Source: Cogent Engineering. Unidade: EESC
Subjects: PROGRAMAÇÃO DA PRODUÇÃO, TEMPO
A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
ABNT
TAKANO, Mauricio Iwama e NAGANO, Marcelo Seido. A branch-and-bound method to minimize the makespan in a permutation flow shop with blocking and setup times. Cogent Engineering, v. 4, 2017Tradução . . Disponível em: https://doi.org/10.1080/23311916.2017.1389638. Acesso em: 15 out. 2024.APA
Takano, M. I., & Nagano, M. S. (2017). A branch-and-bound method to minimize the makespan in a permutation flow shop with blocking and setup times. Cogent Engineering, 4. doi:10.1080/23311916.2017.1389638NLM
Takano MI, Nagano MS. A branch-and-bound method to minimize the makespan in a permutation flow shop with blocking and setup times [Internet]. Cogent Engineering. 2017 ; 4[citado 2024 out. 15 ] Available from: https://doi.org/10.1080/23311916.2017.1389638Vancouver
Takano MI, Nagano MS. A branch-and-bound method to minimize the makespan in a permutation flow shop with blocking and setup times [Internet]. Cogent Engineering. 2017 ; 4[citado 2024 out. 15 ] Available from: https://doi.org/10.1080/23311916.2017.1389638