Fast heuristics for the Steiner tree problem with revenues, budget and hop constraints (2008)
- Autores:
- Autor USP: COSTA, ALYSSON MACHADO - ICMC
- Unidade: ICMC
- DOI: 10.1016/j.ejor.2007.06.012
- Assuntos: HEURÍSTICA; REDES DE COMPUTADORES
- Idioma: Inglês
- Imprenta:
- Fonte:
- Título do periódico: European Journal of Operational Research
- ISSN: 0377-2217
- Volume/Número/Paginação/Ano: v. 190, n. 1, p. 68-78, oct. 2008
- Este periódico é de assinatura
- Este artigo NÃO é de acesso aberto
- Cor do Acesso Aberto: closed
-
ABNT
COSTA, Alysson Machado e CORDEAU, Jean-François e LAPORTE, Gilbert. Fast heuristics for the Steiner tree problem with revenues, budget and hop constraints. European Journal of Operational Research, v. 190, n. 1, p. 68-78, 2008Tradução . . Disponível em: https://doi.org/10.1016/j.ejor.2007.06.012. Acesso em: 19 set. 2024. -
APA
Costa, A. M., Cordeau, J. -F., & Laporte, G. (2008). Fast heuristics for the Steiner tree problem with revenues, budget and hop constraints. European Journal of Operational Research, 190( 1), 68-78. doi:10.1016/j.ejor.2007.06.012 -
NLM
Costa AM, Cordeau J-F, Laporte G. Fast heuristics for the Steiner tree problem with revenues, budget and hop constraints [Internet]. European Journal of Operational Research. 2008 ; 190( 1): 68-78.[citado 2024 set. 19 ] Available from: https://doi.org/10.1016/j.ejor.2007.06.012 -
Vancouver
Costa AM, Cordeau J-F, Laporte G. Fast heuristics for the Steiner tree problem with revenues, budget and hop constraints [Internet]. European Journal of Operational Research. 2008 ; 190( 1): 68-78.[citado 2024 set. 19 ] Available from: https://doi.org/10.1016/j.ejor.2007.06.012 - Melhoria da confiabilidade da rede de distribuição de energia elétrica
- Análise da eficiência de linhas de produção com trabalhadores deficientes
- Optimization of the physical refining of sunflower oil concerning the final contents of trans-fatty acids
- Operations research/management science tools for integrating people with disabilites into employment: a study on Valencia's Sheltered Work Centres for Disabled
- Two extensions for the ALWABP: parallel stations and collaborative approach
- Influence of consumer purchasing behaviour on the production planning of perishable food
- An integer linear programming approach for approximate string comparison
- Production planning in a Beef meat packing plant
- Uma estratégia de solução para o problema de minimização do número máximo de pilhas abertas utilizando o problema do caixeiro viajante
- Extensão do problema ALWABP: melhorando a flexibilidade através de estações paralelas
Informações sobre o DOI: 10.1016/j.ejor.2007.06.012 (Fonte: oaDOI API)
Como citar
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas