Heuristic methods for the single machine scheduling problem with different ready times and a common due date (2012)
- Authors:
- USP affiliated authors: BIRGIN, ERNESTO JULIAN GOLDBERG - IME ; RONCONI, DEBORA PRETTI - EP
- Unidades: IME; EP
- DOI: 10.1080/0305215X.2011.634409
- Subjects: OTIMIZAÇÃO COMBINATÓRIA; SCHEDULING
- Agências de fomento:
- Language: Inglês
- Imprenta:
- Source:
- Título: Engineering Optimization
- ISSN: 0305-215X
- Volume/Número/Paginação/Ano: v. 44, n. 10, p. 1197-1208, 2012
- Status:
- Artigo possui versão em acesso aberto em repositório (Green Open Access)
- Versão do Documento:
- Versão submetida (Pré-print)
- Acessar versão aberta:
-
ABNT
BIRGIN, Ernesto Julian Goldberg e RONCONI, Débora Pretti. Heuristic methods for the single machine scheduling problem with different ready times and a common due date. Engineering Optimization, v. 44, n. 10, p. 1197-1208, 2012Tradução . . Disponível em: https://doi.org/10.1080/0305215X.2011.634409. Acesso em: 02 abr. 2026. -
APA
Birgin, E. J. G., & Ronconi, D. P. (2012). Heuristic methods for the single machine scheduling problem with different ready times and a common due date. Engineering Optimization, 44( 10), 1197-1208. doi:10.1080/0305215X.2011.634409 -
NLM
Birgin EJG, Ronconi DP. Heuristic methods for the single machine scheduling problem with different ready times and a common due date [Internet]. Engineering Optimization. 2012 ; 44( 10): 1197-1208.[citado 2026 abr. 02 ] Available from: https://doi.org/10.1080/0305215X.2011.634409 -
Vancouver
Birgin EJG, Ronconi DP. Heuristic methods for the single machine scheduling problem with different ready times and a common due date [Internet]. Engineering Optimization. 2012 ; 44( 10): 1197-1208.[citado 2026 abr. 02 ] Available from: https://doi.org/10.1080/0305215X.2011.634409 - Optimizing the packing of cylinders into a rectangular container: a nonlinear approach
- Orthogonal packing of rectangular items within arbitrary convex regions by nonlinear optimization
- Mixed-integer programming models for flowshop scheduling problems minimizing the total earliness and tardiness
- A forward-looking matheuristic approach for the multi-period two-dimensional non-guillotine cutting stock problem with usable leftovers
- Mixed Integer linear programming and constraint programming models for the online printing shop scheduling problem
- Um algoritmo do tipo list scheduling para o problema flowshop minimizando o adiantamento e atraso das tarefas
- MIP models for two-dimensional non-guillotine cutting problems with usable leftovers
- A filtered beam search method for the m-machine permutation flowshop scheduling problem minimizing the earliness and tardiness penalties and the waiting time of the jobs
- Metaheuristics for large-scale instances of the linear ordering problem
- Metaheuristics for the online printing shop scheduling problem
Informações sobre a disponibilidade de versões do artigo em acesso aberto coletadas automaticamente via oaDOI API (Unpaywall).
Por se tratar de integração com serviço externo, podem existir diferentes versões do trabalho (como preprints ou postprints), que podem diferir da versão publicada.
Download do texto completo
| Tipo | Nome | Link | |
|---|---|---|---|
| Ronconi-2012-heuristic.pd... |
How to cite
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
