Filtros : "PROGRAMAÇÃO DA PRODUÇÃO" Limpar

Filtros



Limitar por data


  • Unidade: EESC

    Assuntos: ESTOQUES, PROGRAMAÇÃO DA PRODUÇÃO, MODELOS MATEMÁTICOS

    DOIComo citar
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      SOUZA, Raínne Florisbelo Gonçalves de. Optimization approaches for integrating cutting stock and flow shop scheduling with setup times in automotive chassis manufacturing. 2025. Tese (Doutorado) – Universidade de São Paulo, São Carlos, 2025. . Acesso em: 24 nov. 2025.
    • APA

      Souza, R. F. G. de. (2025). Optimization approaches for integrating cutting stock and flow shop scheduling with setup times in automotive chassis manufacturing (Tese (Doutorado). Universidade de São Paulo, São Carlos.
    • NLM

      Souza RFG de. Optimization approaches for integrating cutting stock and flow shop scheduling with setup times in automotive chassis manufacturing. 2025 ;[citado 2025 nov. 24 ]
    • Vancouver

      Souza RFG de. Optimization approaches for integrating cutting stock and flow shop scheduling with setup times in automotive chassis manufacturing. 2025 ;[citado 2025 nov. 24 ]
  • Fonte: Computers and Operations Research. Unidade: EESC

    Assuntos: PESQUISA OPERACIONAL, ALGORITMOS GENÉTICOS, PROGRAMAÇÃO DA PRODUÇÃO, ENGENHARIA DE PRODUÇÃO

    PrivadoAcesso à fonteDOIComo citar
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ROLIM, Gustavo Alencar e NAGANO, Marcelo Seido. Designing state-of-the-art metaheuristics: what have we learned from the parallel-machine scheduling problem with setups?. Computers and Operations Research, v. 182, p. 1-15, 2025Tradução . . Disponível em: https://dx.doi.org/10.1016/j.cor.2025.107110. Acesso em: 24 nov. 2025.
    • APA

      Rolim, G. A., & Nagano, M. S. (2025). Designing state-of-the-art metaheuristics: what have we learned from the parallel-machine scheduling problem with setups? Computers and Operations Research, 182, 1-15. doi:10.1016/j.cor.2025.107110
    • NLM

      Rolim GA, Nagano MS. Designing state-of-the-art metaheuristics: what have we learned from the parallel-machine scheduling problem with setups? [Internet]. Computers and Operations Research. 2025 ; 182 1-15.[citado 2025 nov. 24 ] Available from: https://dx.doi.org/10.1016/j.cor.2025.107110
    • Vancouver

      Rolim GA, Nagano MS. Designing state-of-the-art metaheuristics: what have we learned from the parallel-machine scheduling problem with setups? [Internet]. Computers and Operations Research. 2025 ; 182 1-15.[citado 2025 nov. 24 ] Available from: https://dx.doi.org/10.1016/j.cor.2025.107110
  • Unidade: EP

    Assunto: PROGRAMAÇÃO DA PRODUÇÃO

    Acesso à fonteComo citar
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      SILVA, Bruna Carvalho da. Simheuristics for the limited buffer permutation flow shop problem with random processing times. 2025. Tese (Doutorado) – Universidade de São Paulo, São Paulo, 2025. Disponível em: https://www.teses.usp.br/teses/disponiveis/3/3136/tde-21072025-074929/pt-br.php. Acesso em: 24 nov. 2025.
    • APA

      Silva, B. C. da. (2025). Simheuristics for the limited buffer permutation flow shop problem with random processing times (Tese (Doutorado). Universidade de São Paulo, São Paulo. Recuperado de https://www.teses.usp.br/teses/disponiveis/3/3136/tde-21072025-074929/pt-br.php
    • NLM

      Silva BC da. Simheuristics for the limited buffer permutation flow shop problem with random processing times [Internet]. 2025 ;[citado 2025 nov. 24 ] Available from: https://www.teses.usp.br/teses/disponiveis/3/3136/tde-21072025-074929/pt-br.php
    • Vancouver

      Silva BC da. Simheuristics for the limited buffer permutation flow shop problem with random processing times [Internet]. 2025 ;[citado 2025 nov. 24 ] Available from: https://www.teses.usp.br/teses/disponiveis/3/3136/tde-21072025-074929/pt-br.php
  • Unidade: ICMC

    Assuntos: ALGORITMOS GENÉTICOS, PROGRAMAÇÃO MATEMÁTICA, HEURÍSTICA, VESTUÁRIO, PROGRAMAÇÃO DA PRODUÇÃO, ANÁLISE DE COORTE, PESQUISA OPERACIONAL

    Acesso à fonteAcesso à fonteDOIComo citar
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      HONO, Diego Yoshihiro. O Problema do Empacotamento de Itens Irregulares em Bins. 2024. Dissertação (Mestrado) – Universidade de São Paulo, São Carlos, 2024. Disponível em: https://www.teses.usp.br/teses/disponiveis/55/55134/tde-05062024-155001/. Acesso em: 24 nov. 2025.
    • APA

      Hono, D. Y. (2024). O Problema do Empacotamento de Itens Irregulares em Bins (Dissertação (Mestrado). Universidade de São Paulo, São Carlos. Recuperado de https://www.teses.usp.br/teses/disponiveis/55/55134/tde-05062024-155001/
    • NLM

      Hono DY. O Problema do Empacotamento de Itens Irregulares em Bins [Internet]. 2024 ;[citado 2025 nov. 24 ] Available from: https://www.teses.usp.br/teses/disponiveis/55/55134/tde-05062024-155001/
    • Vancouver

      Hono DY. O Problema do Empacotamento de Itens Irregulares em Bins [Internet]. 2024 ;[citado 2025 nov. 24 ] Available from: https://www.teses.usp.br/teses/disponiveis/55/55134/tde-05062024-155001/
  • Fonte: Journal of Project Management. Unidade: EESC

    Assuntos: HEURÍSTICA, PROGRAMAÇÃO DA PRODUÇÃO, ENGENHARIA DE PRODUÇÃO, SEQUENCIAÇÃO DA PRODUÇÃO

    Versão PublicadaAcesso à fonteDOIComo citar
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      LAURENTYS, Clarissa Tararam de e NAGANO, Marcelo Seido. Evaluating procedures in the NEH heuristic for the PFSP - SIST. Journal of Project Management, v. 9, n. 1, p. 17-26, 2024Tradução . . Disponível em: https://dx.doi.org/10.5267/j.jpm.2023.11.001. Acesso em: 24 nov. 2025.
    • APA

      Laurentys, C. T. de, & Nagano, M. S. (2024). Evaluating procedures in the NEH heuristic for the PFSP - SIST. Journal of Project Management, 9( 1), 17-26. doi:10.5267/j.jpm.2023.11.001
    • NLM

      Laurentys CT de, Nagano MS. Evaluating procedures in the NEH heuristic for the PFSP - SIST [Internet]. Journal of Project Management. 2024 ; 9( 1): 17-26.[citado 2025 nov. 24 ] Available from: https://dx.doi.org/10.5267/j.jpm.2023.11.001
    • Vancouver

      Laurentys CT de, Nagano MS. Evaluating procedures in the NEH heuristic for the PFSP - SIST [Internet]. Journal of Project Management. 2024 ; 9( 1): 17-26.[citado 2025 nov. 24 ] Available from: https://dx.doi.org/10.5267/j.jpm.2023.11.001
  • Unidade: EP

    Assuntos: PESQUISA OPERACIONAL, PLANEJAMENTO DA PRODUÇÃO, PROGRAMAÇÃO DA PRODUÇÃO

    Acesso à fonteComo citar
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      SILVA, Fernanda Karoline. Análise da restrição do tempo de espera limitado em uma modelagem flow shop. 2024. Dissertação (Mestrado) – Universidade de São Paulo, São Paulo, 2024. Disponível em: https://www.teses.usp.br/teses/disponiveis/3/3148/tde-29012025-081947/pt-br.php. Acesso em: 24 nov. 2025.
    • APA

      Silva, F. K. (2024). Análise da restrição do tempo de espera limitado em uma modelagem flow shop (Dissertação (Mestrado). Universidade de São Paulo, São Paulo. Recuperado de https://www.teses.usp.br/teses/disponiveis/3/3148/tde-29012025-081947/pt-br.php
    • NLM

      Silva FK. Análise da restrição do tempo de espera limitado em uma modelagem flow shop [Internet]. 2024 ;[citado 2025 nov. 24 ] Available from: https://www.teses.usp.br/teses/disponiveis/3/3148/tde-29012025-081947/pt-br.php
    • Vancouver

      Silva FK. Análise da restrição do tempo de espera limitado em uma modelagem flow shop [Internet]. 2024 ;[citado 2025 nov. 24 ] Available from: https://www.teses.usp.br/teses/disponiveis/3/3148/tde-29012025-081947/pt-br.php
  • Unidade: EESC

    Assuntos: PROGRAMAÇÃO DA PRODUÇÃO, PROGRAMAÇÃO HEURÍSTICA

    Acesso à fonteAcesso à fonteDOIComo citar
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ROLIM, Gustavo Alencar. Parallel-machine scheduling: variants, formulations, and a critical analysis of metaheuristic approaches. 2024. Tese (Doutorado) – Universidade de São Paulo, São Carlos, 2024. Disponível em: https://www.teses.usp.br/teses/disponiveis/18/18156/tde-25062025-095024/. Acesso em: 24 nov. 2025.
    • APA

      Rolim, G. A. (2024). Parallel-machine scheduling: variants, formulations, and a critical analysis of metaheuristic approaches (Tese (Doutorado). Universidade de São Paulo, São Carlos. Recuperado de https://www.teses.usp.br/teses/disponiveis/18/18156/tde-25062025-095024/
    • NLM

      Rolim GA. Parallel-machine scheduling: variants, formulations, and a critical analysis of metaheuristic approaches [Internet]. 2024 ;[citado 2025 nov. 24 ] Available from: https://www.teses.usp.br/teses/disponiveis/18/18156/tde-25062025-095024/
    • Vancouver

      Rolim GA. Parallel-machine scheduling: variants, formulations, and a critical analysis of metaheuristic approaches [Internet]. 2024 ;[citado 2025 nov. 24 ] Available from: https://www.teses.usp.br/teses/disponiveis/18/18156/tde-25062025-095024/
  • Fonte: Results in Control and Optimization. Unidade: EESC

    Assuntos: PROGRAMAÇÃO DA PRODUÇÃO, INTELIGÊNCIA ARTIFICIAL, BIBLIOMETRIA

    Versão PublicadaAcesso à fonteDOIComo citar
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      PRATA, Bruno de Athayde e ABREU, Levi Ribeiro de e NAGANO, Marcelo Seido. Applications of constraint programming in production scheduling problems: a descriptive bibliometric analysis. Results in Control and Optimization, v. 14, p. 1-17, 2024Tradução . . Disponível em: http://dx.doi.org/10.1016/j.rico.2023.100350. Acesso em: 24 nov. 2025.
    • APA

      Prata, B. de A., Abreu, L. R. de, & Nagano, M. S. (2024). Applications of constraint programming in production scheduling problems: a descriptive bibliometric analysis. Results in Control and Optimization, 14, 1-17. doi:10.1016/j.rico.2023.100350
    • NLM

      Prata B de A, Abreu LR de, Nagano MS. Applications of constraint programming in production scheduling problems: a descriptive bibliometric analysis [Internet]. Results in Control and Optimization. 2024 ; 14 1-17.[citado 2025 nov. 24 ] Available from: http://dx.doi.org/10.1016/j.rico.2023.100350
    • Vancouver

      Prata B de A, Abreu LR de, Nagano MS. Applications of constraint programming in production scheduling problems: a descriptive bibliometric analysis [Internet]. Results in Control and Optimization. 2024 ; 14 1-17.[citado 2025 nov. 24 ] Available from: http://dx.doi.org/10.1016/j.rico.2023.100350
  • Fonte: Journal of Project Management. Unidade: EESC

    Assuntos: PROGRAMAÇÃO DA PRODUÇÃO, HEURÍSTICA, ENGENHARIA DE PRODUÇÃO

    Versão PublicadaAcesso à fonteDOIComo citar
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      NAGANO, Marcelo Seido e ROSSI, Fernando Luis. A two-stage iterated greedy algorithm and a multi-objective constructive heuristic for the mixed no-idle flowshop scheduling problem to minimize makespan subject to total completion time. Journal of Project Management, v. 9, n. 1, p. 45-60, 2024Tradução . . Disponível em: https://dx.doi.org/10.5267/j.jpm.2023.9.001. Acesso em: 24 nov. 2025.
    • APA

      Nagano, M. S., & Rossi, F. L. (2024). A two-stage iterated greedy algorithm and a multi-objective constructive heuristic for the mixed no-idle flowshop scheduling problem to minimize makespan subject to total completion time. Journal of Project Management, 9( 1), 45-60. doi:10.5267/j.jpm.2023.9.001
    • NLM

      Nagano MS, Rossi FL. A two-stage iterated greedy algorithm and a multi-objective constructive heuristic for the mixed no-idle flowshop scheduling problem to minimize makespan subject to total completion time [Internet]. Journal of Project Management. 2024 ; 9( 1): 45-60.[citado 2025 nov. 24 ] Available from: https://dx.doi.org/10.5267/j.jpm.2023.9.001
    • Vancouver

      Nagano MS, Rossi FL. A two-stage iterated greedy algorithm and a multi-objective constructive heuristic for the mixed no-idle flowshop scheduling problem to minimize makespan subject to total completion time [Internet]. Journal of Project Management. 2024 ; 9( 1): 45-60.[citado 2025 nov. 24 ] Available from: https://dx.doi.org/10.5267/j.jpm.2023.9.001
  • Unidade: EESC

    Assuntos: ALGORITMOS DE APROXIMAÇÃO, MODELOS MATEMÁTICOS, PROGRAMAÇÃO DA PRODUÇÃO

    Acesso à fonteAcesso à fonteDOIComo citar
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ABREU, Levi Ribeiro de. Contributions to new variants of the open shop scheduling problem: modeling and solution methods. 2023. Tese (Doutorado) – Universidade de São Paulo, São Carlos, 2023. Disponível em: https://www.teses.usp.br/teses/disponiveis/18/18156/tde-19052023-162053/. Acesso em: 24 nov. 2025.
    • APA

      Abreu, L. R. de. (2023). Contributions to new variants of the open shop scheduling problem: modeling and solution methods (Tese (Doutorado). Universidade de São Paulo, São Carlos. Recuperado de https://www.teses.usp.br/teses/disponiveis/18/18156/tde-19052023-162053/
    • NLM

      Abreu LR de. Contributions to new variants of the open shop scheduling problem: modeling and solution methods [Internet]. 2023 ;[citado 2025 nov. 24 ] Available from: https://www.teses.usp.br/teses/disponiveis/18/18156/tde-19052023-162053/
    • Vancouver

      Abreu LR de. Contributions to new variants of the open shop scheduling problem: modeling and solution methods [Internet]. 2023 ;[citado 2025 nov. 24 ] Available from: https://www.teses.usp.br/teses/disponiveis/18/18156/tde-19052023-162053/
  • Fonte: Journal of Project Management. Unidade: EESC

    Assuntos: PROGRAMAÇÃO DA PRODUÇÃO, PROGRAMAÇÃO DINÂMICA, ENGENHARIA DE PRODUÇÃO

    Versão PublicadaAcesso à fonteDOIComo citar
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      SOUZA, Edson Antonio Gonçalves de et al. Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times. Journal of Project Management, v. 8, n. 2, p. 99-118, 2023Tradução . . Disponível em: https://dx.doi.org/10.5267/j.jpm.2022.12.001. Acesso em: 24 nov. 2025.
    • APA

      Souza, E. A. G. de, Nagano, M. S., Miyata, H. H., & Abreu, L. R. de. (2023). Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times. Journal of Project Management, 8( 2), 99-118. doi:10.5267/j.jpm.2022.12.001
    • NLM

      Souza EAG de, Nagano MS, Miyata HH, Abreu LR de. Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times [Internet]. Journal of Project Management. 2023 ; 8( 2): 99-118.[citado 2025 nov. 24 ] Available from: https://dx.doi.org/10.5267/j.jpm.2022.12.001
    • Vancouver

      Souza EAG de, Nagano MS, Miyata HH, Abreu LR de. Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times [Internet]. Journal of Project Management. 2023 ; 8( 2): 99-118.[citado 2025 nov. 24 ] Available from: https://dx.doi.org/10.5267/j.jpm.2022.12.001
  • Fonte: International Journal of Production Research. Unidade: EESC

    Assuntos: ENGENHARIA DE PRODUÇÃO, PROGRAMAÇÃO DA PRODUÇÃO, ALGORITMOS

    PrivadoAcesso à fonteDOIComo citar
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ABREU, Levi R. e NAGANO, Marcelo Seido e PRATA, Bruno A. A new two-stage constraint programming approach for open shop scheduling problem with machine blocking. International Journal of Production Research, 2022Tradução . . Disponível em: https://doi.org/10.1080/00207543.2022.2154404. Acesso em: 24 nov. 2025.
    • APA

      Abreu, L. R., Nagano, M. S., & Prata, B. A. (2022). A new two-stage constraint programming approach for open shop scheduling problem with machine blocking. International Journal of Production Research. doi:10.1080/00207543.2022.2154404
    • NLM

      Abreu LR, Nagano MS, Prata BA. A new two-stage constraint programming approach for open shop scheduling problem with machine blocking [Internet]. International Journal of Production Research. 2022 ;[citado 2025 nov. 24 ] Available from: https://doi.org/10.1080/00207543.2022.2154404
    • Vancouver

      Abreu LR, Nagano MS, Prata BA. A new two-stage constraint programming approach for open shop scheduling problem with machine blocking [Internet]. International Journal of Production Research. 2022 ;[citado 2025 nov. 24 ] Available from: https://doi.org/10.1080/00207543.2022.2154404
  • Fonte: Computers & Industrial Engineering. Unidade: EP

    Assuntos: CONTROLE DE ESTOQUES, PROGRAMAÇÃO DA PRODUÇÃO, PESQUISA OPERACIONAL

    PrivadoAcesso à fonteDOIComo citar
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MESQUITA, Marco Aurélio de e TOMOTANI, João Vitor. Simulation-optimization of inventory control of multiple products on a single machine with sequence-dependent setup times. Computers & Industrial Engineering, v. 174, p. 10 on-line, 2022Tradução . . Disponível em: https://doi.org/10.1016/j.cie.2022.108793. Acesso em: 24 nov. 2025.
    • APA

      Mesquita, M. A. de, & Tomotani, J. V. (2022). Simulation-optimization of inventory control of multiple products on a single machine with sequence-dependent setup times. Computers & Industrial Engineering, 174, 10 on-line. doi:10.1016/j.cie.2022.108793
    • NLM

      Mesquita MA de, Tomotani JV. Simulation-optimization of inventory control of multiple products on a single machine with sequence-dependent setup times [Internet]. Computers & Industrial Engineering. 2022 ; 174 10 on-line.[citado 2025 nov. 24 ] Available from: https://doi.org/10.1016/j.cie.2022.108793
    • Vancouver

      Mesquita MA de, Tomotani JV. Simulation-optimization of inventory control of multiple products on a single machine with sequence-dependent setup times [Internet]. Computers & Industrial Engineering. 2022 ; 174 10 on-line.[citado 2025 nov. 24 ] Available from: https://doi.org/10.1016/j.cie.2022.108793
  • Fonte: Livro de Resumos Expandidos. Nome do evento: Simpósio Internacional de Iniciação Científica e Tecnológica da Universidade de São Paulo - SIICUSP. Unidade: EESC

    Assuntos: PROGRAMAÇÃO DA PRODUÇÃO, HEURÍSTICA, ENGENHARIA DE PRODUÇÃO

    Versão PublicadaAcesso à fonteComo citar
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      VERZELLONI, João Victor Pascualote e NAGANO, Marcelo Seido. Heurística ALNS para problemas de programação de no-wait flowshop mistos. 2022, Anais.. São Carlos, SP: EESC/USP, 2022. Disponível em: http://soac.eesc.usp.br/index.php/siicusp/30siicusp/paper/viewFile/3526/2355. Acesso em: 24 nov. 2025.
    • APA

      Verzelloni, J. V. P., & Nagano, M. S. (2022). Heurística ALNS para problemas de programação de no-wait flowshop mistos. In Livro de Resumos Expandidos. São Carlos, SP: EESC/USP. Recuperado de http://soac.eesc.usp.br/index.php/siicusp/30siicusp/paper/viewFile/3526/2355
    • NLM

      Verzelloni JVP, Nagano MS. Heurística ALNS para problemas de programação de no-wait flowshop mistos [Internet]. Livro de Resumos Expandidos. 2022 ;[citado 2025 nov. 24 ] Available from: http://soac.eesc.usp.br/index.php/siicusp/30siicusp/paper/viewFile/3526/2355
    • Vancouver

      Verzelloni JVP, Nagano MS. Heurística ALNS para problemas de programação de no-wait flowshop mistos [Internet]. Livro de Resumos Expandidos. 2022 ;[citado 2025 nov. 24 ] Available from: http://soac.eesc.usp.br/index.php/siicusp/30siicusp/paper/viewFile/3526/2355
  • Fonte: Engineering Optimization. Unidade: EESC

    Assuntos: PROGRAMAÇÃO DA PRODUÇÃO, SCHEDULING, ALGORITMOS DE SCHEDULING, ENGENHARIA DE PRODUÇÃO

    Versão PublicadaAcesso à fonteDOIComo citar
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      PRATA, Bruno de Athayde e NAGANO, Marcelo Seido. A novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardiness. Engineering Optimization, p. [1-15], 2022Tradução . . Disponível em: https://doi.org/10.1080/0305215X.2022.2144274. Acesso em: 24 nov. 2025.
    • APA

      Prata, B. de A., & Nagano, M. S. (2022). A novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardiness. Engineering Optimization, [1-15]. doi:10.1080/0305215X.2022.2144274
    • NLM

      Prata B de A, Nagano MS. A novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardiness [Internet]. Engineering Optimization. 2022 ; [1-15].[citado 2025 nov. 24 ] Available from: https://doi.org/10.1080/0305215X.2022.2144274
    • Vancouver

      Prata B de A, Nagano MS. A novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardiness [Internet]. Engineering Optimization. 2022 ; [1-15].[citado 2025 nov. 24 ] Available from: https://doi.org/10.1080/0305215X.2022.2144274
  • Unidade: EESC

    Assuntos: HEURÍSTICA, PROGRAMAÇÃO DA PRODUÇÃO, SEQUENCIAÇÃO DA PRODUÇÃO, TEMPO

    Acesso à fonteAcesso à fonteDOIComo citar
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ALMEIDA, Fernando Siqueira de. Heuristics for multi-objective no-wait flow shops with sequence-dependent setup times. 2021. Dissertação (Mestrado) – Universidade de São Paulo, São Carlos, 2021. Disponível em: https://www.teses.usp.br/teses/disponiveis/18/18156/tde-07122021-164135/. Acesso em: 24 nov. 2025.
    • APA

      Almeida, F. S. de. (2021). Heuristics for multi-objective no-wait flow shops with sequence-dependent setup times (Dissertação (Mestrado). Universidade de São Paulo, São Carlos. Recuperado de https://www.teses.usp.br/teses/disponiveis/18/18156/tde-07122021-164135/
    • NLM

      Almeida FS de. Heuristics for multi-objective no-wait flow shops with sequence-dependent setup times [Internet]. 2021 ;[citado 2025 nov. 24 ] Available from: https://www.teses.usp.br/teses/disponiveis/18/18156/tde-07122021-164135/
    • Vancouver

      Almeida FS de. Heuristics for multi-objective no-wait flow shops with sequence-dependent setup times [Internet]. 2021 ;[citado 2025 nov. 24 ] Available from: https://www.teses.usp.br/teses/disponiveis/18/18156/tde-07122021-164135/
  • Unidade: EESC

    Assuntos: SCHEDULING, SEQUENCIAÇÃO DA PRODUÇÃO, HEURÍSTICA, PROGRAMAÇÃO DA PRODUÇÃO

    Acesso à fonteAcesso à fonteDOIComo citar
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      REIS, Viviane Souza Viléla Junqueira dos. The no-wait flow shop scheduling problem with sequence-dependent setup times: a comprehensive review and an application of the ALNS algorithm. 2021. Dissertação (Mestrado) – Universidade de São Paulo, São Carlos, 2021. Disponível em: https://www.teses.usp.br/teses/disponiveis/18/18156/tde-17082023-144657/. Acesso em: 24 nov. 2025.
    • APA

      Reis, V. S. V. J. dos. (2021). The no-wait flow shop scheduling problem with sequence-dependent setup times: a comprehensive review and an application of the ALNS algorithm (Dissertação (Mestrado). Universidade de São Paulo, São Carlos. Recuperado de https://www.teses.usp.br/teses/disponiveis/18/18156/tde-17082023-144657/
    • NLM

      Reis VSVJ dos. The no-wait flow shop scheduling problem with sequence-dependent setup times: a comprehensive review and an application of the ALNS algorithm [Internet]. 2021 ;[citado 2025 nov. 24 ] Available from: https://www.teses.usp.br/teses/disponiveis/18/18156/tde-17082023-144657/
    • Vancouver

      Reis VSVJ dos. The no-wait flow shop scheduling problem with sequence-dependent setup times: a comprehensive review and an application of the ALNS algorithm [Internet]. 2021 ;[citado 2025 nov. 24 ] Available from: https://www.teses.usp.br/teses/disponiveis/18/18156/tde-17082023-144657/
  • Fonte: Journal of Manufacturing Systems. Unidade: EESC

    Assuntos: PROGRAMAÇÃO DA PRODUÇÃO, QUALIDADE DA PRODUÇÃO, ENGENHARIA DE PRODUÇÃO

    PrivadoAcesso à fonteDOIComo citar
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MIYATA, Hugo Hissashi e NAGANO, Marcelo Seido. Optimizing distributed no-wait flow shop scheduling problem with setup times and maintenance operations via iterated greedy algorithm. Journal of Manufacturing Systems, v. 61, p. 592-612, 2021Tradução . . Disponível em: https://doi.org/10.1016/j.jmsy.2021.10.005. Acesso em: 24 nov. 2025.
    • APA

      Miyata, H. H., & Nagano, M. S. (2021). Optimizing distributed no-wait flow shop scheduling problem with setup times and maintenance operations via iterated greedy algorithm. Journal of Manufacturing Systems, 61, 592-612. doi:10.1016/j.jmsy.2021.10.005
    • NLM

      Miyata HH, Nagano MS. Optimizing distributed no-wait flow shop scheduling problem with setup times and maintenance operations via iterated greedy algorithm [Internet]. Journal of Manufacturing Systems. 2021 ; 61 592-612.[citado 2025 nov. 24 ] Available from: https://doi.org/10.1016/j.jmsy.2021.10.005
    • Vancouver

      Miyata HH, Nagano MS. Optimizing distributed no-wait flow shop scheduling problem with setup times and maintenance operations via iterated greedy algorithm [Internet]. Journal of Manufacturing Systems. 2021 ; 61 592-612.[citado 2025 nov. 24 ] Available from: https://doi.org/10.1016/j.jmsy.2021.10.005
  • Unidade: EP

    Assuntos: CONTROLE DE ESTOQUES, PROGRAMAÇÃO DA PRODUÇÃO, PESQUISA OPERACIONAL

    Acesso à fonteComo citar
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      TOMOTANI, João Vitor. Aplicação do método de simulação e otimização ao problema de dimensionamento e sequenciamento de lotes de produção. 2021. Dissertação (Mestrado) – Universidade de São Paulo, São Paulo, 2021. Disponível em: https://www.teses.usp.br/teses/disponiveis/3/3136/tde-04032022-090208/. Acesso em: 24 nov. 2025.
    • APA

      Tomotani, J. V. (2021). Aplicação do método de simulação e otimização ao problema de dimensionamento e sequenciamento de lotes de produção (Dissertação (Mestrado). Universidade de São Paulo, São Paulo. Recuperado de https://www.teses.usp.br/teses/disponiveis/3/3136/tde-04032022-090208/
    • NLM

      Tomotani JV. Aplicação do método de simulação e otimização ao problema de dimensionamento e sequenciamento de lotes de produção [Internet]. 2021 ;[citado 2025 nov. 24 ] Available from: https://www.teses.usp.br/teses/disponiveis/3/3136/tde-04032022-090208/
    • Vancouver

      Tomotani JV. Aplicação do método de simulação e otimização ao problema de dimensionamento e sequenciamento de lotes de produção [Internet]. 2021 ;[citado 2025 nov. 24 ] Available from: https://www.teses.usp.br/teses/disponiveis/3/3136/tde-04032022-090208/
  • Fonte: Computers & Industrial Engineering. Unidade: EESC

    Assuntos: PROGRAMAÇÃO DA PRODUÇÃO, ALGORITMOS DE SCHEDULING, ENGENHARIA DE PRODUÇÃO

    PrivadoAcesso à fonteDOIComo citar
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      ROSSI, Fernando Luis e NAGANO, Marcelo Seido. Heuristics and iterated greedy algorithms for the distributed mixed no-idle flowshop with sequence-dependent setup times. Computers & Industrial Engineering, v. 157, p. 1-16, 2021Tradução . . Disponível em: https://doi.org/10.1016/j.cie.2021.107337. Acesso em: 24 nov. 2025.
    • APA

      Rossi, F. L., & Nagano, M. S. (2021). Heuristics and iterated greedy algorithms for the distributed mixed no-idle flowshop with sequence-dependent setup times. Computers & Industrial Engineering, 157, 1-16. doi:10.1016/j.cie.2021.107337
    • NLM

      Rossi FL, Nagano MS. Heuristics and iterated greedy algorithms for the distributed mixed no-idle flowshop with sequence-dependent setup times [Internet]. Computers & Industrial Engineering. 2021 ; 157 1-16.[citado 2025 nov. 24 ] Available from: https://doi.org/10.1016/j.cie.2021.107337
    • Vancouver

      Rossi FL, Nagano MS. Heuristics and iterated greedy algorithms for the distributed mixed no-idle flowshop with sequence-dependent setup times [Internet]. Computers & Industrial Engineering. 2021 ; 157 1-16.[citado 2025 nov. 24 ] Available from: https://doi.org/10.1016/j.cie.2021.107337

Biblioteca Digital de Produção Intelectual da Universidade de São Paulo     2012 - 2025