A Brazilian model for project management using an enterprise asset management system integrated to a workflow (2006)
- Authors:
- Autor USP: CARVALHO, MARLY MONTEIRO DE - EP
- Unidade: EP
- Subjects: GESTÃO DE PROJETOS; TRABALHO (FLUXO)
- Language: Inglês
- Abstract: The present work discusses the importance of merge Enterprise Asset Management Systems (EAM), Workflow Systems and Project Management methodologies in order to achieve success in project activities. It also presents the gaps between theory and practical in this field found in the field research developed in a large size brazilian chemical and petrochemical company. This paper attempts to contribute to this existing gap through a project management model developed in the studied organization in the area of project planning and control, presenting. The model allows a better utilization of material and human resources, so as automation of implementation activities, in order to assure information reliability and obtain the project status in real time to enable decision making
- Imprenta:
- Publisher: University of Strathclyde
- Publisher place: Glasgow
- Date published: 2006
- Source:
- Conference titles: International Annual EurOMA Conference
-
ABNT
PADOVANI, Marisa e BIAZZI, Monica Rottmann de e CARVALHO, Marly Monteiro de. A Brazilian model for project management using an enterprise asset management system integrated to a workflow. 2006, Anais.. Glasgow: University of Strathclyde, 2006. Disponível em: https://repositorio.usp.br/directbitstream/9773cae9-48fb-4f4f-838b-5776a7c6c694/Carvalho-2006-brazilian.pdf. Acesso em: 20 jan. 2026. -
APA
Padovani, M., Biazzi, M. R. de, & Carvalho, M. M. de. (2006). A Brazilian model for project management using an enterprise asset management system integrated to a workflow. In Moving up the value chain - EurOMA 2006. Glasgow: University of Strathclyde. Recuperado de https://repositorio.usp.br/directbitstream/9773cae9-48fb-4f4f-838b-5776a7c6c694/Carvalho-2006-brazilian.pdf -
NLM
Padovani M, Biazzi MR de, Carvalho MM de. A Brazilian model for project management using an enterprise asset management system integrated to a workflow [Internet]. Moving up the value chain - EurOMA 2006. 2006 ;[citado 2026 jan. 20 ] Available from: https://repositorio.usp.br/directbitstream/9773cae9-48fb-4f4f-838b-5776a7c6c694/Carvalho-2006-brazilian.pdf -
Vancouver
Padovani M, Biazzi MR de, Carvalho MM de. A Brazilian model for project management using an enterprise asset management system integrated to a workflow [Internet]. Moving up the value chain - EurOMA 2006. 2006 ;[citado 2026 jan. 20 ] Available from: https://repositorio.usp.br/directbitstream/9773cae9-48fb-4f4f-838b-5776a7c6c694/Carvalho-2006-brazilian.pdf - Maturidade em gestão de projetos
- Professora Marly Monteiro de Carvalho está no ranking dos melhores pesquisadores nas áreas de gestão e negócios [Postagem de Cristiane Pereira Rodrigues]
- Critérios de sucesso em projetos: um estudo exploratório considerando a interferência das variáveis tipologia de projetos e stakeholders
- Estratégias de manutenção e remanufatura em frotas de veículos no contexto da economia circular: uma análise financeira e operacional
- Business models and supply chains for the circular economy
- Time-to-need: a portfolio tool to balance the time-to-market
- Sistema produto-serviço e sustentabilide: uma contribuição bibliométrica
- Integrated management systems as a driver of sustainability performance: exploring evidence from multiple-case studies
- Experts’ engagement in risk analysis: a model merging analytic hierarchy process and monte carlo simulation
- Integrated PPM process: scale development and validation
Download do texto completo
| Tipo | Nome | Link | |
|---|---|---|---|
| Carvalho-2006-brazilian.p... |
How to cite
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
