A hybrid path-relinking method for solving a stochastic lot sizing and scheduling problem (2012)
- Autores:
- Autor USP: COSTA, ALYSSON MACHADO - ICMC
- Unidade: ICMC
- Assuntos: OTIMIZAÇÃO COMBINATÓRIA; PESQUISA OPERACIONAL
- Idioma: Inglês
- Imprenta:
- Editora: IC/UFF
- Local: São Domingos Niterói, RJ
- Data de publicação: 2012
- Fonte:
- Título do periódico: Proceedings
- Nome do evento: International Workshop on Model Based Metaheuristics - Matheuristics’2012
-
ABNT
AMORIM, P et al. A hybrid path-relinking method for solving a stochastic lot sizing and scheduling problem. 2012, Anais.. São Domingos Niterói, RJ: IC/UFF, 2012. . Acesso em: 19 abr. 2024. -
APA
Amorim, P., Almada-Lobo, B., Costa, A. M., & Costa, A. M. (2012). A hybrid path-relinking method for solving a stochastic lot sizing and scheduling problem. In Proceedings. São Domingos Niterói, RJ: IC/UFF. -
NLM
Amorim P, Almada-Lobo B, Costa AM, Costa AM. A hybrid path-relinking method for solving a stochastic lot sizing and scheduling problem. Proceedings. 2012 ;[citado 2024 abr. 19 ] -
Vancouver
Amorim P, Almada-Lobo B, Costa AM, Costa AM. A hybrid path-relinking method for solving a stochastic lot sizing and scheduling problem. Proceedings. 2012 ;[citado 2024 abr. 19 ] - An integer linear programming approach for approximate string comparison
- Production planning in a Beef meat packing plant
- Uma estratégia de solução para o problema de minimização do número máximo de pilhas abertas utilizando o problema do caixeiro viajante
- Two-level network design with intermediate facilities: an application to electrical distribution systems
- Balanceando linhas de produção com trabalhadores deficientes e estações paralelas
- A mathematical model and a hybrid heuristic for sequencing mixed-model assembly lines with disabled workers
- Models and branch-and-cut algorithms for the steiner tree problem with revenues, budget and hop constraints
- Benders, metric and cutset inequalities for multicommodity capacitated network design
- Complexity of decision making with multiple stakeholders
- Job rotation in assembly lines with disabled workers
Como citar
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas