Filtros : "MIYATA, HUGO HISSASHI" Limpar

Filtros



Refine with date range


  • Source: Journal of Project Management. Unidade: EESC

    Subjects: PROGRAMAÇÃO DA PRODUÇÃO, PROGRAMAÇÃO DINÂMICA, ENGENHARIA DE PRODUÇÃO

    Versão PublicadaAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      SOUZA, Edson Antonio Gonçalves de et al. Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times. Journal of Project Management, v. 8, n. 2, p. 99-118, 2023Tradução . . Disponível em: https://dx.doi.org/10.5267/j.jpm.2022.12.001. Acesso em: 29 set. 2024.
    • APA

      Souza, E. A. G. de, Nagano, M. S., Miyata, H. H., & Abreu, L. R. de. (2023). Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times. Journal of Project Management, 8( 2), 99-118. doi:10.5267/j.jpm.2022.12.001
    • NLM

      Souza EAG de, Nagano MS, Miyata HH, Abreu LR de. Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times [Internet]. Journal of Project Management. 2023 ; 8( 2): 99-118.[citado 2024 set. 29 ] Available from: https://dx.doi.org/10.5267/j.jpm.2022.12.001
    • Vancouver

      Souza EAG de, Nagano MS, Miyata HH, Abreu LR de. Bounded dynamic programming approach to minimize makespan in the blocking flowshop problem with sequence dependent setup times [Internet]. Journal of Project Management. 2023 ; 8( 2): 99-118.[citado 2024 set. 29 ] Available from: https://dx.doi.org/10.5267/j.jpm.2022.12.001
  • Source: International Journal of Production Research. Unidade: EESC

    Subjects: SEQUENCIAÇÃO DA PRODUÇÃO, SCHEDULING, PROGRAMAÇÃO LINEAR, ENGENHARIA DE PRODUÇÃO

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MIYATA, Hugo Hissashi e NAGANO, Marcelo Seido e GUPTA, Jatinder N. D. Solutions methods for m-machine blocking flow shop with setup times and preventive maintenance costs to minimise hierarchical objective-function. International Journal of Production Research, p. 1-29, 2022Tradução . . Disponível em: https://doi.org/10.1080/00207543.2022.2127959. Acesso em: 29 set. 2024.
    • APA

      Miyata, H. H., Nagano, M. S., & Gupta, J. N. D. (2022). Solutions methods for m-machine blocking flow shop with setup times and preventive maintenance costs to minimise hierarchical objective-function. International Journal of Production Research, 1-29. doi:10.1080/00207543.2022.2127959
    • NLM

      Miyata HH, Nagano MS, Gupta JND. Solutions methods for m-machine blocking flow shop with setup times and preventive maintenance costs to minimise hierarchical objective-function [Internet]. International Journal of Production Research. 2022 ; 1-29.[citado 2024 set. 29 ] Available from: https://doi.org/10.1080/00207543.2022.2127959
    • Vancouver

      Miyata HH, Nagano MS, Gupta JND. Solutions methods for m-machine blocking flow shop with setup times and preventive maintenance costs to minimise hierarchical objective-function [Internet]. International Journal of Production Research. 2022 ; 1-29.[citado 2024 set. 29 ] Available from: https://doi.org/10.1080/00207543.2022.2127959
  • Source: Computers & Industrial Engineering. Unidade: EESC

    Subjects: SEQUENCIAÇÃO DA PRODUÇÃO, SCHEDULING, ENGENHARIA DE PRODUÇÃO

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MIYATA, Hugo Hissashi e NAGANO, Marcelo Seido. An iterated greedy algorithm for distributed blocking flow shop with setup times and maintenance operations to minimize makespan. Computers & Industrial Engineering, v. 171, p. 1-25, 2022Tradução . . Disponível em: https://doi.org/10.1016/j.cie.2022.108366. Acesso em: 29 set. 2024.
    • APA

      Miyata, H. H., & Nagano, M. S. (2022). An iterated greedy algorithm for distributed blocking flow shop with setup times and maintenance operations to minimize makespan. Computers & Industrial Engineering, 171, 1-25. doi:10.1016/j.cie.2022.108366
    • NLM

      Miyata HH, Nagano MS. An iterated greedy algorithm for distributed blocking flow shop with setup times and maintenance operations to minimize makespan [Internet]. Computers & Industrial Engineering. 2022 ; 171 1-25.[citado 2024 set. 29 ] Available from: https://doi.org/10.1016/j.cie.2022.108366
    • Vancouver

      Miyata HH, Nagano MS. An iterated greedy algorithm for distributed blocking flow shop with setup times and maintenance operations to minimize makespan [Internet]. Computers & Industrial Engineering. 2022 ; 171 1-25.[citado 2024 set. 29 ] Available from: https://doi.org/10.1016/j.cie.2022.108366
  • Source: Journal of Manufacturing Systems. Unidade: EESC

    Subjects: PROGRAMAÇÃO DA PRODUÇÃO, QUALIDADE DA PRODUÇÃO, ENGENHARIA DE PRODUÇÃO

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MIYATA, Hugo Hissashi e NAGANO, Marcelo Seido. Optimizing distributed no-wait flow shop scheduling problem with setup times and maintenance operations via iterated greedy algorithm. Journal of Manufacturing Systems, v. 61, p. 592-612, 2021Tradução . . Disponível em: https://doi.org/10.1016/j.jmsy.2021.10.005. Acesso em: 29 set. 2024.
    • APA

      Miyata, H. H., & Nagano, M. S. (2021). Optimizing distributed no-wait flow shop scheduling problem with setup times and maintenance operations via iterated greedy algorithm. Journal of Manufacturing Systems, 61, 592-612. doi:10.1016/j.jmsy.2021.10.005
    • NLM

      Miyata HH, Nagano MS. Optimizing distributed no-wait flow shop scheduling problem with setup times and maintenance operations via iterated greedy algorithm [Internet]. Journal of Manufacturing Systems. 2021 ; 61 592-612.[citado 2024 set. 29 ] Available from: https://doi.org/10.1016/j.jmsy.2021.10.005
    • Vancouver

      Miyata HH, Nagano MS. Optimizing distributed no-wait flow shop scheduling problem with setup times and maintenance operations via iterated greedy algorithm [Internet]. Journal of Manufacturing Systems. 2021 ; 61 592-612.[citado 2024 set. 29 ] Available from: https://doi.org/10.1016/j.jmsy.2021.10.005
  • Source: International Journal of Industrial Engineering Computations. Unidade: EESC

    Subjects: SISTEMAS DE PRODUÇÃO, PROGRAMAÇÃO DA PRODUÇÃO, MANUTENÇÃO PREVENTIVA, HEURÍSTICA

    Versão PublicadaAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      YAMADA, Tuane Tonani e NAGANO, Marcelo Seido e MIYATA, Hugo Hissashi. Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance. International Journal of Industrial Engineering Computations, v. 12, p. 415-426, 2021Tradução . . Disponível em: https://doi.org/10.5267/j.ijiec.2021.5.002. Acesso em: 29 set. 2024.
    • APA

      Yamada, T. T., Nagano, M. S., & Miyata, H. H. (2021). Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance. International Journal of Industrial Engineering Computations, 12, 415-426. doi:10.5267/j.ijiec.2021.5.002
    • NLM

      Yamada TT, Nagano MS, Miyata HH. Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance [Internet]. International Journal of Industrial Engineering Computations. 2021 ; 12 415-426.[citado 2024 set. 29 ] Available from: https://doi.org/10.5267/j.ijiec.2021.5.002
    • Vancouver

      Yamada TT, Nagano MS, Miyata HH. Minimization of total tardiness in no-wait flowshop production systems with preventive maintenance [Internet]. International Journal of Industrial Engineering Computations. 2021 ; 12 415-426.[citado 2024 set. 29 ] Available from: https://doi.org/10.5267/j.ijiec.2021.5.002
  • Unidade: EESC

    Subjects: MANUFATURA, SEQUENCIAÇÃO DA PRODUÇÃO, PROGRAMAÇÃO LINEAR

    Acesso à fonteHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MIYATA, Hugo Hissashi. Contribuições para o problema flow shop com bloqueio, tempos de setup dependentes da sequência e funções-objetivo hierárquicas sujeitas ao custo total de manutenção preventiva. 2020. Tese (Doutorado) – Universidade de São Paulo, São Carlos, 2020. Disponível em: https://www.teses.usp.br/teses/disponiveis/18/18156/tde-05032020-085433/. Acesso em: 29 set. 2024.
    • APA

      Miyata, H. H. (2020). Contribuições para o problema flow shop com bloqueio, tempos de setup dependentes da sequência e funções-objetivo hierárquicas sujeitas ao custo total de manutenção preventiva (Tese (Doutorado). Universidade de São Paulo, São Carlos. Recuperado de https://www.teses.usp.br/teses/disponiveis/18/18156/tde-05032020-085433/
    • NLM

      Miyata HH. Contribuições para o problema flow shop com bloqueio, tempos de setup dependentes da sequência e funções-objetivo hierárquicas sujeitas ao custo total de manutenção preventiva [Internet]. 2020 ;[citado 2024 set. 29 ] Available from: https://www.teses.usp.br/teses/disponiveis/18/18156/tde-05032020-085433/
    • Vancouver

      Miyata HH. Contribuições para o problema flow shop com bloqueio, tempos de setup dependentes da sequência e funções-objetivo hierárquicas sujeitas ao custo total de manutenção preventiva [Internet]. 2020 ;[citado 2024 set. 29 ] Available from: https://www.teses.usp.br/teses/disponiveis/18/18156/tde-05032020-085433/
  • Source: Engineering Optimization. Unidade: EESC

    Subjects: ALGORITMOS, PROGRAMAÇÃO DA PRODUÇÃO, ENGENHARIA DE PRODUÇÃO

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      NAGANO, Marcelo Seido e ALMEIDA, Fernando Siqueira de e MIYATA, Hugo Hissashi. An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time. Engineering Optimization, p. [1-20], 2020Tradução . . Disponível em: https://doi.org/10.1080/0305215X.2020.1797000. Acesso em: 29 set. 2024.
    • APA

      Nagano, M. S., Almeida, F. S. de, & Miyata, H. H. (2020). An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time. Engineering Optimization, [1-20]. doi:10.1080/0305215X.2020.1797000
    • NLM

      Nagano MS, Almeida FS de, Miyata HH. An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time [Internet]. Engineering Optimization. 2020 ; [1-20].[citado 2024 set. 29 ] Available from: https://doi.org/10.1080/0305215X.2020.1797000
    • Vancouver

      Nagano MS, Almeida FS de, Miyata HH. An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time [Internet]. Engineering Optimization. 2020 ; [1-20].[citado 2024 set. 29 ] Available from: https://doi.org/10.1080/0305215X.2020.1797000
  • Source: Computers & Industrial Engineering. Unidade: EESC

    Subjects: HEURÍSTICA, SCHEDULING, SEQUENCIAÇÃO DA PRODUÇÃO, MANUTENÇÃO PREVENTIVA

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MIYATA, Hugo Hissashi e NAGANO, Marcelo Seido e GUPTA, Jatinder N. D. Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization. Computers & Industrial Engineering, v. 135, p. Se 2019, 2019Tradução . . Disponível em: https://doi.org/10.1016/j.cie.2019.05.034. Acesso em: 29 set. 2024.
    • APA

      Miyata, H. H., Nagano, M. S., & Gupta, J. N. D. (2019). Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization. Computers & Industrial Engineering, 135, Se 2019. doi:10.1016/j.cie.2019.05.034
    • NLM

      Miyata HH, Nagano MS, Gupta JND. Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization [Internet]. Computers & Industrial Engineering. 2019 ; 135 Se 2019.[citado 2024 set. 29 ] Available from: https://doi.org/10.1016/j.cie.2019.05.034
    • Vancouver

      Miyata HH, Nagano MS, Gupta JND. Integrating preventive maintenance activities to the no-wait flow shop scheduling problem with dependent-sequence setup times and makespan minimization [Internet]. Computers & Industrial Engineering. 2019 ; 135 Se 2019.[citado 2024 set. 29 ] Available from: https://doi.org/10.1016/j.cie.2019.05.034
  • Source: Expert Systems with Applications: an international journal. Unidade: EESC

    Subjects: SCHEDULING, FLUXOGRAMA, LOJAS

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MIYATA, Hugo Hissashi e NAGANO, Marcelo Seido. The blocking flow shop scheduling problem: a comprehensive and conceptual review. Expert Systems with Applications: an international journal, v. 135, p. 130-156, 2019Tradução . . Disponível em: https://doi.org/10.1016/j.eswa.2019.06.069. Acesso em: 29 set. 2024.
    • APA

      Miyata, H. H., & Nagano, M. S. (2019). The blocking flow shop scheduling problem: a comprehensive and conceptual review. Expert Systems with Applications: an international journal, 135, 130-156. doi:10.1016/j.eswa.2019.06.069
    • NLM

      Miyata HH, Nagano MS. The blocking flow shop scheduling problem: a comprehensive and conceptual review [Internet]. Expert Systems with Applications: an international journal. 2019 ; 135 130-156.[citado 2024 set. 29 ] Available from: https://doi.org/10.1016/j.eswa.2019.06.069
    • Vancouver

      Miyata HH, Nagano MS. The blocking flow shop scheduling problem: a comprehensive and conceptual review [Internet]. Expert Systems with Applications: an international journal. 2019 ; 135 130-156.[citado 2024 set. 29 ] Available from: https://doi.org/10.1016/j.eswa.2019.06.069
  • Source: Journal of Intelligent Manufacturing. Unidade: EESC

    Subjects: COMPRA E VENDA, GESTÃO DE NEGÓCIOS

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      NAGANO, Marcelo Seido e KOMESU, Adriano Seiko e MIYATA, Hugo Hissashi. An evolutionary clustering search for the total tardiness blocking flow shop problem. Journal of Intelligent Manufacturing, v. 30, p. 1843–1857, 2019Tradução . . Disponível em: https://doi.org/10.1007/s10845-017-1358-7. Acesso em: 29 set. 2024.
    • APA

      Nagano, M. S., Komesu, A. S., & Miyata, H. H. (2019). An evolutionary clustering search for the total tardiness blocking flow shop problem. Journal of Intelligent Manufacturing, 30, 1843–1857. doi:10.1007/s10845-017-1358-7
    • NLM

      Nagano MS, Komesu AS, Miyata HH. An evolutionary clustering search for the total tardiness blocking flow shop problem [Internet]. Journal of Intelligent Manufacturing. 2019 ; 30 1843–1857.[citado 2024 set. 29 ] Available from: https://doi.org/10.1007/s10845-017-1358-7
    • Vancouver

      Nagano MS, Komesu AS, Miyata HH. An evolutionary clustering search for the total tardiness blocking flow shop problem [Internet]. Journal of Intelligent Manufacturing. 2019 ; 30 1843–1857.[citado 2024 set. 29 ] Available from: https://doi.org/10.1007/s10845-017-1358-7
  • Source: Engineering Optimization. Unidade: EESC

    Subjects: MANUTENÇÃO PREVENTIVA, HEURÍSTICA, SCHEDULING

    PrivadoAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MIYATA, Hugo Hissashi e NAGANO, Marcelo Seido e GUPTAB, Jatinder N. D. Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study. Engineering Optimization, v. 51, n. 4, 2018Tradução . . Disponível em: https://doi.org/10.1080/0305215X.2018.1485903. Acesso em: 29 set. 2024.
    • APA

      Miyata, H. H., Nagano, M. S., & Guptab, J. N. D. (2018). Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study. Engineering Optimization, 51( 4). doi:10.1080/0305215X.2018.1485903
    • NLM

      Miyata HH, Nagano MS, Guptab JND. Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study [Internet]. Engineering Optimization. 2018 ; 51( 4):[citado 2024 set. 29 ] Available from: https://doi.org/10.1080/0305215X.2018.1485903
    • Vancouver

      Miyata HH, Nagano MS, Guptab JND. Incorporating preventive maintenance into the m-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study [Internet]. Engineering Optimization. 2018 ; 51( 4):[citado 2024 set. 29 ] Available from: https://doi.org/10.1080/0305215X.2018.1485903
  • Source: Revista de Gestão - REGE. Unidade: EESC

    Subjects: GESTÃO DE PROJETOS, AERONAVES

    Versão PublicadaAcesso à fonteDOIHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      JUNQUEIRA, Viviane Souza Vilela e NAGANO, Marcelo Seido e MIYATA, Hugo Hissashi. Procedure structuring for programming aircraft maintenance activities. Revista de Gestão - REGE, v. 27, n. 1, p. 2-20, 2018Tradução . . Disponível em: https://doi.org/10.1108/REGE-02-2018-0026. Acesso em: 29 set. 2024.
    • APA

      Junqueira, V. S. V., Nagano, M. S., & Miyata, H. H. (2018). Procedure structuring for programming aircraft maintenance activities. Revista de Gestão - REGE, 27( 1), 2-20. doi:10.1108/REGE-02-2018-0026
    • NLM

      Junqueira VSV, Nagano MS, Miyata HH. Procedure structuring for programming aircraft maintenance activities [Internet]. Revista de Gestão - REGE. 2018 ; 27( 1): 2-20.[citado 2024 set. 29 ] Available from: https://doi.org/10.1108/REGE-02-2018-0026
    • Vancouver

      Junqueira VSV, Nagano MS, Miyata HH. Procedure structuring for programming aircraft maintenance activities [Internet]. Revista de Gestão - REGE. 2018 ; 27( 1): 2-20.[citado 2024 set. 29 ] Available from: https://doi.org/10.1108/REGE-02-2018-0026
  • Unidade: EESC

    Subjects: PROGRAMAÇÃO DA PRODUÇÃO, HEURÍSTICA (MÉTODOS), MANUTENÇÃO PREVENTIVA

    Acesso à fonteHow to cite
    A citação é gerada automaticamente e pode não estar totalmente de acordo com as normas
    • ABNT

      MIYATA, Hugo Hissashi. Métodos heurísticos para minimização da duração total da programação em ambiente no-wait flow shop com políticas de manutenção preventiva. 2015. Dissertação (Mestrado) – Universidade de São Paulo, São Carlos, 2015. Disponível em: http://www.teses.usp.br/teses/disponiveis/18/18156/tde-28092015-085507/. Acesso em: 29 set. 2024.
    • APA

      Miyata, H. H. (2015). Métodos heurísticos para minimização da duração total da programação em ambiente no-wait flow shop com políticas de manutenção preventiva (Dissertação (Mestrado). Universidade de São Paulo, São Carlos. Recuperado de http://www.teses.usp.br/teses/disponiveis/18/18156/tde-28092015-085507/
    • NLM

      Miyata HH. Métodos heurísticos para minimização da duração total da programação em ambiente no-wait flow shop com políticas de manutenção preventiva [Internet]. 2015 ;[citado 2024 set. 29 ] Available from: http://www.teses.usp.br/teses/disponiveis/18/18156/tde-28092015-085507/
    • Vancouver

      Miyata HH. Métodos heurísticos para minimização da duração total da programação em ambiente no-wait flow shop com políticas de manutenção preventiva [Internet]. 2015 ;[citado 2024 set. 29 ] Available from: http://www.teses.usp.br/teses/disponiveis/18/18156/tde-28092015-085507/

Digital Library of Intellectual Production of Universidade de São Paulo     2012 - 2024