Scheduling of a multiproduct pipeline system (2003)
- Authors:
- Autor USP: PINTO, JOSE MAURICIO - EP
- Unidade: EP
- DOI: 10.1016/s0098-1354(03)00049-8
- Subjects: DERIVADOS DE PETRÓLEO; OTIMIZAÇÃO MATEMÁTICA; PETRÓLEO; TUBULAÇÕES
- Language: Inglês
- Imprenta:
- Source:
- Título: Computers and Chemical Engineering
- ISSN: 0098-1354
- Volume/Número/Paginação/Ano: v. 27, n. 8-9, p. 1229-1246, 2003
- Este periódico é de acesso aberto
- Este artigo NÃO é de acesso aberto
-
ABNT
REJOWSKI JUNIOR, Rubens e PINTO, José Maurício. Scheduling of a multiproduct pipeline system. Computers and Chemical Engineering, v. 27, n. 8-9, p. 1229-1246, 2003Tradução . . Disponível em: https://doi.org/10.1016/s0098-1354(03)00049-8. Acesso em: 26 jan. 2026. -
APA
Rejowski Junior, R., & Pinto, J. M. (2003). Scheduling of a multiproduct pipeline system. Computers and Chemical Engineering, 27( 8-9), 1229-1246. doi:10.1016/s0098-1354(03)00049-8 -
NLM
Rejowski Junior R, Pinto JM. Scheduling of a multiproduct pipeline system [Internet]. Computers and Chemical Engineering. 2003 ; 27( 8-9): 1229-1246.[citado 2026 jan. 26 ] Available from: https://doi.org/10.1016/s0098-1354(03)00049-8 -
Vancouver
Rejowski Junior R, Pinto JM. Scheduling of a multiproduct pipeline system [Internet]. Computers and Chemical Engineering. 2003 ; 27( 8-9): 1229-1246.[citado 2026 jan. 26 ] Available from: https://doi.org/10.1016/s0098-1354(03)00049-8 - Modeling of plate heat exchangers with generalized configurantions
- Optimal cyclic scheduling of multistage continuous multiproduct plants
- Efficient MILP formulations for the simultaneous optimal peptide tag design and downstream processing synthesis
- Optimal synthesis of multistep protein purification processes
- Mixed integer programming techniques for the scheduling of fuel oil and asphalt production
- Programação operacional de dutos multi-produtos
- Optimal scheduling of a lube oil and paraffin production plant
- Lagrangean decomposition applied to multiperiod planning of petroleum refineries under uncertainty
- A planning model for the optimal production of a real-world ethylene plant
- A general framework for simultaneous cyclic scheduling and operational optimization of multiproduct continuous plants
Informações sobre o DOI: 10.1016/s0098-1354(03)00049-8 (Fonte: oaDOI API)
How to cite
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas