Framework for integrated project portfolio selection and adjustment (2019)
- Authors:
- Autor USP: CARVALHO, MARLY MONTEIRO DE - EP
- Unidade: EP
- DOI: 10.1109/TEM.2018.2861982
- Subjects: GESTÃO DE PROJETOS; ADMINISTRAÇÃO DE PORTFÓLIO
- Language: Inglês
- Abstract: Project portfolio frameworks usually present the selection and adjustment phases sequentially, lacking the perspective that these phases can be performed iteratively, allowing feedback looping. This paper aims to narrow this gap by investigating the interactions between selection and adjustment phases, and the effects on project portfolio efficiency. Besides, the effect of the control variables—time, effort, and requirements–is investigated along the project design phase. The research approach was based on simulation with five anecdotal projects and real portfolio data gathered in a case-based approach with ten projects. As a result, an integrated portfolio selection and adjustment framework applying data envelopment analysis (DEA) is presented. The dominant portfolios are determined based on mean-Gini selection to construct an efficient frontier comparing return and risk of each one. The proposed framework enables adjustment by evaluating the impact of control variables via two-stage DEA. The results show that the proposed framework indeed increases the number of suitable portfolios. Furthermore, the framework demonstrates how efficiency is impacted by the control variables of a project
- Imprenta:
- Publisher place: Piscataway
- Date published: 2019
- Source:
- Título: IEEE Transactions on Engineering Management
- ISSN: 1558-0040
- Volume/Número/Paginação/Ano: v. 66 , n. 4 , p. 677-688, Nov. 2019
- Este periódico é de acesso aberto
- Este artigo NÃO é de acesso aberto
-
ABNT
MARCONDES, Guilherme Augusto Barucke e LEME, Rafael Coradi e CARVALHO, Marly Monteiro de. Framework for integrated project portfolio selection and adjustment. IEEE Transactions on Engineering Management, v. No 2019, n. 4 , p. 677-688, 2019Tradução . . Disponível em: http://lattes.cnpq.br/1386670520349091. Acesso em: 27 jan. 2026. -
APA
Marcondes, G. A. B., Leme, R. C., & Carvalho, M. M. de. (2019). Framework for integrated project portfolio selection and adjustment. IEEE Transactions on Engineering Management, No 2019( 4 ), 677-688. doi:10.1109/TEM.2018.2861982 -
NLM
Marcondes GAB, Leme RC, Carvalho MM de. Framework for integrated project portfolio selection and adjustment [Internet]. IEEE Transactions on Engineering Management. 2019 ; No 2019( 4 ): 677-688.[citado 2026 jan. 27 ] Available from: http://lattes.cnpq.br/1386670520349091 -
Vancouver
Marcondes GAB, Leme RC, Carvalho MM de. Framework for integrated project portfolio selection and adjustment [Internet]. IEEE Transactions on Engineering Management. 2019 ; No 2019( 4 ): 677-688.[citado 2026 jan. 27 ] Available from: http://lattes.cnpq.br/1386670520349091 - Capacidade inovadora local: análise de duas localidades do Estado de São Paulo
- Alinhamento estratégico de estrutura organizacional de projetos: o caso de uma empresa do segmento eletro-eletrônico
- Economia circular. [Entrevista a Sebastião Garcia]
- Implementacao de programas de gestao da qualidade: o caso da industria textil
- Gerenciamento de risco financeiro: uma metodologia prática para corporações finaceiras
- Estruturas de gerenciamento de projetos e competências em equipes de projetos
- Aplicação do AHP para obtenção da voz do consumidor: o caso de um hotel ecológico
- Gestão de projetos de aplicação WEB: uma abordagem para minimização de incertezas na definição de escopo
- Eficácia em incubadoras de empresas de base tecnológica
- Programas de qualidade seis sigma: características distintas dos modelos DMAIC e DFSS
Informações sobre o DOI: 10.1109/TEM.2018.2861982 (Fonte: oaDOI API)
How to cite
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
