]. Mining Metallurgy & Exploration. 2024 ; 41 1337-1349.[citado 2024 out. 31 ] Available from: https://doi.org/10.1007/s42461-024-01003-4 - Determining an optimal shiftwork duration by comparative analysis of active and inactive hours in underground mining: a case study
- Modelagem digital de terrenos. (em CD-Rom)
- Criação da Agência Nacional de Mineração [Divulgação]
- Economic feasibility of responsible small-scale gold mining
- Utilização de dados do sistema de despacho para estimativa de produtividade de transporte no plano de lavra de curto prazo
- Design of costs-based metrics for enhancing the economics of the mining truck fleet
- Challenges in the feasibility of bituminous shale as a source of oil
- The mine value chain integration beyond the ERP systems
- Metodologia para estimativa e gestão da produtividade de lavra
- Management model PDCA 90-10 applied to open pit mine operations: practical example: Phosphate mine at Araxá, MG-Brasil
Informações sobre o DOI: 10.1007/s42461-024-01003-4 (Fonte: oaDOI API)
How to cite
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas