A comprehensive review of Branch-and-Bound algorithms: guidelines and directions for further research on the flowshop scheduling problem (2020)
- Authors:
- USP affiliated authors: NAGANO, MARCELO SEIDO - EESC ; TOMAZELLA, CAIO PAZIANI - ICMC
- Unidades: EESC; ICMC
- DOI: 10.1016/j.eswa.2020.113556
- Subjects: ENGENHARIA DE PRODUÇÃO; PROGRAMAÇÃO DA PRODUÇÃO; ALGORITMOS
- Language: Inglês
- Imprenta:
- Publisher place: Kidlington, United Kingdon
- Date published: 2020
- Source:
- Título do periódico: Expert Systems with Applications
- ISSN: 0957-4174
- Volume/Número/Paginação/Ano: v. 158, article 113556, p. 1-19, Nov. 2020
- Este periódico é de assinatura
- Este artigo NÃO é de acesso aberto
- Cor do Acesso Aberto: closed
-
ABNT
TOMAZELLA, Caio Paziani e NAGANO, Marcelo Seido. A comprehensive review of Branch-and-Bound algorithms: guidelines and directions for further research on the flowshop scheduling problem. Expert Systems with Applications, v. No 2020, p. 1-19, 2020Tradução . . Disponível em: https://doi.org/10.1016/j.eswa.2020.113556. Acesso em: 29 mar. 2024. -
APA
Tomazella, C. P., & Nagano, M. S. (2020). A comprehensive review of Branch-and-Bound algorithms: guidelines and directions for further research on the flowshop scheduling problem. Expert Systems with Applications, No 2020, 1-19. doi:10.1016/j.eswa.2020.113556 -
NLM
Tomazella CP, Nagano MS. A comprehensive review of Branch-and-Bound algorithms: guidelines and directions for further research on the flowshop scheduling problem [Internet]. Expert Systems with Applications. 2020 ; No 2020 1-19.[citado 2024 mar. 29 ] Available from: https://doi.org/10.1016/j.eswa.2020.113556 -
Vancouver
Tomazella CP, Nagano MS. A comprehensive review of Branch-and-Bound algorithms: guidelines and directions for further research on the flowshop scheduling problem [Internet]. Expert Systems with Applications. 2020 ; No 2020 1-19.[citado 2024 mar. 29 ] Available from: https://doi.org/10.1016/j.eswa.2020.113556 - An improved lower bound for the blocking permutation flow shop with total completion time criterion
- A new efcient heuristic method for minimizing the total tardiness in a no-idle permutation fow shop
- Novos limitantes inferiores para o método branch-and-bound na solução de problemas flowshop permutacional
- A mixed integer model for the integrated lot-sizing and raw material procurement problem with quantity discounts and age-based holding costs
- Service-level-driven procurement and production lot-sizing problem with demand fulfilment
- Avaliação do métodos heurísticos para o problema no-wait flowshop com tempos de setup independentes
- Aplicação de sistemas dinâmicos na previsão de custos da produção
- An evolutionary clustering search for the no-wait flow shop problem with sequence dependent setup times
- O ergonomista, membro da equipe de projeto: percepções sobre a ótica das competências e tipologias de conhecimento
- Identifying critical factors in knowledge creation: a comparative study in technology-based companies
Informações sobre o DOI: 10.1016/j.eswa.2020.113556 (Fonte: oaDOI API)
Download do texto completo
Tipo | Nome | Link | |
---|---|---|---|
1-s2.0-S0957417420303808-... |
How to cite
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas